Work Safety (Construction Works) Regulations, 5748-1988

תקנות הבטיחות בעבודה (עבודות בניה), תשמ"ח-1988

Published: 1988-02-04Consolidated Hebrew text as of 2026-10-16 · Last amended 2020-05-21
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

By virtue of my authority under Section 173 of the Work Safety Ordinance [New Version], 5730-1970, I hereby make these Regulations:

Chapter I: Definitions

Definitions§

1.

In these Regulations –

"handrail" – a fencing unit situated parallel to and at the edge of the working surface, intended to prevent a person from falling;

"midrail" – a fencing unit situated between the handrail and the toeboard;

"confirmation of submission of notice of commencement of construction works or engineering construction" – a confirmation issued by a regional labour inspector under regulation 6a(a)(1);

"construction site" – a place where construction work or engineering construction is carried out;

"prefabricated component" – a pre-made component made of reinforced concrete;

"authorised inspector" – a person whom the Chief Labour Inspector has authorised to inspect equipment specified in a provision of the Ordinance;

"professional builder" – (Repealed)

"professional builder for tube-and-fitting scaffolding" – a person whose particulars the Chief Labour Inspector has published on the website under section 173h of the Ordinance, after having approved that it has been proven to his satisfaction that all of the following conditions have been fulfilled in respect of that person:

(1)he has worked for at least three years in construction works;
(2)he has undergone training pursuant to a programme determined by the Chief Labour Inspector;
(3)he has successfully passed an examination pursuant to an examination programme approved by the Chief Labour Inspector;

"construction", "construction works" or "construction operations" – construction operations and engineering construction as defined in the Ordinance and in the Work Safety Order (Engineering Construction Works), 5722-1961;

"prefabricated construction" – construction carried out by way of assembling prefabricated components;

"industrialised construction" – construction carried out by way of casting concrete in industrialised formwork and in the structure itself;

"self-build construction" – one of the following, initiated by a person for the purpose of residential use, not in the framework of a business, occupation, public service, purchasing group or strengthening plan as defined in the Planning and Building Law:

(1)works for the erection of a ground-attached building that is not multi-unit construction;
(2)renovation works;

"multi-unit construction" – construction of four or more dwelling units in a single structure, in at least two storeys;

"safety controller" – a person appointed under regulation 2a;

"sheeting" – a system of walls on the sides of an excavation or fill and their reinforcements, the purpose of which is to prevent the collapse of earth;

"building permit" – a permit as defined in the Planning and Building Law;

"practical engineer" and "registered practical engineer" – as defined in the Certified Practical Engineers and Technicians Law, 5773-2012;

"motorised lifting device" – a machine for lifting a load operated by mechanical, hydraulic or electrical power, excluding a crane and a hoisting tower;

"Certified Practical Engineers and Technicians Law" – Certified Practical Engineers and Technicians Law, 5773-2012;

"Engineers and Architects Law" – Engineers and Architects Law, 5718-1958;

"Planning and Building Law" – Planning and Building Law, 5725-1965;

"certified technician" and "registered certified technician" – as defined in the Certified Practical Engineers and Technicians Law, 5773-2012;

"industrialised formwork" – pre-made formwork intended for repeated use;

"electric cable" or "cable" – a single insulated metallic conductor with a sheath, or several insulated conductors bundled together in the course of their manufacture, having a common sheath;

"toeboard" – a fencing unit installed flush with the edge of the working surface, intended to prevent the fall of materials or equipment;

"construction contractor" – a main contractor or a client who carries out the work, in whole or in part, by means of his own employees or by means of contractors working for him;

"registered engineer" and "licensed engineer" – as defined in the Engineers and Architects Law, 5718-1958;

"client" – a person who has contracted or authorised another to carry out construction works or engineering construction, in whole or in part, and who is one of the following:

(1)in a place where works are carried out that do not require a building permit – the owner of the property;
(2)in a place where works requiring a building permit are carried out – the holder of the permit;

"hoisting tower" – a metal installation used for lifting and lowering materials by means of a platform or a lifting container, the direction of movement of which is restricted by a guide, provided that the said installation is operated by a winch and that the lowering of the load is effected by means of a brake;

"passageway" – an area in which persons work or which serves for the transfer of materials or equipment;

"authorised inspection institute" – (Repealed)

"Training Administration" – the Vocational Training and Manpower Development Administration in the Ministry of Labour;

"safety officer" – as defined in the Labour Inspection Organisation (Safety Officers) Regulations, 5756-1996;

"site manager" – a person appointed by the construction contractor under regulation 2(a)(2);

"work manager" – a person appointed by the construction contractor under regulation 2(a)(1);

"response" – measures implemented to eliminate or reduce a risk;

"formwork system" – a system comprising panels, supports and reinforcements, intended to bear fresh concrete and to transfer all loads applied under the influence of the casting to a bearing surface;

"Chief Labour Inspector", "regional labour inspector", "labour inspector" – as defined in the Labour Inspection Organisation Law, 5714-1954;

"work managers' register" – a register under regulation 2d;

"register of certified practical engineers and technicians" – the register as defined in the Certified Practical Engineers and Technicians Law, 5773-2012;

"working surface" – an area on which a person is present in connection with the performance of work or which serves for holding materials or equipment, including scaffolding;

"extra-low voltage" – a voltage whose level in operation between conductors does not exceed 50 volts;

"scaffolding designer" – a person authorised to design a structure of the type in which scaffolding is used, under the Engineers and Architects Regulations (Licensing and Specialisation of Operations), 5727-1967;

"risk" and "acceptable risk" – as defined in the Labour Inspection Organisation Regulations (Safety Management Plan), 5773-2013;

"infrastructure and development works" – earthworks, excavation, drilling and casting of piles, sheeting, construction of retaining walls, road paving, asphalt works, laying of communication, electricity, sewage, water and drainage lines, execution of channelling works, laying of fuel or gas lines and similar works;

"live load" – the total load comprising the load of workers, materials and equipment;

"renovation works" – construction works or engineering construction carried out in an existing structure that has received a completion certificate;

"scaffolding" – a temporary installation above the ground, above a structure or attached to it, from which a construction operation is performed or on which materials or equipment are held;

"cantilever scaffolding" – scaffolding whose floor is supported on cantilever supports attached to the structure;

"special cantilever scaffolding" – (Repealed)

"tube-and-fitting scaffolding" – scaffolding supported on vertical poles standing on the ground or on another stable support means of the structure;

"special tube-and-fitting scaffolding" – tube-and-fitting scaffolding whose height from the lowest point of the surface on which it stands to the upper surface exceeds 25 metres;

"sawhorse scaffolding" – scaffolding whose floor is supported on mobile supports standing on the ground or on another stable support means of the structure;

"chair scaffolding" or "single-person scaffolding" – scaffolding whose working surface is a chair, bucket, basket or the like;

"special scaffolding" – special tube-and-fitting scaffolding, scaffolding of special shape, or scaffolding constructed from special materials or serving special purposes;

"motorised scaffolding" – scaffolding whose working surfaces can be repositioned by means of mechanical, electrical or hydraulic power, including motorised suspended scaffolding and motorised mast scaffolding as defined in the Work Safety (Work at Height) Regulations, 5767-2007;

"ladder scaffolding" – scaffolding whose floor is supported on ladder rungs;

"independent scaffolding" – scaffolding whose structure ensures its strength and stability without being tied to a structure or other stable body;

"mobile independent scaffolding" – independent scaffolding mounted on wheels;

"putlog scaffolding" – scaffolding whose floor is supported on putlogs passing through the wall of a building; the inner ends of the putlogs are securely anchored inside the building;

"suspended scaffolding" – scaffolding suspended on steel cables, chains, pipes, metal rods, metal profiles or other suspension means, excluding chair scaffolding or a similar installation;

"engineers and architects register" – as defined in the Engineers and Architects Law, 5718-1958;

"general register" – a register maintained at the work site pursuant to section 198 of the Ordinance;

"electric flex" – a flexible electric cable connected to a portable or mobile electrical appliance;

"floor opening" – a void whose smallest dimension exceeds 10 centimetres;

"main contractor" – a person who enters into a contractual agreement with a client to carry out construction work or engineering construction;

"sub-contractor" – a person who has entered into a contractual agreement with a main contractor to carry out construction works or engineering construction;

"electricity line" or "line" – a system of conductors installed together, intended to conduct electric current from one switchboard to another or from the supply source to a main switchboard, or a circuit connecting a supply source or a feeding point directly or through a fuse to one or more distribution switchboards;

"safety harness" – as defined in the Work Safety (Work at Height) Regulations, 5767-2007;

"sheet piling" – walls made of special interlocking metal profiles driven into the ground before execution of the excavation;

"props" – supports for the formwork system, the purpose of which is to transfer an axial force from the form to a bearing surface;

"electric wire", "wire" – a bare metallic conductor, single or stranded, made in the form of a thread, rope or the like.

"safety plan" – one of the following, as the case may be:

(1)at a construction site where the construction contractor employs, himself or through a main contractor or sub-contractors, at least 50 workers – a safety management plan as defined in the Labour Inspection Organisation Regulations (Safety Management Plan), 5773-2013;
(2)at a construction site where the construction contractor employs, himself or through a main contractor or sub-contractors, up to 49 workers – a safety organisation plan for a construction site as defined in regulation 166;

"engineering plan" – a plan for the erection, installation, modification, dismantling or relocation of an installation to ensure the safety of its use in accordance with its purpose, including detailed design and permissible loads, appropriate materials and the required quality and quantity thereof, prepared by a registered engineer or a licensed engineer, attached to the general register and located at the construction site;

"completion certificate" – as defined in the Planning and Building Regulations (Application for Permit, Its Conditions and Fees), 5730-1970;

"Israeli scaffolding standard" – Israeli Standard SI 1139 Part 1 Scaffolding: Performance Requirements and General Design, as updated from time to time, deposited including its updates for public inspection free of charge at the offices of the Chief Labour Inspector at the Ministry of Labour, Welfare and Social Services.

"Work at Height Regulations" – Work Safety (Work at Height) Regulations, 5767-2007;

"Safety Officers Regulations" – Labour Inspection Organisation (Safety Officers) Regulations, 5756-1996.

Chapter I-A: Office Holders at a Construction Site and Their Responsibility

Client§

1a.
(a)A client shall not approve the commencement of construction works as referred to in regulation 2(a)(4), unless all of the following conditions have been fulfilled:
(1)a safety plan has been prepared, and a copy of the plan is attached to the general register and is located at the construction site;
(2)the agreement concluded with the construction contractor details the resources to be allocated for the purpose of implementing the safety plan, with itemisation by chapters of the plan and the risks specified therein; if the client is the construction contractor, the resources shall be detailed as aforesaid in the safety plan;
(3)the client has appointed a safety controller who fulfils the requirements of regulation 2a(a), and has transmitted the safety controller's particulars to the construction contractor for the purpose of reporting under regulation 6a.
(b)If the safety controller ceases to serve in his position, the client shall immediately notify the construction contractor thereof; and for as long as a safety controller has not been appointed, the obligations incumbent on the safety controller under these Regulations shall apply to the client; if the client appoints another safety controller in his place, the construction contractor shall report thereon to the regional labour inspector by means of a form as referred to in regulation 6a; the safety controller may himself notify the termination of his position by means of a form as referred to in regulation 6a.
(c)If the safety controller reports to the client on a risk that is not an acceptable risk under regulation 2a(c), the client shall confirm in writing, no later than 48 hours from the date of the report, that a response has been given to the risk; the client's confirmation shall be delivered to the construction contractor.
(d)This regulation shall not apply if the construction work is one of the types of work listed in regulation 2(g), or self-build construction.

Construction Contractor§

2.
(a)A construction contractor shall not commence or continue construction works or engineering construction at a construction site unless all of the following conditions have been fulfilled:
(1)the construction contractor has appointed a work manager who is registered in the work managers' register in accordance with the classification corresponding to the construction works or engineering construction at the construction site, and has reported the appointment by means of a form as referred to in regulation 6a; a copy of the report of the appointment shall be attached to the general register and shall be located at the construction site;
(2)at a construction site whose area according to the building permit is at least 15,000 square metres – the construction contractor has appointed a site manager who fulfils the requirements set out in regulation 2b(a), and has reported the appointment by means of a form as referred to in regulation 6a; a copy of the report shall be attached to the general register and shall be located at the construction site;
(3)the construction contractor has approved the safety plan by signature and has delivered a copy of the approved plan and every update thereof to the safety controller and to the site manager; a copy of the safety plan shall be attached to the general register and shall be located at the construction site;
(4)the construction contractor has received written approval from the client to commence execution of the construction works or engineering construction, except where the construction work is one of the types of work listed in regulation 2(g), or self-build construction.
(b)A construction contractor shall not carry out construction works or engineering construction except in the presence and under the supervision of the work manager at the construction site, and shall not employ the work manager at the construction site except in duties corresponding to his function under regulation 2c.
(c)If the work manager or the site manager ceases to serve in their position, the construction contractor shall immediately report thereon to the regional labour inspector by means of a form as referred to in regulation 6a; a copy of the report shall be attached to the general register and shall be located at the construction site; a work manager and a site manager may themselves notify the regional labour inspector of the termination of their position by means of a form as referred to in regulation 6a.
(d)If the work manager ceases to serve in his position, including in the circumstances referred to in regulations 3b or 4, the construction contractor shall not continue the construction works or engineering construction until a new work manager has been appointed in accordance with these Regulations.
(e)A construction contractor shall make available to a work manager and a site manager the means and resources required for the fulfilment of their function under regulations 2b(b) and 2c, as the case may be, and shall enable the safety controller to perform his function under regulation 2a.
(f)If the construction contractor becomes aware, including by means of a report under these Regulations, of a risk for which no response has been given in the safety plan, the construction contractor shall provide a response to the risk within a reasonable time according to the level of the risk and shall update the safety plan; if the risk is a risk that is not an acceptable risk, the construction contractor shall act immediately to provide a response to the risk and shall update the safety plan.
(g)Notwithstanding the provisions of sub-regulation (a)(1), if the construction works or engineering construction are of the following types, the construction contractor is not required to appoint a work manager, and the obligations incumbent on a work manager under these Regulations shall also apply to the construction contractor for as long as a work manager has not been appointed as aforesaid:
(1)renovation works for which approval from a licensed engineer is not required under section 12 of the Engineers and Architects Law, 5718-1958;
(2)works exempt from a building permit under the Planning and Building Law;
(3)replacement of a liquefied petroleum gas installation for self-consumption as defined in the Liquefied Petroleum Gas Law, 5781-2020.
(h)At a construction site that does not require the appointment of a site manager under regulation 2(a)(2) and is not as referred to in sub-regulation (g), the obligations incumbent on a site manager under these Regulations shall apply to the work manager; however, if a site manager has been appointed at a construction site that does not require the appointment of a site manager, the obligations shall apply to the appointed site manager.
(i)The construction contractor shall attach appointments, approvals, reports, records and notices delivered to him under these Regulations to the general register and shall keep a copy thereof at the construction site.
(j)The construction contractor shall be regarded as having undertaken to carry out the construction works or engineering construction as referred to in section 191 of the Ordinance.

Safety Controller§

2a.
(a)A person shall be appointed as safety controller only if all of the following conditions are fulfilled in respect of him:
(1)he is a registered engineer in the civil engineering branch or a registered practical engineer in the civil engineering branch, or he holds a valid competency certificate as a safety officer who has undergone a branch-specific training course in construction pursuant to a programme approved by the Chief Labour Inspector;
(2)he has not been appointed as work manager, site manager or safety officer at the same construction site.
(b)A safety controller shall perform all of the following:
(1)shall determine dates for visits to the construction site, at least at the stages of excavation, foundation, erection of the framework and finishing works, if they are being carried out at the construction site, and shall conduct visits on the said dates, as well as at least once every three months;
(2)at each of the visits to the construction site as referred to in paragraph (1), the safety controller shall examine the implementation of the safety plan and the responses given to the safety risks as defined in the safety plan, including the provision of appropriate protective equipment to workers and the conduct of training relating to the risks associated with their work;
(3)shall report in writing to the client and to the construction contractor within 48 hours of the date of the visit on the findings of the visit regarding the matters referred to in paragraph (2).
(c)Without derogating from sub-regulation (b)(3), if the safety controller finds, whether during a visit conducted by him or in any other manner, a risk that is not an acceptable risk under the safety plan, the safety controller shall immediately report thereon in writing to all of the following, and may also give them notice of any other risk found:
(1)to the client;
(2)to the construction contractor;
(3)to the site manager;
(4)to the work manager.
(d)The safety controller shall deliver a copy of the reports referred to in sub-regulations (b)(3) and (c) to the construction contractor.

Site Manager§

2b.
(a)A person shall be appointed as site manager only if all of the following conditions are fulfilled in respect of that person:
(1)he is a registered engineer in the civil engineering branch or a registered practical engineer in the civil engineering branch;
(2)he has not been appointed as a works manager or as a safety controller at the same construction site.
(b)A site manager shall perform all of the following:
(1)confirm by his signature that responses to the risks detailed in the safety plan at the various stages of construction have been provided;
(2)carry out monitoring of the implementation of the responses to the risks prescribed in the safety plan, at least once every 30 days, prepare a report on the monitoring he has carried out, and act to notify the construction contractor if he has found that the responses prescribed in the safety plan are not being implemented; the site manager shall deliver the report on the monitoring he has carried out as aforesaid to the construction contractor;
(3)confirm by his signature that the engineering plans required under regulations 9, 17a, 45, 58, 66a, 85 and 106 exist, for the purpose of carrying out construction works or engineering construction;
(4)carry out monitoring, at least once every 30 days, to verify that training sessions for workers at the construction site are being conducted under regulation 3 of the Labour Inspection Organisation (Disclosure of Information and Training of Employees) Regulations, 5759-1999, and shall deliver a report on the monitoring he has carried out to the construction contractor;
(5)if the site manager has found that a risk that is not an acceptable risk according to the safety plan exists and that the resources required to provide a response to the risk pursuant to the safety plan are lacking, he shall order the cessation of the work connected with the risk and shall immediately deliver a written report thereof to the construction contractor, the client and the safety controller.

Role of Works Manager§

2c.

The role of a works manager at a construction site is to supervise, on behalf of the construction contractor, compliance with the provisions relating to worker safety under these Regulations and to perform every duty imposed on the works manager under any law.

Maintenance of Works Managers Register§

2d.

The Chief Labour Inspector or a person appointed by him for that purpose shall maintain a works managers register in the classification of road construction, infrastructure and development works, or in the classification of the construction industry branch; the works managers register shall be open for public inspection and shall contain the particulars detailed in section 173h of the Ordinance.

Qualifications of a Works Manager§

3.
(a)No person shall be registered in the works managers register unless one of the following applies to him:
(1)he holds a certificate attesting that he has successfully completed a works managers course for the construction industry branch or a works managers course for road construction, infrastructure and development works, as the case may be, whose curriculum has been approved by the Chief Labour Inspector in accordance with the provisions of sub-regulation (b) and was conducted by the Training Administration;
(2)he is a registered engineer in the civil engineering branch or a registered practical engineer or a registered certified technician in the civil engineering branch, provided that he has accumulated at least 12 months of experience in construction works after completing his engineering, practical engineering or technician studies, as the case may be, and has successfully passed a safety examination in construction works and engineering construction before a committee appointed by the head of the Training Administration with the consent of the Chief Labour Inspector.
(b)A works managers course under sub-regulation (a)(1) shall include the following subjects:
(1)formwork;
(2)earthworks and excavation;
(3)scaffolding;
(4)work at height;
(5)risk prevention;
(6)lifting and conveying equipment;
(7)methods of risk analysis and assessment;
(8)demolition and construction;
(9)coping with climate risks;
(10)components of a safety plan and an engineering plan;
(11)organisation of safety at a construction site.

Validity of Registration and Conditions for Its Renewal§

3a.
(a)The validity of a works manager's registration in the works managers register is for five years at a time.
(b)A works manager's registration shall not be renewed if, during the period since he was first registered in the works managers register or since his registration was last renewed, whichever is later, he had no appointment as a works manager, or he had an appointment as a works manager for fewer than 90 days in aggregate, all unless, according to the data of the Training Administration, he participated in two training courses under sub-regulation (c) during that period.
(c)A training course shall be conducted under the supervision of the Training Administration, covering no less than 8 study hours on the following subjects:
(1)familiarity with the components of a safety plan and an engineering plan;
(2)risk analysis and assessment;
(3)safety in earthworks, excavations, demolition and construction;
(4)safety in work at height;
(5)electrical safety;
(6)safety in equipment subject to inspection, lifting and conveying equipment, formwork and scaffolding;
(7)coping with climate risks;
(8)duties of a works manager and other office holders as referred to in this Chapter at the construction site;
(9)organisation of safety at a construction site.
(d)A works manager whose registration has not been renewed under sub-regulation (b) or who has been removed from the works managers register as referred to in regulation 4 may apply to the Chief Labour Inspector to be registered again in the register, after having successfully passed an examination under this regulation.
(e)The Training Administration shall conduct, for works managers who have been removed from the works managers register or whose registration has not been renewed, an examination approved by the Chief Labour Inspector; the examination shall cover the subjects listed in sub-regulation (c); the Training Administration shall publish a notice of the date and place of the examination on the Ministry of Labour's website.
(f)A candidate who has failed an examination under this regulation may appeal in writing against its result before the Training Administration, within 30 days from the day the examination results were published; the candidate shall give reasons for his appeal and shall indicate the address to which the decision on the appeal is to be sent; a decision on the appeal shall be sent to the candidate in writing within 30 working days.
(g)A candidate who has failed an examination under this regulation may repeat that examination twice more; if the candidate fails for the third time, he shall not be entitled to sit a further examination unless he has participated in two training courses as referred to in sub-regulation (c) in the half year preceding the date of the further examination.

Objection to Appointment or Order to Cease Work of a Works Manager at a Site§

3b.
(a)A regional labour inspector may object to the appointment of a works manager at a construction site or order the cessation of his work at the construction site at which he was appointed, in the following cases, provided that the works manager has been given an opportunity to present his arguments:
(1)he is of the opinion that the appointed works manager is incapable of performing the role due to a professional background or experience that is not suitable for fulfilling the role in terms of its complexity or the scope of work at the construction site;
(2)a pre-disqualification inquiry proceeding under regulation 4 or a proceeding prior to the cancellation, non-renewal, restriction, conditioning or suspension of an authorisation as referred to in section 173c of the Ordinance is pending against the works manager.
(b)A regional labour inspector's decision on an objection to an appointment or on the cessation of a works manager's work shall be reasoned in writing and shall be delivered to the construction contractor and to the works manager, or posted at the construction site; the notice as aforesaid shall require the construction contractor to act to appoint another works manager under regulation 2, as a condition for the continuation of work at the construction site.
(c)A person who considers himself aggrieved by a regional labour inspector's decision under this regulation may appeal against it in writing before the Chief Labour Inspector, and the provisions of sections 173f and 173g of the Ordinance shall apply to the appeal and to an appeal against the decision thereon.
(d)As long as no decision has been given on an appeal under sub-regulation (c), if one has been submitted, the objection to the appointment of the works manager shall remain in force.

Disqualification of a Works Manager§

4.
(a)The Chief Labour Inspector may, at any time, after having given the works manager an opportunity to present his arguments, by a reasoned written decision, disqualify a works manager and order his removal from the works managers register on any of the following grounds, even if the requirements of regulation 3 are fulfilled in respect of him:
(1)he is of the opinion that there is a defect by reason of which the works manager does not fulfil or is incapable of fulfilling his role as referred to in regulation 2c or the duties imposed on him as a works manager under any law;
(2)the works manager has been convicted or an indictment is pending against him for an offence that, by reason of its nature, gravity or circumstances, renders him, in the opinion of the Chief Labour Inspector, unfit to be appointed as a works manager;
(3)he has been declared legally incompetent or a guardian has been appointed for him under section 33(a) of the Legal Capacity and Guardianship Law, 5722-1962.
(b)Notice of the disqualification of a works manager shall be delivered to the construction contractor who appointed the works manager or posted at the construction site; the notice as aforesaid shall require the construction contractor to act to appoint another works manager under regulation 2, as a condition for the continuation of work at the construction site.
(c)A person who considers himself aggrieved by a decision of the Chief Labour Inspector under this regulation may request a re-examination or appeal against the decision under sections 173e and 173g of the Ordinance.
(d)As long as no decision has been given on an appeal or a request for re-examination under sub-regulation (c), as the case may be, if one has been submitted, the disqualification of the works manager shall remain in force.
5.§

(Repealed — תשפ״ו)

Safety Officer at a Construction Site§

5a.
(a)If the construction contractor has appointed a safety officer, the following duties shall also apply to the safety officer:
(1)if the safety officer has identified safety and hygiene hazards as referred to in regulation 10(a)(1) of the Safety Officers Regulations or a breach of safety provisions under regulation 10(a)(9) of the Safety Officers Regulations, he shall, in addition to the notice or report he delivers to the construction contractor under those regulations, deliver a report thereon to the works manager and the site manager, if one has been appointed; such a report shall be delivered as soon as possible to the time at which the safety and hygiene hazard was identified and no later than within 48 hours; a copy of the report shall be attached to the general log and shall be kept at the construction site;
(2)in the report referred to in paragraph (1), the safety officer shall also detail hazards and breaches reported in previous reports delivered at the same construction site that have not yet been remedied;
(3)in the report referred to in paragraph (1), the safety officer shall also detail the actions he has taken with respect to the safety plan and the updates required therein, if any, under regulation 10(a)(5) of the Safety Officers Regulations, as well as with respect to the implementation of the instructions of the safety plan and the inclusion of safety and hygiene requirements in up-to-date instructions, under regulation 10(a)(6) of the Safety Officers Regulations;
(4)if the safety officer has ordered the cessation of work under regulation 10(a)(16) of the Safety Officers Regulations on the grounds prescribed in the First Schedule, he shall, in addition to the report he delivers to the construction contractor under those regulations, immediately deliver a report thereof to the works manager, the safety controller and the site manager, if one has been appointed, and shall also notify the regional labour inspector thereof by means of an online form drawn up in accordance with the form set out in the First Schedule.

Principal Contractor and Subcontractors§

6.
(a)If the client has entrusted the execution of the construction to a principal contractor, the principal contractor shall be regarded as the construction contractor for the purposes of these Regulations and the duties imposed by these Regulations on the construction contractor are imposed on him.
(b)If a principal contractor employs subcontractors in the execution of a construction operation, the principal contractor shall be regarded as the construction contractor as referred to in sub-regulation (a).
(c)If the client has entrusted the execution of the construction operation to more than one principal contractor, the client shall be regarded as the construction contractor for the purposes of these Regulations and the duties imposed on the construction contractor are imposed on him.
(d)The provision of sub-regulation (c) shall not apply if one of the principal contractors has accepted overall responsibility as a construction contractor for the implementation of these Regulations, has confirmed this in writing and has sent notice of the appointment, as referred to in regulation 6a, to the regional labour inspector in whose area the work is being carried out.

Notice of Construction Works or Engineering Construction§

6a.
(a)The construction contractor shall notify the regional labour inspector immediately of each of the matters listed below, by means of an online form drawn up and signed in accordance with the form set out in the Second Schedule in the Part indicated beside it, and if he has so notified – the regional labour inspector shall issue him with a confirmation of submission of the notice as the case may be:
(1)notice of commencement of construction work or engineering construction as referred to in section 192(a) of the Ordinance, as well as of the appointment of a safety controller, a works manager or a site manager – in accordance with Part 1 of the Second Schedule;
(2)notice of completion of construction work or engineering construction – in accordance with Part 2 of the Second Schedule;
(3)notice of the replacement of a safety controller, a works manager or a site manager – in accordance with Part 3 of the Second Schedule.
(b)Copies of the notices referred to in sub-regulation (a) shall be kept in the general log and shall be kept at the construction site.

Display of Sign§

7.

A construction contractor shall display, in a prominent place, at the site at which the construction operation is being carried out, a sign indicating the following particulars:

(1)the name and address of the construction contractor;
(2)the name and address of the works manager;
(3)the nature of the work being carried out;
(4)the name and address of the client;
(5)the name of the safety controller and his registration number in the engineers and architects register or in the registered practical engineers and certified technicians register, or his competency approval as a safety officer, as the case may be;
(6)the name of the site manager and his registration number in the engineers and architects register or in the registered practical engineers and certified technicians register, as the case may be.

Change history

  1. Section 1 expanded the definitions section substantially, adding new terms including "confirmation of submission of notice of commencement of construction works", "professional builder for tube-and-fitting scaffolding", "safety controller", "site manager", and "work manager", whilst repealing definitions for "professional builder" and "special cantilever scaffolding" and "authorised inspection…

    • §1 amended — Definitions
    • §2 amended — Construction Contractor
    • §3 amended — Qualifications of a Works Manager
    • §4 amended — Disqualification of a Works Manager
    • §5 amended
    • §6 amended — Principal Contractor and Subcontractors
    • §7 amended — Display of Sign
    • §9 amended — Fencing
    • §10 amended
    • §11a amended — Special Fencing Measures
    • §16 amended — Obligation to Install Scaffolding
    • §17 amended — Supervision by a Professional Builder for Tube-and-Fitting Scaffolding
    • §17a amended — Special Scaffolding
    • §19 amended — Inspection and Storage of Materials
    • §20 amended — Inspection of Scaffolding
    • §22a amended — Alterations to Scaffolding
    • §24 amended — Lifting Installations on Scaffolding
    • §31 amended — Gap between scaffolding and wall
    • §36 amended
    • §38 amended
    • §39 amended
    • §40 amended
    • §41 amended
    • §42 amended
    • §43 amended
    • §44 amended
    • §45 amended — Mechanised scaffolding
    • §46 amended
    • §47 amended
    • §48 amended
    • §49 amended
    • §50 amended — Inspection of mechanised scaffolding
    • §51 amended — Report on the inspection
    • §53 amended
    • §58 amended — Suspended scaffolding
    • §66 amended
    • §67 amended
    • §68 amended
    • §69 amended
    • §71 amended
    • §79 amended — Fencing of openings
    • §80 amended — Fencing of a void in a wall
    • §82 amended — Structure and maintenance
    • §83 amended — Materials for formwork
    • §84 amended — Inspection before casting
    • §85 amended — Design of formwork
    • §86 amended
    • §88 amended — Manner of positioning supports
    • §89 amended
    • §90 amended
    • §91 amended
    • §92 amended
    • §93 amended
    • §94 amended
    • §95 amended
    • §96 amended
    • §97 amended
    • §98 amended
    • §99 amended
    • §99a amended
    • §101 amended — Lifting devices
    • §106 amended — Erection of a metal structure
    • §108 amended
    • §109 amended
    • §110 amended
    • §115 amended — Fencing of a pit, excavation or slope
    • §125 amended — Inspection of a quarried wall and removal of projecting or loose material
    • §129 amended
    • §131 amended — Warning
    • §132 amended — Stoppage of work
    • §143 amended
    • §144 amended
    • §145 amended
    • §146 amended
    • §147 amended
    • §148 amended
    • §149 amended
    • §150 amended
    • §151 amended
    • §152 amended
    • §153 amended
    • §154 amended
    • §155 amended
    • §156 amended
    • §157 amended
    • §158 amended
    • §159 amended
    • §160 amended
    • §161 amended
    • §162 amended
    • §166 amended — Safety organisation plan for a construction site
    • §167 amended — Lime pit
    • §168 amended
    • §1a added — Client
    • §2a added — Safety Controller
    • §2b added — Site Manager
    • §2c added — Role of Works Manager
    • §2d added — Maintenance of Works Managers Register
    • §3a added — Validity of Registration and Conditions for Its Renewal
    • §3b added — Objection to Appointment or Order to Cease Work of a Works Manager at a Site
    • §5a added — Safety Officer at a Construction Site
    • §6a added — Notice of Construction Works or Engineering Construction
    • §69a added — Cantilevered scaffolding and bracket scaffolding
    • §142a added — Safety inspection
    • §s3i0 added
    • §s3i1 added
    • §s3i2 added
    • §s3i3 added
    • §s3i4 added
    • §s3i5 added
    • §s3i6 added
    • §s3i7 added
    • §s3i8 added

Page 1 of 5

Read the entire law on one page — continuous text, no page breaks, plus formal citations.

RegulationsHealthLabor Law

תקנות הבטיחות בעבודה (עבודות בניה), תשמ"ח-1988

construction safety regulations

work safety construction

takkanot betichut avoda

construction works regulations

workplace safety construction

Israeli construction safety

building safety regulations

occupational safety construction

5748-1988