Work Safety (Construction Works) Regulations, 5748-1988
תקנות הבטיחות בעבודה (עבודות בניה), תשמ"ח-1988
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More
This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.
Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.
The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.
This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.
By virtue of my authority under Section 173 of the Work Safety Ordinance [New Version], 5730-1970, I hereby make these Regulations:
Chapter I: Definitions
Definitions§
In these Regulations –
"handrail" – a fencing unit situated parallel to and at the edge of the working surface, intended to prevent a person from falling;
"midrail" – a fencing unit situated between the handrail and the toeboard;
"confirmation of submission of notice of commencement of construction works or engineering construction" – a confirmation issued by a regional labour inspector under regulation 6a(a)(1);
"construction site" – a place where construction work or engineering construction is carried out;
"prefabricated component" – a pre-made component made of reinforced concrete;
"authorised inspector" – a person whom the Chief Labour Inspector has authorised to inspect equipment specified in a provision of the Ordinance;
"professional builder" – (Repealed)
"professional builder for tube-and-fitting scaffolding" – a person whose particulars the Chief Labour Inspector has published on the website under section 173h of the Ordinance, after having approved that it has been proven to his satisfaction that all of the following conditions have been fulfilled in respect of that person:
"construction", "construction works" or "construction operations" – construction operations and engineering construction as defined in the Ordinance and in the Work Safety Order (Engineering Construction Works), 5722-1961;
"prefabricated construction" – construction carried out by way of assembling prefabricated components;
"industrialised construction" – construction carried out by way of casting concrete in industrialised formwork and in the structure itself;
"self-build construction" – one of the following, initiated by a person for the purpose of residential use, not in the framework of a business, occupation, public service, purchasing group or strengthening plan as defined in the Planning and Building Law:
"multi-unit construction" – construction of four or more dwelling units in a single structure, in at least two storeys;
"safety controller" – a person appointed under regulation 2a;
"sheeting" – a system of walls on the sides of an excavation or fill and their reinforcements, the purpose of which is to prevent the collapse of earth;
"building permit" – a permit as defined in the Planning and Building Law;
"practical engineer" and "registered practical engineer" – as defined in the Certified Practical Engineers and Technicians Law, 5773-2012;
"motorised lifting device" – a machine for lifting a load operated by mechanical, hydraulic or electrical power, excluding a crane and a hoisting tower;
"Certified Practical Engineers and Technicians Law" – Certified Practical Engineers and Technicians Law, 5773-2012;
"Engineers and Architects Law" – Engineers and Architects Law, 5718-1958;
"Planning and Building Law" – Planning and Building Law, 5725-1965;
"certified technician" and "registered certified technician" – as defined in the Certified Practical Engineers and Technicians Law, 5773-2012;
"industrialised formwork" – pre-made formwork intended for repeated use;
"electric cable" or "cable" – a single insulated metallic conductor with a sheath, or several insulated conductors bundled together in the course of their manufacture, having a common sheath;
"toeboard" – a fencing unit installed flush with the edge of the working surface, intended to prevent the fall of materials or equipment;
"construction contractor" – a main contractor or a client who carries out the work, in whole or in part, by means of his own employees or by means of contractors working for him;
"registered engineer" and "licensed engineer" – as defined in the Engineers and Architects Law, 5718-1958;
"client" – a person who has contracted or authorised another to carry out construction works or engineering construction, in whole or in part, and who is one of the following:
"hoisting tower" – a metal installation used for lifting and lowering materials by means of a platform or a lifting container, the direction of movement of which is restricted by a guide, provided that the said installation is operated by a winch and that the lowering of the load is effected by means of a brake;
"passageway" – an area in which persons work or which serves for the transfer of materials or equipment;
"authorised inspection institute" – (Repealed)
"Training Administration" – the Vocational Training and Manpower Development Administration in the Ministry of Labour;
"safety officer" – as defined in the Labour Inspection Organisation (Safety Officers) Regulations, 5756-1996;
"site manager" – a person appointed by the construction contractor under regulation 2(a)(2);
"work manager" – a person appointed by the construction contractor under regulation 2(a)(1);
"response" – measures implemented to eliminate or reduce a risk;
"formwork system" – a system comprising panels, supports and reinforcements, intended to bear fresh concrete and to transfer all loads applied under the influence of the casting to a bearing surface;
"Chief Labour Inspector", "regional labour inspector", "labour inspector" – as defined in the Labour Inspection Organisation Law, 5714-1954;
"work managers' register" – a register under regulation 2d;
"register of certified practical engineers and technicians" – the register as defined in the Certified Practical Engineers and Technicians Law, 5773-2012;
"working surface" – an area on which a person is present in connection with the performance of work or which serves for holding materials or equipment, including scaffolding;
"extra-low voltage" – a voltage whose level in operation between conductors does not exceed 50 volts;
"scaffolding designer" – a person authorised to design a structure of the type in which scaffolding is used, under the Engineers and Architects Regulations (Licensing and Specialisation of Operations), 5727-1967;
"risk" and "acceptable risk" – as defined in the Labour Inspection Organisation Regulations (Safety Management Plan), 5773-2013;
"infrastructure and development works" – earthworks, excavation, drilling and casting of piles, sheeting, construction of retaining walls, road paving, asphalt works, laying of communication, electricity, sewage, water and drainage lines, execution of channelling works, laying of fuel or gas lines and similar works;
"live load" – the total load comprising the load of workers, materials and equipment;
"renovation works" – construction works or engineering construction carried out in an existing structure that has received a completion certificate;
"scaffolding" – a temporary installation above the ground, above a structure or attached to it, from which a construction operation is performed or on which materials or equipment are held;
"cantilever scaffolding" – scaffolding whose floor is supported on cantilever supports attached to the structure;
"special cantilever scaffolding" – (Repealed)
"tube-and-fitting scaffolding" – scaffolding supported on vertical poles standing on the ground or on another stable support means of the structure;
"special tube-and-fitting scaffolding" – tube-and-fitting scaffolding whose height from the lowest point of the surface on which it stands to the upper surface exceeds 25 metres;
"sawhorse scaffolding" – scaffolding whose floor is supported on mobile supports standing on the ground or on another stable support means of the structure;
"chair scaffolding" or "single-person scaffolding" – scaffolding whose working surface is a chair, bucket, basket or the like;
"special scaffolding" – special tube-and-fitting scaffolding, scaffolding of special shape, or scaffolding constructed from special materials or serving special purposes;
"motorised scaffolding" – scaffolding whose working surfaces can be repositioned by means of mechanical, electrical or hydraulic power, including motorised suspended scaffolding and motorised mast scaffolding as defined in the Work Safety (Work at Height) Regulations, 5767-2007;
"ladder scaffolding" – scaffolding whose floor is supported on ladder rungs;
"independent scaffolding" – scaffolding whose structure ensures its strength and stability without being tied to a structure or other stable body;
"mobile independent scaffolding" – independent scaffolding mounted on wheels;
"putlog scaffolding" – scaffolding whose floor is supported on putlogs passing through the wall of a building; the inner ends of the putlogs are securely anchored inside the building;
"suspended scaffolding" – scaffolding suspended on steel cables, chains, pipes, metal rods, metal profiles or other suspension means, excluding chair scaffolding or a similar installation;
"engineers and architects register" – as defined in the Engineers and Architects Law, 5718-1958;
"general register" – a register maintained at the work site pursuant to section 198 of the Ordinance;
"electric flex" – a flexible electric cable connected to a portable or mobile electrical appliance;
"floor opening" – a void whose smallest dimension exceeds 10 centimetres;
"main contractor" – a person who enters into a contractual agreement with a client to carry out construction work or engineering construction;
"sub-contractor" – a person who has entered into a contractual agreement with a main contractor to carry out construction works or engineering construction;
"electricity line" or "line" – a system of conductors installed together, intended to conduct electric current from one switchboard to another or from the supply source to a main switchboard, or a circuit connecting a supply source or a feeding point directly or through a fuse to one or more distribution switchboards;
"safety harness" – as defined in the Work Safety (Work at Height) Regulations, 5767-2007;
"sheet piling" – walls made of special interlocking metal profiles driven into the ground before execution of the excavation;
"props" – supports for the formwork system, the purpose of which is to transfer an axial force from the form to a bearing surface;
"electric wire", "wire" – a bare metallic conductor, single or stranded, made in the form of a thread, rope or the like.
"safety plan" – one of the following, as the case may be:
"engineering plan" – a plan for the erection, installation, modification, dismantling or relocation of an installation to ensure the safety of its use in accordance with its purpose, including detailed design and permissible loads, appropriate materials and the required quality and quantity thereof, prepared by a registered engineer or a licensed engineer, attached to the general register and located at the construction site;
"completion certificate" – as defined in the Planning and Building Regulations (Application for Permit, Its Conditions and Fees), 5730-1970;
"Israeli scaffolding standard" – Israeli Standard SI 1139 Part 1 Scaffolding: Performance Requirements and General Design, as updated from time to time, deposited including its updates for public inspection free of charge at the offices of the Chief Labour Inspector at the Ministry of Labour, Welfare and Social Services.
"Work at Height Regulations" – Work Safety (Work at Height) Regulations, 5767-2007;
"Safety Officers Regulations" – Labour Inspection Organisation (Safety Officers) Regulations, 5756-1996.
Chapter I-A: Office Holders at a Construction Site and Their Responsibility
Client§
Construction Contractor§
Safety Controller§
Site Manager§
Role of Works Manager§
The role of a works manager at a construction site is to supervise, on behalf of the construction contractor, compliance with the provisions relating to worker safety under these Regulations and to perform every duty imposed on the works manager under any law.
Maintenance of Works Managers Register§
The Chief Labour Inspector or a person appointed by him for that purpose shall maintain a works managers register in the classification of road construction, infrastructure and development works, or in the classification of the construction industry branch; the works managers register shall be open for public inspection and shall contain the particulars detailed in section 173h of the Ordinance.
Qualifications of a Works Manager§
Validity of Registration and Conditions for Its Renewal§
Objection to Appointment or Order to Cease Work of a Works Manager at a Site§
Disqualification of a Works Manager§
(Repealed — תשפ״ו)
Safety Officer at a Construction Site§
Principal Contractor and Subcontractors§
Notice of Construction Works or Engineering Construction§
Display of Sign§
A construction contractor shall display, in a prominent place, at the site at which the construction operation is being carried out, a sign indicating the following particulars:
Change history
Section 1 expanded the definitions section substantially, adding new terms including "confirmation of submission of notice of commencement of construction works", "professional builder for tube-and-fitting scaffolding", "safety controller", "site manager", and "work manager", whilst repealing definitions for "professional builder" and "special cantilever scaffolding" and "authorised inspection…
- §1 amended — Definitions
- §2 amended — Construction Contractor
- §3 amended — Qualifications of a Works Manager
- §4 amended — Disqualification of a Works Manager
- §5 amended
- §6 amended — Principal Contractor and Subcontractors
- §7 amended — Display of Sign
- §9 amended — Fencing
- §10 amended
- §11a amended — Special Fencing Measures
- §16 amended — Obligation to Install Scaffolding
- §17 amended — Supervision by a Professional Builder for Tube-and-Fitting Scaffolding
- §17a amended — Special Scaffolding
- §19 amended — Inspection and Storage of Materials
- §20 amended — Inspection of Scaffolding
- §22a amended — Alterations to Scaffolding
- §24 amended — Lifting Installations on Scaffolding
- §31 amended — Gap between scaffolding and wall
- §36 amended
- §38 amended
- §39 amended
- §40 amended
- §41 amended
- §42 amended
- §43 amended
- §44 amended
- §45 amended — Mechanised scaffolding
- §46 amended
- §47 amended
- §48 amended
- §49 amended
- §50 amended — Inspection of mechanised scaffolding
- §51 amended — Report on the inspection
- §53 amended
- §58 amended — Suspended scaffolding
- §66 amended
- §67 amended
- §68 amended
- §69 amended
- §71 amended
- §79 amended — Fencing of openings
- §80 amended — Fencing of a void in a wall
- §82 amended — Structure and maintenance
- §83 amended — Materials for formwork
- §84 amended — Inspection before casting
- §85 amended — Design of formwork
- §86 amended
- §88 amended — Manner of positioning supports
- §89 amended
- §90 amended
- §91 amended
- §92 amended
- §93 amended
- §94 amended
- §95 amended
- §96 amended
- §97 amended
- §98 amended
- §99 amended
- §99a amended
- §101 amended — Lifting devices
- §106 amended — Erection of a metal structure
- §108 amended
- §109 amended
- §110 amended
- §115 amended — Fencing of a pit, excavation or slope
- §125 amended — Inspection of a quarried wall and removal of projecting or loose material
- §129 amended
- §131 amended — Warning
- §132 amended — Stoppage of work
- §143 amended
- §144 amended
- §145 amended
- §146 amended
- §147 amended
- §148 amended
- §149 amended
- §150 amended
- §151 amended
- §152 amended
- §153 amended
- §154 amended
- §155 amended
- §156 amended
- §157 amended
- §158 amended
- §159 amended
- §160 amended
- §161 amended
- §162 amended
- §166 amended — Safety organisation plan for a construction site
- §167 amended — Lime pit
- §168 amended
- §1a added — Client
- §2a added — Safety Controller
- §2b added — Site Manager
- §2c added — Role of Works Manager
- §2d added — Maintenance of Works Managers Register
- §3a added — Validity of Registration and Conditions for Its Renewal
- §3b added — Objection to Appointment or Order to Cease Work of a Works Manager at a Site
- §5a added — Safety Officer at a Construction Site
- §6a added — Notice of Construction Works or Engineering Construction
- §69a added — Cantilevered scaffolding and bracket scaffolding
- §142a added — Safety inspection
- §s3i0 added
- §s3i1 added
- §s3i2 added
- §s3i3 added
- §s3i4 added
- §s3i5 added
- §s3i6 added
- §s3i7 added
- §s3i8 added
Read the entire law on one page — continuous text, no page breaks, plus formal citations.
Made under
Other regulations under the Work Safety Ordinance [New Version]
- Work Safety (Crane Operators, Operators of Other Lifting Machines and Signallers) Regulations, 5753-1992
- Work Safety (Direct-Action Nail-Driving Devices) Regulations, 5744-1984
- Work Safety (First Aid in Workplaces) Regulations, 5748-1988
- Work Safety (Hydrostatic Pressure Testing of a Pressure Installation) Regulations, 5756-1995
- Work Safety (Installation of a Door in a Lift Car) Regulations, 5753-1993
- Work Safety (Lifting of Persons by Forklifts) Regulations, 5743-1983
תקנות הבטיחות בעבודה (עבודות בניה), תשמ"ח-1988
construction safety regulations
work safety construction
takkanot betichut avoda
construction works regulations
workplace safety construction
Israeli construction safety
building safety regulations
occupational safety construction
5748-1988