Israeli Legislation.com
RegulationsHealthLabor Law

Work Safety (Construction Works) Regulations, 5748-1988

תקנות הבטיחות בעבודה (עבודות בניה), תשמ"ח-1988

Published: 1988-02-04Consolidated Hebrew text as of 2026-10-16 · Last amended 2020-05-21
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

Chapter XII: Roof Works

Measures to Prevent Falling§

139.

Where there is a danger of a person falling from a roof owing to its slope, the nature of the surface or weather conditions, no person shall be employed thereon unless adequate measures have been taken to prevent that person from falling from the roof.

Savings Provisions in respect of a Fragile, Slippery or Steep Roof§

140.

The provisions of this Chapter do not derogate from that stated in the Work Safety (Work on Fragile or Steep Roofs) Regulations, 5746-1986.

Chapter XIII: Machinery

Dangerous Part of a Machine§

141.

A construction operator is responsible for ensuring that every dangerous part of a prime mover, every transmission and every other dangerous part of a machine are securely fenced, unless they have been constructed or are in a condition that affords the same degree of safety to every person employed or present at the place as if they had been securely fenced.

Automatic Safety Devices§

142.

Where a dangerous part of a machine is such that, by reason of the nature of the operation thereon, its safety cannot be achieved by means of a fixed guard, the requirements of regulation 141 shall be deemed to have been complied with in respect of that part if a device has been installed on the machine that automatically prevents the operator from coming into contact with that part.

Safety inspection§

142a.

A site manager shall carry out, at least once a day, an inspection and shall verify that dangerous parts of machinery are fenced, protected by an automatic safety device or built or placed in a condition as if they had been securely fenced, as required under regulations 141 and 142, and shall record the results of the inspection carried out in the general register.

143.§

(Repealed — תשפ״ו)

Chapter XIV: Hoisting Tower

144.§

(Repealed — תשפ״ו)

145.§

(Repealed — תשפ״ו)

146.§

(Repealed — תשפ״ו)

147.§

(Repealed — תשפ״ו)

148.§

(Repealed — תשפ״ו)

149.§

(Repealed — תשפ״ו)

150.§

(Repealed — תשפ״ו)

151.§

(Repealed — תשפ״ו)

152.§

(Repealed — תשפ״ו)

153.§

(Repealed — תשפ״ו)

154.§

(Repealed — תשפ״ו)

155.§

(Repealed — תשפ״ו)

156.§

(Repealed — תשפ״ו)

157.§

(Repealed — תשפ״ו)

158.§

(Repealed — תשפ״ו)

159.§

(Repealed — תשפ״ו)

160.§

(Repealed — תשפ״ו)

161.§

(Repealed — תשפ״ו)

162.§

(Repealed — תשפ״ו)

Chapter XV: Electricity

Construction and Maintenance§

163.
(a)A construction operator is responsible for ensuring that all electrical equipment, fixtures and installations present or installed at the site conform to the requirements of the Electricity Law, 5714-1954, and the regulations made thereunder, the Work Safety (Electricity) Regulations, 5746-1986, and the Israeli Standards relating to electricity within the meaning of the Standards Law, 5713-1953.
(b)All the equipment and installations specified in sub-regulation (a) shall be maintained in proper working order throughout the entire duration of work at the site.

Work in the Vicinity of Electric Lines§

164.
(a)No work shall be carried out at a site at a distance of less than 3.25 metres from the wires of electric lines at a voltage of up to 33,000 volts, or at a distance of less than 5 metres from the wires of electric lines at a voltage exceeding 33,000 volts, except under the conditions referred to in sub-regulation (b).
(b)Notwithstanding the provisions of sub-regulation (a), if work is carried out at distances smaller than those referred to therein, the following steps shall be taken:
(1)the work shall not be carried out unless the lines are disconnected from the voltage supply source;
(2)if the requirement under paragraph (1) is not practicable in the circumstances of the matter, special measures shall be taken, such as the installation of partitions or fences to prevent direct or indirect contact of a person with the wires of electric lines that are under voltage; at the time of installation or dismantling of partitions or fences as aforesaid, the electric lines shall be disconnected from the voltage supply source.
(c)Work or movement in the vicinity of electric lines shall be carried out in such a manner as to prevent any contact with the electric wires or poles, including their equipment, foundations or anchors, or undue approach thereto.
(d)The surface of the ground shall not be altered in the vicinity of electricity poles, their foundations, their anchors, or beneath electric wires unless such alteration has been approved in writing by the Israel Electric Corporation Ltd.; such approval shall be kept at the site adjacent to the general register.

Electric Cables§

165.
(a)Electric cables or wires laid on the surface of the ground shall be protected by adequate protective means in places where vehicles or engineering mechanical equipment are likely to pass over them or in places where there is a risk of damage to them, and they shall not constitute an obstacle.
(b)No electric cable or wire shall be laid in a puddle of water or other liquids.

Chapter XVI: Miscellaneous Safety Provisions

Safety organisation plan for a construction site§

166.

At a construction site where the construction executer employs, by himself or through a principal contractor or subcontractors, up to 49 workers simultaneously, the construction executer shall prepare a safety organisation plan for the site in accordance with the Third Schedule; a copy of the plan shall be attached to the general register and shall be kept at the construction site; the provision of this regulation shall not apply at a construction site where the works thereon are as referred to in regulation 2(g).

Lime pit§

167.
(a)A pit containing lime shall be covered with a suitable cover or handrails, a midrail and toeboards shall be installed around it to prevent a person from falling into the pit; the handrail, midrail and toeboards shall be in accordance with regulation 11, and their height shall be measured from the edge of the pit.
(b)Instead of the guardrail, midrail and toeboards, it is permissible to install a cover as referred to in regulation 79(2).
(c)The protective measures referred to in sub-regulations (a) and (b) shall be installed in such a manner that it is possible to remove part of them temporarily, for the purpose of introducing or removing lime, and only for the period of time required for carrying out the said operations.
168.§

(Repealed — תשפ״ו)

Prohibition on the Presence of a Person beneath a Raised Load§

169.

No person shall be present beneath a raised load unless the circumstances of the case so require, and even then only for the shortest period of time necessary for the execution of that work and while taking adequate safety measures.

Securing of a Load§

170.

No load shall be raised unless it has been secured against its falling or the falling of any part of it.

Vertical Lifting of a Load and Prevention of Its Swinging§

171.

The lifting of a load by a crane or other lifting means shall be carried out vertically only, and the necessary measures shall be taken to prevent its swinging by means of guide ropes or other adequate means.

Lifting of a Load by means of a Pulley§

172.
(a)The lifting device, including the pulley, the jib, the anchoring devices and the lifting rope or cable, shall be of good quality, made of suitable material and in good condition.
(b)The jib shall be properly anchored to the structure or to an appropriate counterweight in such a manner as to prevent the release or collapse of the lifting device.
(c)The pulley shall be attached to the jib in a secure manner to prevent its release, and twisted metal wires shall not be used for that purpose.
(d)The lifting device shall be inspected by the site manager upon its installation and before the commencement of its use; the results of the inspection shall be recorded in the general register.

Specification of a Powered Lifting Device§

173.
(a)A construction operator is responsible for ensuring that at a site where a powered lifting device is present or operated, a specification from the manufacturer or pursuant to a design is available, which shall include particulars of the anchoring of the device to the structure or its safe placement.
(b)The specification referred to in sub-regulation (a) shall be attached to the general register.

Placement of a Powered Lifting Device§

174.
(a)A powered lifting device shall be placed or anchored in accordance with the specification or plan prepared pursuant to regulation 173.
(b)The anchoring, placement or support means shall be maintained in proper working order for as long as the device is placed at the location of its use.
(c)The device shall be placed in such a manner that the load does not become caught in the structure or any other body during its lifting.

Overloading of Work Platforms§

175.

A work platform shall not be loaded beyond the live load for which it was designed, unless it has been strengthened or supported by additional supports in a manner that enables it to bear the additional load.

Lift for the Transportation of Workers§

176.

A construction operator is responsible for ensuring that in a structure whose height exceeds 25 metres a service lift for the transportation of workers shall be installed.

Throwing of Materials and Tools§

177.
(a)Materials or work tools shall not be thrown from a height exceeding 2 metres but shall be lowered carefully.
(b)Sub-regulation (a) shall not apply where the throwing is done within a closed chute or conduit and the place of discharge is fenced off to prevent access by any person.

Prevention of Falling Objects§

178.

For the execution of work at a height exceeding 2 metres, measures shall be taken to prevent objects or tools from falling and causing harm to workers, by the use of special receptacles, belts for carrying work tools, or by other means.

Installation of a Partition§

179.

The presence of a person below or above a place where another person is working shall be prevented, unless a partition has been installed between the two places to prevent harm from a falling body.

Equipment and Work Tools§

180.
(a)The equipment and work tools used for the execution of the work or present at the site shall be in good and proper condition, free of defects or faults liable to cause risk to the user thereof or to persons in the vicinity, and equipment and work tools shall not be used except for the purpose for which they are intended.
(b)A construction operator shall provide equipment and tools of good quality for the execution of the work, in good and proper condition, free of defects or faults.

Storage of Materials§

181.

Materials, tools, equipment, formwork for industrialised construction, prefabricated construction components and the like shall be stored in a stable and orderly manner so as to prevent the possibility of their collapse.

Wall Stability§

182.

A wall liable to collapse or fall, in whole or in part, shall be adequately supported to ensure its stability.

Prevention of Fire§

183.
(a)Adequate measures shall be taken to prevent the ignition of flammable and other materials.
(b)Where flammable materials, other materials liable to ignite, or works requiring the lighting of a fire or the maintenance of a combustion process are present or carried out at the site, adequate measures shall be taken to prevent the spread of combustion as a result of accidental ignition or the effect of wind, and adequate and sufficient means of extinguishing it shall be available at the site.

Chapter XVII: Hygiene

Shelter from Weather§

184.
(a)A construction operator is responsible for ensuring that a suitable place of shelter from rain is installed at the site for workers, unless the structure being erected can itself serve that purpose.
(b)A construction operator is responsible for ensuring that protection from sunlight is installed for workers, insofar as this is practicable in the circumstances of the matter.

Lighting§

185.
(a)In a place where a person is present or passes through and there is insufficient natural lighting, the construction operator shall install appropriate artificial lighting with sufficient light intensity.
(b)Once artificial lighting has been installed as referred to in sub-regulation (a), it shall be maintained in proper working condition for as long as work at the place continues.

First Aid§

186.
(a)A construction operator is responsible for ensuring that at every site a first aid kit is installed, maintained and properly equipped.
(b)The kit shall be positioned so that access to it is convenient, and nothing shall be kept in it other than materials and instruments for first aid.

Person in Charge of First Aid Kit§

187.
(a)A construction operator shall appoint a person in charge of the first aid kit (hereinafter – the person in charge), who shall be present at the site during all working hours; at a site where more than 50 persons work, the person in charge shall be trained in the administration of first aid.
(b)A notice of the name of the person in charge shall be displayed in a prominent place at the site.
(c)The name of the person in charge shall be recorded in the general register.

Rest and Eating Area§

188.
(a)A construction operator is responsible for ensuring that at the site a suitable place is made available to workers for eating their meals, which is protected from rain, wind and sunlight, and which contains tables and seating places in sufficient number.
(b)A place as referred to in sub-regulation (a) shall be maintained in proper and clean condition, and no materials or objects other than those related to its purpose shall be stored therein; a closed container for the collection and removal of food scraps and refuse shall be available at the place.

Drinking Water§

189.

The construction operator shall install and maintain, at points conveniently accessible to all workers, a facility for the supply of potable water in sufficient quantity, from a public water network or from another source approved in writing by a physician of the district health office within whose area of responsibility the site is situated.

Drinking Water in Vessels§

190.

Drinking water that is not supplied directly from a public water network shall be kept in adequate vessels, shall be replaced at least once a day, and all measures shall be taken to protect the water and the vessels from contamination.

Warning against Non-Potable Water§

191.

Where water that is not potable is also present at the site, those water sources shall be marked with appropriate, clear and prominent signage.

Clothing and Footwear§

192.

No person shall be employed or work at a building unless that person is wearing a shirt or suitable garment to protect the skin of the body and is wearing high boots with an upper of leather or other suitable material and a sole of leather, rubber or other rigid material, to prevent the penetration of nails or sharp objects.

Changing Room§

193.

Upon a written demand by a labour inspector, an adequate changing room shall be installed and maintained for the use of workers for garments not worn during working hours, together with reasonable practical arrangements for the drying of work clothes.

Chapter XVIII: Application and Transitional Provisions

Plans and Specifications in Hebrew§

194.

Plans and specifications under these Regulations shall be in Hebrew.

Application§

195.

The provisions of these Regulations shall apply to all construction works and engineering construction works.

Repeal§

196.

The Work Safety (Construction Works) Regulations, 5715-1955, and the Work Safety (Excavation of Trenches in Sandy Soil) Regulations, 5722-1961 – are repealed.

197.§

(Repealed — תשנ״א)

Commencement§

198.

These Regulations shall come into force 60 days from the date of their publication.

First Schedule (regulation 5a(a)(4))

Second Schedule (regulation 6a)

Part 1

Part 2

Part 3

Third Schedule (regulation 166)

A construction site safety organisation plan shall include the following particulars:

1.§

Chapter I:

Description of the construction site, in which the following matters shall be detailed:

(a)the designation of the construction site;
(b)a description of the main characteristics of the activity;
(c)the scope of persons employed and their occupations;
(d)the location and geographical spread of the workplace installations and the main activities carried out therein.
2.§

Chapter II:

Details of the occupational safety and health policy of the construction site, including with respect to objectives, indicators, priorities, standards and guidelines, as well as details of the resources to be allocated for the implementation of the plan according to its chapters and according to the risks; the safety policy shall also include the definition of the acceptable risk level at the construction site.

3.§

Chapter III:

Description of the occupational safety and health system, in which the following matters shall be detailed:

(a)the organisational structure of the safety system at the construction site;
(b)the names of the office holders in the fields of safety, as required under the Labour Inspection Organisation Law and the Work Safety Ordinance, including the safety officer, works manager, site manager, safety controller, professional builder for tube-and-fitting scaffolding, scaffolding erection planner, authorised inspector;
(c)the system for handling and responding to safety incidents and emergency situations at the construction site, including the person responsible for the first aid kit and the list of persons responsible for providing first aid.
4.§

Chapter IV:

Risk management at the workplace, in which the following matters shall be detailed:

(a)a professional risk analysis that shall include the following stages:
(1)identification of risk factors;
(2)risk assessment;
(3)analysis of methods and means for risk control;
(4)decision-making and selection of the method for risk control;
(5)implementation of the methods and means selected for risk control;
(b)for each risk detailed in sub-paragraph (a), the following shall be detailed:
(1)the office holder at the construction site authorised to approve the acceptable risk level, and his particulars;
(2)the office holder at the construction site responsible for implementing the risk control measures, and his particulars;
(3)timetables and a completion date for the implementation of the risk control measures;
(4)the manner of monitoring the reduction of the risk;
(c)procedures for each of the following:
(1)identification of safety hazards at the construction site and an annual plan for the elimination or prevention of such hazards;
(2)approval and control of the introduction of new risk factors into the construction site and their incorporation into the process detailed in paragraph (a);
(3)accident notification procedure;
(d)an annual plan for each of the following:
(1)conducting risk surveys specific to the construction site as a consequence of its characteristics;
(2)conducting internal organisational audits and inspections to supervise compliance with safety instructions;
(3)carrying out corrective and preventive actions, including updating procedures and safety instructions, and drawing lessons from the risk management process or as a result of the occurrence of work accidents, occupational diseases, or safety incidents.
5.§

Chapter V:

Occupational safety and health training, in which the following matters shall be detailed:

(a)a procedure for conducting occupational safety and health training for each of the following:
(1)new employees;
(2)persons employed at the construction site with whom the construction executer does not have an employment relationship, including contractor employees;
(b)annual programmes for employee training, including for the persons detailed in paragraph (a), on the following subjects:
(1)the transfer of information and training concerning the risks to which employees may be exposed in their work, pursuant to regulations 2 and 3 of the Labour Inspection Organisation (Disclosure of Information and Training of Employees) Regulations, 5759-1999;
(2)maintaining the competence of office holders at the construction site;
(3)exercising office holders and employees in dealing with emergency situations typical of the risks at a construction site;
(4)raising awareness of safety and occupational hygiene at the workplace, including information and publicity activities.
6.§

Chapter VI:

Periodic inspections of equipment and materials, in which the following matters shall be detailed:

(a)a list of items subject to periodic safety inspections, including instruments, machines, installations and infrastructure; alongside each item, the required inspections, their dates and methods of monitoring the performance of such inspections shall be detailed;
(b)an annual plan for inspecting the existence, fitness and proper functioning of the safety and emergency means at the construction site.
7.§

Chapter VII:

The granting and renewal of permits, approvals, licences, authorisations, appointments and the maintenance of competences relating to the safety of workers, in which the following matters shall be detailed:

(a)an annual plan for the determination and renewal of the permits or approvals required for the workplace under any law;
(b)a list of the office holders at the construction site in respect of whom the determination of a licence, authorisation or appointment, or the maintenance or renewal of competence, is required under any law; alongside each office holder's name, the renewal date or the date of fulfilment of the conditions for maintaining competence and the methods of monitoring these actions shall be detailed;
(c)a list of workers at the construction site whom the construction executer has decided, on safety grounds, require an authorisation, appointment or competence, their maintenance or renewal; alongside each worker's name, the renewal date or the date of fulfilment of the conditions for maintaining competence and the methods of monitoring these actions shall be detailed.
8.§

Chapter VIII:

A list of the occupational safety and health instructions and procedures decided upon by the construction executer, including emergency preparedness and response procedures, with an indication of the date of their last update.