Work Safety (Hydrostatic Pressure Testing of a Pressure Installation) Regulations, 5756-1995

תקנות הבטיחות בעבודה (בדיקה בלחץ הידרוסטטי של מיתקן לחץ), תשנ"ו-1995

Published: 1995-12-05Consolidated Hebrew text as of 2023-09-18 · Last amended 2020-05-21
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

By virtue of my authority under Sections 107, 173 and 216 of the Work Safety Ordinance [New Version], 5730-1970 (hereinafter – the Ordinance), I hereby make these Regulations:

Chapter I: Interpretation

Definitions§

1.

In these Regulations –

"authorised boiler inspector" – as defined in the Ordinance;

"hydrostatic pressure test" – a test at water pressure or other non-hazardous liquid pressure, at ambient temperature, carried out at a pressure determined by the manufacturer or, in the absence thereof, by the authorised boiler inspector;

"steam boiler", "pressure installation" and "steam receiver" – as defined in the Ordinance;

"air receiver" – as defined in the Ordinance, excluding an air receiver that also contains oil within it;

"report" – as defined in section 119a of the Ordinance;

"Chief Labour Inspector" and "Regional Labour Inspector" – as defined in the Labour Inspection (Organisation) Law, 5714-1954.

Chapter II: Steam Boiler

Hydrostatic Pressure Test§

2.

A steam boiler shall be tested by hydrostatic pressure by an authorised boiler inspector in the following cases:

(1)before the installation of insulation – at the manufacturer's premises;
(2)after its placement in its permanent location and before its operation, in a steam boiler whose heating surface area exceeds 30 square metres;
(3)after the carrying out of substantial repairs requiring welding on its pressure-bearing parts, after the replacement of heating tubes or their plugging, or after the replacement of the flame tube, after the replacement or modification of internal reinforcements, or any other repair that an authorised boiler inspector has determined requires such a test;
(4)if it lacks documentation of the design pressure or of previous tests;
(5)after a change of its permanent location and its placement in the new location;
(6)after chemical cleaning of it;
(7)after any continuous cessation of operation exceeding 24 months;
(8)at the end of 9 years from its year of manufacture, every 6 years thereafter, and from year 21 onwards – every 3 years;
(9)at the discretion of the authorised boiler inspector;
(10)as determined by a Regional Labour Inspector.

Chapter III: Steam Receiver

Hydrostatic Pressure Test§

3.

A steam receiver shall be tested by hydrostatic pressure by an authorised boiler inspector in the following cases:

(1)upon completion of its manufacture and before the installation of insulation in it;
(2)after the carrying out of repairs that included welding on the pressure-bearing parts of the steam receiver, or any other repair that the authorised boiler inspector has determined requires such a test;
(3)if it lacks documentation of the design pressure or of previous tests;
(4)every 10 years from its year of manufacture and from year 21 onwards – every 6 additional years, except where it is a steam receiver in which the product of the design pressure (bar) multiplied by its volume (litres) is less than 200 and whose design pressure does not exceed 8 bar;
(5)at the discretion of the authorised boiler inspector;
(6)as determined by a Regional Labour Inspector.

Alternative Test§

4.

Notwithstanding the provisions of regulation 3(4), instead of the hydrostatic pressure test, a thorough internal inspection combined with a non-destructive test of the wall thickness of the receiver may be carried out; the particulars of the non-destructive test and its results shall be set out in the report.

Chapter IV: Air Receiver

Hydrostatic Pressure Test§

5.

An air receiver shall be tested by hydrostatic pressure by an authorised boiler inspector in the following cases:

(1)upon completion of its manufacture;
(2)after the carrying out of repairs that include welding on the shell, the caps, or the branches of the receiver, or any other repair that the authorised boiler inspector has determined requires such a test;
(3)if it lacks documentation of the design pressure or of previous tests;
(4)every 10 years from its year of manufacture and from year 21 onwards – every 6 additional years; this provision shall not apply if it is an air receiver in which the product of the design pressure (bar) multiplied by its volume (litres) is less than 200 and whose design pressure does not exceed 8 bar, or if it is an air receiver manufactured by drawing as referred to in section 115(b) of the Ordinance, which shall be tested every 12 years from its year of manufacture and from year 24 onwards – every 8 additional years;
(5)at the discretion of the authorised boiler inspector;
(6)as determined by a Regional Labour Inspector.

Alternative Test§

6.

Notwithstanding the provisions of regulation 5(4), instead of the periodic hydrostatic pressure test, one of the following may be carried out:

(1)a pneumatic pressure test at 1.1 times the permissible working pressure of the air receiver, into which the introduction of water or other liquid is prohibited, and while taking the required safety measures;
(2)a thorough internal inspection combined with a non-destructive test of the wall thickness of the receiver; the particulars of the non-destructive test and its results shall be set out in the report.

Chapter V: General

Exemption§

7.

The Chief Labour Inspector may, in special cases, exempt from the provisions of these Regulations, in whole or in part, if the Chief Labour Inspector is satisfied that in the circumstances of the matter they are not applicable.

Repeal§

8.

The following are repealed –

(1)Work Safety (Hydrostatic Pressure Testing of a Steam Boiler) Regulations, 5747-1986;
(2)Work Safety (Hydrostatic Pressure Testing of a Steam Receiver) Regulations, 5746-1986;
(3)Work Safety (Hydrostatic Pressure Testing of an Air Receiver) Regulations, 5746-1986.

Commencement§

9.

These Regulations shall commence 30 days from the date of their publication.

RegulationsHealthLabor Law

תקנות הבטיחות בעבודה (בדיקה בלחץ הידרוסטטי של מיתקן לחץ), תשנ"ו-1995

hydrostatic pressure testing regulations

pressure installation testing

work safety pressure regulations

hydrostatic test regulations

pressure vessel safety regulations

taknotot betichut avoda dika

pressure equipment testing law

industrial pressure safety