Israeli Legislation.com
RegulationsHealthLabor Law

Work Safety (Construction Works) Regulations, 5748-1988

תקנות הבטיחות בעבודה (עבודות בניה), תשמ"ח-1988

Published: 1988-02-04Consolidated Hebrew text as of 2026-10-16 · Last amended 2020-05-21
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

Chapter VII: Prefabricated Construction

Strength of Component§

100.

A construction operator is responsible for ensuring that a prefabricated component is of adequate strength and rigidity and is such that its integrity is ensured during its unloading at the site, its lifting, transportation or assembly at the site.

Lifting devices§

101.
(a)The construction contractor is responsible for ensuring that the lifting devices used for lifting, moving or assembling a prefabricated component are such that their position, strength and form prevent the fall of the load or their failure.
(b)A prefabricated component shall not be lifted except after its lifting devices have been inspected and no visible defect has been found in them.
(c)If a defect as stated in sub-regulation (b) is discovered, the component shall be marked in a conspicuous manner and shall not be handled except in accordance with the instructions of a licensed engineer.

Unloading and Storage§

102.
(a)The unloading of prefabricated components at the site and their storage shall be carried out in a place and in a manner that secures them against falling or overturning.
(b)The lashing of prefabricated components to the carrying vehicle shall not be released until their integrity has been inspected and their stability following release of the lashing has been ensured.

Assembly of Prefabricated Components§

103.
(a)The assembly of prefabricated components shall be carried out in such a manner that at every stage of assembly the stability of the individual component and of the structure as a whole is ensured.
(b)A vertical prefabricated component shall be supported by props in sufficient number, of adequate strength and in good condition, with their ends properly anchored.
(c)A component shall not be released from its suspension on a crane hook unless it has been supported as referred to in sub-regulations (a) and (b).
(d)The props shall not be removed until all the permanent connections of the prefabricated component to the permanent structure have been completed and its independent stability has been ensured.

Lifting of a Prefabricated Component in Dangerous Weather Conditions§

104.

A prefabricated component shall not be lifted when a wind is blowing that is liable to endanger those handling it or those in its vicinity.

Devices for Fencing§

105.

A construction operator is responsible for ensuring that a prefabricated component that is to serve as a work platform during the erection of the structure contains anchors or other suitable devices that will enable the installation of means for preventing a person from falling, as required under regulations 9 and 11.

Chapter VIII: Erection of Metal Structures

Erection of a metal structure§

106.
(a)A construction contractor shall not erect a metal structure whose height exceeds six metres except in accordance with an engineering plan.
(b)A site manager shall supervise that the process of erecting a metal structure as stated in sub-regulation (a) conforms to the engineering plan, and if it does not conform – shall stop the erection of the metal structure and shall not resume it for as long as the process does not conform to the engineering plan.

Covering of Intermediate Levels§

107.
(a)Where intermediate levels exist in the design of the structure, they shall be covered upon their erection with permanent components or with a temporary floor (hereinafter – the floor).
(b)The floor shall be made of components of suitable strength, placed adjacent to one another and installed in a manner that prevents them from being displaced from their position.
(c)The floor shall cover the area of the intermediate level, but openings intended for the passage of materials, for the installation of piping or for the installation of equipment may be left in it; such openings shall be fenced or covered as required under regulation 79.
108.§

(Repealed — תשפ״ו)

109.§

(Repealed — תשפ״ו)

110.§

(Repealed — תשפ״ו)

Chapter IX: Excavations and Earthworks

Prevention of Collapse§

111.
(a)Excavation or fill work shall be carried out in a manner that prevents harm to a worker.
(b)A construction operator is responsible for ensuring that excavation work that is liable to reduce the stability of a structure, installation or part thereof, whether permanent or temporary, shall not be commenced or continued unless appropriate measures have been taken to prevent harm to a person, both before the commencement of the excavation and during its course.

Sides of Excavation or Fill§

112.
(a)The sides of an excavation or fill, other than excavation or fill following the natural slope of the ground where there is no risk of collapse, whose depth or height exceeds 1.20 metres, shall be secured against collapse by means of suitable shoring made of wood, metal or other material of adequate strength, by means of a system of struts or by means of piles.
(b)Vehicles, excavators, bulldozers, tractors or other similar engineering equipment shall not be brought close to the edge of an excavation to the point of undermining the stability of the sides of the excavation or the shoring, unless measures have been taken to prevent collapse.
(c)Material or earth, as the case may be, removed in the course of excavation shall be kept at a distance that ensures against collapse; the distance shall not be less than 50 centimetres from the wall of the excavation or from its edge.
(d)Shoring of an excavation whose depth exceeds 4 metres shall be carried out in accordance with a plan; the shoring plan referred to shall be kept at the site adjacent to the general register at all times during the execution of excavation work.
(e)If during the installation of shoring there is a risk to a worker due to a landslide, a protective cabin shall be lowered into the pit, excavation or trench, which shall afford the worker inside it the necessary degree of safety until the completion of the work.
(f)In place of shoring as referred to in sub-regulation (a), a suitable protective cabin may be used.

Excavation by Machine§

113.

The obligation to install shoring or the obligation to take other measures to prevent the collapse of the walls does not apply to excavation carried out by means of a machine that does not require a person to be present in the excavation.

Special Precautionary Measures§

114.
(a)Before commencing the execution of excavation or quarrying works, a construction operator shall inspect for the possible existence of electricity, water, sewage, telephone, gas lines and the like, and shall not commence excavation or quarrying as aforesaid unless special precautionary measures have been taken to prevent harm to workers or to installations.
(b)The work manager shall take special precautionary measures to prevent harm to a person present in an excavation or pit from an electric current, harmful fumes, gases or a water eruption.
(c)For the purpose of carrying out work during hours of darkness or in a dark place, adequate lighting shall be installed at the place of work and in the adjacent passageways.
(d)Red-light lanterns shall be placed adjacent to every excavation or pit into which there is a risk of falling.

Fencing of a pit, excavation or slope§

115.
(a)A pit, excavation, quarried wall or slope into or along the sides of which a person is liable to fall from a vertical height exceeding 2 metres shall be fenced as close as possible to the edge, with suitable handrails and a midrail of adequate strength to prevent such a fall.
(b)Handrails and a midrail installed as aforesaid shall be maintained in good condition for as long as the excavation, pit, slope or quarried wall exists, but they may be temporarily removed if there is an absolute necessity to do so in order to permit the passage of material, and only for the period of time required for that operation, while taking the measures necessary to prevent a person or materials from falling.
(c)In engineering construction, if it is not practicable in the circumstances of the case to install handrails and a midrail as required by sub-regulation (a), other appropriate measures shall be taken to prevent a person from falling into the excavation, pit, quarried wall or slope.

Safety in Work on Bored Pile Drilling§

116.

No person shall enter or be employed inside a bored pile hole.

Ascent and Descent§

117.
(a)Descent into and ascent from a pit or excavation whose depth exceeds 1.20 metres shall be by means of a way whose gradient does not exceed a ratio of 1 vertical to 1.5 horizontal; however, it is permitted to install suitable steps or a ladder.
(b)The distance between the location of a worker in a trench or excavation and the exit therefrom shall not exceed 20 metres.

Width of Trenches§

118.

A trench that is required to be shored under these Regulations shall be of sufficient width to permit the installation of suitable shoring and the proper and safe execution of the work for which the trench was excavated.

Trenches in Sandy Soil§

119.
(a)The sides of a trench in sandy soil (in this regulation – a sandy trench) shall be installed upright and close together, shall cover the area of the lateral faces of the sandy trench for its full depth, shall penetrate to a sufficient depth below its floor and shall project at least 15 centimetres above the surface of the adjacent ground.
(b)The sides on both faces of a sandy trench shall be supported by horizontal struts along its full length at appropriate depths and at appropriate intervals between them, as required.
(c)The struts shall be installed on both sides of the sandy trench facing one another and shall be strengthened by reinforcements at appropriate intervals from one another, as required.
(d)The reinforcements shall be secured against accidental displacement or movement from their position, and shall also be secured –
(1)if they are timber reinforcements – by cleats that shall be connected to the reinforcements and to the struts even if wedges are used to strengthen them;
(2)if they are threaded metal reinforcements – by a suitable arrangement to prevent them from falling.
(e)Nothing that is liable to endanger the stability of the reinforcements or cause their displacement shall be placed on or leaned against them.

Crossings over Trenches§

120.
(a)Safe crossings in sufficient number in accordance with the requirements of the work shall be installed over every trench whose width exceeds 60 centimetres.
(b)Crossings as referred to in sub-regulation (a) shall be installed in accordance with the requirements of Chapter II.

Loose or Projecting Material§

121.
(a)The quarrying of a wall shall be carried out in such a way that no projecting or loose material is created that is liable to endanger those engaged in quarrying the wall, those in its vicinity or those passing near it.
(b)Once projecting or loose material as aforesaid has been created, it shall be removed without delay and in a safe manner.

Inspection§

122.
(a)The site manager shall carry out a safety inspection of an excavation, fill, quarrying or shoring at each of the following:
(1)every day before the commencement of work;
(2)after a work stoppage of seven days and before its resumption;
(3)after a work stoppage due to rain or flooding and before its resumption.
(b)The site manager shall record the results of the inspection in the general register.

Work on a Slope§

123.

Where work is being carried out on or near a slope in the course of which or as a result of which rocks or other materials may slide down, appropriate working methods and tools shall be used and adequate measures shall be taken to prevent harm to persons or property from rocks, stones or materials as aforesaid.

Stability of a Quarried Wall§

124.

A construction operator is responsible for ensuring that the quarrying of a wall is planned and executed so that its stability is secured by means of a stable gradient or by taking other appropriate measures to achieve the same purpose.

Inspection of a quarried wall and removal of projecting or loose material§

125.

The site manager shall inspect, each day before the commencement of work, the stability of the quarried wall, and shall record the results of the inspection in accordance with regulation 122; if projecting or loose material is found in the inspection, it shall be removed in a safe manner.

Prohibition on a Person's Presence§

126.

No person shall be required to be present, to pass or to work in a place where that person is liable to be harmed by loose material or an unstable wall.

Chapter X: Demolition

Supervision by a Site Manager§

127.

A construction operator is responsible for ensuring that demolition work is carried out under the direct management of a site manager with at least one year's experience in the demolition of structures.

Execution of Demolition§

128.
(a)A construction operator is responsible for ensuring that all demolition work is carried out in accordance with a detailed work plan.
(b)A plan as referred to in sub-regulation (a) shall be present at the site at all times during the execution of the demolition work, adjacent to the general register.
(c)The provisions of sub-regulation (a) shall not apply to the demolition of a structure whose height does not exceed 4 metres.
129.§

(Repealed — תשפ״ו)

Safety Measures§

130.
(a)All parts of the structure to be demolished shall be secured against uncontrolled or accidental collapse, and it shall also be ensured that the demolition operation is carried out in such a manner that it does not endanger those engaged in the demolition, adjacent structures or any part of the structure not intended for demolition.
(b)All parts of the structure to be demolished shall be disconnected from the electrical supply system, gas supply, water and steam, and appropriate measures shall be taken to prevent harm to the sewage system in the vicinity of the demolition site.
(c)Where only part of a structure is to be demolished, it is permitted to disconnect that part alone from the source of electrical supply, gas supply, water, steam and sewage.
(d)Special safety measures shall be taken to prevent harm to workers engaged in demolition from explosion, gases, dust or fire.
(e)In the demolition of a structure made of steel or reinforced concrete, adequate precautions shall be taken to prevent uncontrolled, sudden collapse, contraction or any other unexpected change.

Warning§

131.
(a)The place where a demolition operation is carried out shall be fenced with a suitable fence and visible warning signs shall be displayed therein, in addition to a sign as stated in regulation 7; the safe access routes to the place of demolition shall be clearly marked.
(b)If the installation of a fence as stated in sub-regulation (a) is not possible in the circumstances of the case, other appropriate measures shall be taken to prevent persons from accessing the danger zone.
(c)This regulation shall also apply during a break in demolition work.

Stoppage of work§

132.
(a)If a break occurs in demolition work, appropriate measures shall be taken to prevent the collapse of the remaining part of the structure.
(b)(Repealed)

Chapter XI: Hot Bitumen

Suitability of Workers§

133.

A construction operator is responsible for ensuring that work involving the use of hot bitumen is carried out under the direct supervision of an experienced worker and that all bitumen is heated by an experienced worker.

Place of Use§

134.

Bitumen shall not be heated except at a distance of at least 6 metres from a place where flammable materials are present; if the conditions of the site do not permit the maintenance of such a distance, a partition of non-flammable material shall be installed to separate the flammable materials from the fire, with the distance between the fire and the flammable materials being not less than 2 metres.

Heating Container§

135.
(a)A construction operator is responsible for ensuring that the container for heating bitumen is in proper condition and that its construction and strength are suited to the purpose for which it is intended.
(b)The container for heating bitumen shall be placed on a firm and stable horizontal metal base and shall not be filled to its upper rim; a sufficient clearance shall be left to prevent the overflow of bitumen, which shall be not less than 15 centimetres from the upper rim of the container.

Prevention of Spread of Fire§

136.

Adequate measures shall be taken to prevent the spread of fire during the heating of bitumen, as a result of accidental ignition or the effect of wind.

Extinguishing Means§

137.
(a)In the vicinity of the place of heating of bitumen there shall be kept a sufficient quantity of sand, shovels, beaters or suitable fire extinguishers.
(b)Water shall not be used to extinguish a bitumen fire.

Containers§

138.
(a)The containers for the transfer of bitumen shall be of good quality, in proper condition and suitable for their purpose.
(b)The containers shall be filled to no more than three-quarters of their capacity.