Planning and Building Regulations (Establishment of an Inspection Institute and Its Methods of Work), 5778-2018

תקנות התכנון והבנייה (הקמת מכון בקרה ודרכי עבודתו), תשע"ח-2018

Published: 2018-06-04Consolidated Hebrew text as of 2026-02-15 · Last amended 2024-06-26
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

First Schedule (Definition of "design annexes" in regulation 1, and regulations 2 and 39)

1.§

(Repealed)

Ventilation annex§

2.

A document containing a general explanation and engineering calculation for the ventilation of the building, which may be incorporated in the main plan, including all of the following:

(1)a calculation to ensure the required number of air changes for ventilation for health purposes and smoke evacuation;
(2)details of the planned ventilation opening areas relative to the floor area and the location of the planned ventilation openings;
(3)if mechanical ventilation is proposed – a calculation of the number of air changes per hour, and marking of air intake and exhaust points;
(4)(deleted)
(5)marking of smoke extraction from car parks, smoke extraction from machine rooms, smoke extraction from building entrance lobbies, smoke extraction from warehouses, pressurisation of stairwells against the background of a 1:100 plan;
(6)details of the design criteria, compliance with design requirements, and an explanation of the building's ventilation method.

Fire safety annex§

3.

An annex prepared in accordance with Commissioner's Directive 532.

Thermal insulation annex§

4.

A document describing the energy behaviour of the building including characterisation of the thermal insulation, including all of the following:

(1)environmental data;
(2)calculated thermal resistance of the various envelope components pursuant to SI 1045;
(3)calculation of thermal losses through the building envelope or seasonal energy consumption in comparison to a reference unit.

Soil and foundation report§

5.

Geotechnical documents including all of the following:

(1)a general document in which all of the following shall be detailed:
(a)identification of the site and a general description of the scope of work to which the report relates;
(b)a general review of soil conditions and soil classification at the site;
(c)a description of the tests on the basis of which the report was written;
(d)analysis of the findings of a site survey pursuant to SI 940;
(e)provision of geotechnical design guidelines and data;
(f)an opinion regarding seismic risks at the site, including a specific site survey pursuant to SI 413, if required;
(g)an opinion regarding groundwater;
(h)infiltration coefficients for the soil layers, if stormwater percolation is required;
(2)an excavation, fill and shoring document in which all of the following shall be detailed:
(a)guidelines for slopes of excavation walls and fill embankments;
(b)guidelines for types of fill materials and their compaction;
(c)guidelines for retaining walls and temporary and permanent shoring components;
(d)the effect of excavation, fill and shoring on an adjacent plot;
(e)the effect of excavation, fill and shoring on an adjacent structure;
(f)the effect of an adjacent building on the excavation or fill at the site;
(g)examination of the need for displacement monitoring;
(3)a foundation document in which all of the following shall be detailed:
(a)a recommendation on suitable foundation methods;
(b)guidelines for the design and execution of the foundation, including:
(1)minimum dimensions of foundation components;
(2)a table of permissible loads on footings and piles including the following details: footing size, pile diameter, depth, permissible load in compression, permissible load in tension, permissible horizontal load;
(3)permissible height difference between adjacent foundation components;
(4)guidelines for calculating the shear and moment capacity in piles;
(5)permissible and anticipated settlements, permissible and anticipated horizontal displacements;
(6)minimum required spacing between adjacent piles to reduce the capacity of adjacent piles;
(7)foundation design for earthquakes;
(c)criteria for the design of foundations including: permissible contact stress at base and friction, modulus of subgrade reaction, horizontal friction coefficient;
(d)details of the capacities of foundation components for vertical and horizontal forces, or assumptions for calculations;
(e)assessment of displacements;
(4)a site development document in which:
(a)guidelines for drainage of the sub-soil around the building;
(b)guidelines for the design of pavements and fences.

Stability annex§

6.

A stability annex for the structure and the development components in which all of the following shall be detailed:

(1)a document containing the following data:
(a)description of the structure and environment: location, configuration including dimensions, floor area, number of storeys, unique design requirements and execution requirements for the structure, existing and planned, special environmental conditions such as a marine environment;
(b)definition of the design method, explanation of the scope of the calculation, definition of the design model – basic assumptions for the structure and the types of components regarding the degree of continuity, stiffening by means of built walls; description of the final element, indication of modal analysis if required pursuant to a standard, indication of the computer programmes used;
(c)characterisation of the materials to be used for the execution of the frame and their compliance with standards;
(d)details of loads and load combinations pursuant to the coefficients prescribed in SI 412, SI 413, SI 414 and SI 466;
(e)details of the wind load calculation in a building whose height exceeds 42 metres, a chimney, a mast, lightweight construction including a canopy and a shade structure;
(f)details of seismic design coefficients and horizontal forces in an earthquake and details of the horizontal forces and other loads taken into account;
(2)a static scheme at a level of detail of 1:100 including all of the following:
(a)general geometry including position, sections and elevations where applicable;
(b)description of the static scheme: indication of the types of connections in the main components, assumptions regarding boundary conditions, and indication of the system bearing the static loads and the stiffening system for variable loads;
(3)a document containing details of the seismic design of the building, including –
(a)limiting horizontal displacement and period for each mode shape, if modal analysis was performed;
(b)horizontal design displacements in the X direction and Y direction per storey;
(c)storey strength coefficient, identification of a weak or flexible storey;
(d)configuration of principal modes, if modal analysis was performed;
(4)a document containing details of the force envelope, in all storeys of the structure, for the ultimate limit state of collapse:
(a)total vertical axial force;
(b)total storey shear in the X direction and Y direction;
(c)storey shear capacity in the X direction and Y direction;
(d)the natural frequency of the structure, in dynamically loaded structures, and the frequency of the variable load;
(5)a document containing the results of the static design of the following components:
(a)forces and capacity of columns and walls at ground floor or basement level at the ultimate limit state of collapse;
(b)design of main structural components including calculation and quantities of required reinforcement, including: slabs, columns, foundations, transfer slab, prestressed component, retaining wall.

Protection annex§

7.

A protected space plan as required under the Civil Defence Law, 5711-1951, for a new building or a building that includes a new shelter, including –

(1)a plan of the shelter or protected space at a scale of 1:50 including sections through windows and doors, in which shall be detailed the location and dimensions of the openings including the distance of the openings from a perpendicular wall and the height of the window above floor level, the location of air pipes and their distance from the openings and the ceiling, the thickness of the protective walls, the height of the protected space and a verbal definition of all the proposed protection components;
(2)calculation of the required protection areas and the planned protection areas;
(3)calculation of the required filtration and ventilation system capacity including a calculation of the required volume of filtered air for the purpose of determining the size of the filtration system;
(4)marking of the protective wall;
(5)calculation of wall descent;
(6)an electrical and communications plan of the shelter or protected space;
(7)the location and dimensions of the ventilation and filtration system on the plan and indication of its characteristics.
(8)plans at a scale of 1:100 of all the storeys in the building, typical sections of the building at a scale of 1:100 and elevations of the building, in which shall be clearly detailed the location of all protection solutions and descending walls;
(9)structural plans and sections at a scale of 1:50 of each enclosed protected space including the layout of vertical and horizontal reinforcement in the ceilings and walls of the protected space;
(10)structural plans at a scale of 1:25 of all connection details between the walls and ceilings of the protected space including the layout of reinforcement in corner connection details, in the areas of doors, windows and escape openings;
(11)structural plans at a scale of 1:25 of special structural details.

Drainage annex§

8.

A document describing the solution for the treatment of surface runoff water on the plot by means of removal, retention or percolation, including all of the following:

(1)calculation of permeable cover areas within the plot area;
(2)indication of hydrological variables for determining the design rainfall intensity;
(3)design of soakage pits or percolation boreholes or a reverse well and an explanation of the suitability of the proposed solution to the foundation guidelines and the soil report;
(4)calculation of percolation capacity;
(5)solutions for gutter water and air conditioning condensation, separation of contaminated runoff water and pre-treatment of wash-off at a medium level;
(6)a calculation showing the portion of surface runoff to be absorbed within the plot boundaries;
(7)calculation of the retention volume.

Environmental annex§

9.

A document describing a response to environmental issues, including building–environment interactions, and containing design variables and design results, an explanation of the design and calculation method, and a description of the proposed design in a diagram.

Health technical specification§

10.

A document describing a response to sanitation issues, and containing design variables, the design results in comparison to standard criteria, an explanation of the design method, the calculation and a description of the proposed design in a diagram.

Sanitary (Plumbing) Annex§

11.

The sanitary annex shall detail all of the following:

(1)A document on the background of a main plan and a development plan at a scale of 1:100, and if necessary shall include accompanying documents, in which all of the following shall be detailed:
(a)The sewerage system –
(1)details of the sewerage pipe network in the yard, including longitudinal sections with pipe diameters, levels of the pipework and covers, including the location of the connection to the municipal sewerage line;
(2)location and diameter of collectors and drains of the building sewer;
(3)description and details of the disposal of wastewater and run-off water from building basements that will be connected to the building sewers by pumping, including the location of pump chambers and connection details;
(4)description and details of private disposal systems or pre-treatment of wastewater;
(5)a table of sanitary fixture units required, except in structures intended solely for residential use;
(b)The drainage system –
(1)details of the drainage system on the plot, including the location of connection to a municipal drainage line in the case of connection to underground municipal drainage;
(2)location and diameter of rainwater pipes, including the outlet from the building or the connection to a drainage and infiltration system in the yard;
(c)The water systems –
(1)location and size of shafts for collectors and water lines of all types;
(2)location and area of the collectors of solar systems, location of the boilers and the route of the main lines;
(3)general details of the system for water heating, steam and central heating, including the location of the fuel tank, location and area of the boiler room, location of the chimney and the main lines;
(4)definition of the areas in which sprinkler systems shall be installed;
(2)the character of the water network;
(3)a schematic of the main water network for supply and fire-fighting, including: details of the water system head, location and diameter, the main lines outside and inside the connection to the building, connections to storage tanks and to pumping systems, means of preventing backflow;
(4)dimensions, volume, inlet openings and ventilation of water storage tanks – including detailed calculations of volumes for use in fire-fighting;
(5)description and details of pumping and circulation systems, for pressure boosting or for storage purposes, including the location and size of the rooms;
(6)a general outline of the gas system, details of the ventilation of the gas shaft, location and volume of the reservoir and its protection, the route and location of the main lines.

Gas Annex§

s1i11a.

Shall be marked on the main plan or on the background of a main plan and a development plan at a scale of 1:100, and if necessary shall include accompanying documents, in which all of the following shall be detailed: a general outline of the gas system, details of the ventilation of the gas shaft, location and volume of the reservoir and its protection, the route and location of the main lines.

Required Design Annexes§

12.

All the annexes detailed below shall be submitted to the inspection institute, and the engineer may, at the time of delivering the permit information, exempt a person from submitting an annex if the engineer considers that the characteristics of the requested work justify such an exemption and if submission of the annex is not required under legislation or a plan; however, the engineer shall not exempt a person from submitting an annex that must be submitted for examination by an authorised inspector for the purposes of specific legislation except after consulting the relevant approving body:

Required Design Annexes
AnnexesGround-floor residentialOther new constructionNotes
Ventilation annex——As required in the permit information, in legislation, or a plan
Fire safety annex—VExcept in respect of permits as detailed in regulation 18(a) of the Building Licensing Regulations, in which no annex shall be submitted but the fire detection and fire-fighting measures shall be marked on the main plan
Thermal insulation annex——As required in the permit information, in legislation or a plan
Soil and foundation reportVV—
Acoustic opinion——As required in the permit information, in legislation or a plan
Stability annexVV—
Protection annexVV—
Drainage annex——As required in the permit information, in legislation or a plan and according to the type and designation of the land
Environmental annex——As required in the permit information, in legislation or a plan
Health technical narrative——As required in the permit information, in legislation or a plan
Sanitary annexVVIn a ground-floor building – sewerage section only
Soil rehabilitation plan——As required in the permit information, in legislation or a plan

Annexes for an Application to Add a Residential Protected Space to an Existing Building§

s1i12a.

Notwithstanding the provisions of section 12, in an application for a permit to add a residential protected space as defined in the Building Licensing Regulations, only the following annexes shall be submitted to the inspection institute:

(1)soil and foundation report;
(2)stability annex;
(3)protection annex.

Second Schedule (Regulations 4 and 31)

Third Schedule (Regulations 28 and 30)

Employers' Liability Insurance§

1.
(a)The inspection institute shall insure its statutory liability towards its employees under employers' liability insurance throughout the territory of the State of Israel and the administered territories.
(b)The limit of liability shall not be less than NIS 20,000,000 per employee, per event and per insurance period (year).
(c)The insurance shall be extended to cover the insured's liability towards contractors, sub-contractors and their employees, if they are deemed to be their employer.
(d)The insurance under the policy shall be extended to indemnify the State of Israel – the Planning Administration, and additional government ministries, if, in connection with the occurrence of a work accident or any occupational disease, it is claimed that they bear employers' liability towards any of the employees of the inspection institute, contractors, sub-contractors and their employees who are in its service.

Third-Party Liability Insurance§

2.
(a)The inspection institute shall insure its statutory liability under the laws of the State of Israel under third-party liability insurance, for bodily injury and property damage, throughout the territory of the State of Israel and the administered territories.
(b)The limit of liability shall not be less than NIS 1,000,000 per event and per insurance period (year).
(c)The policy shall include a cross-liability clause.
(d)Inspectors who are not covered under the employers' liability insurance of the inspection institute shall be regarded as a third party.
(e)The insurance shall be extended to cover the insured's liability towards a third party by reason of the activity of contractors, sub-contractors and their employees.
(f)The insurance under the policy shall be extended to indemnify the State of Israel – the Planning Administration, and additional government ministries, if they are considered liable for the acts or omissions of the inspection institute and all those acting on its behalf.

Professional Liability Insurance§

3.
(a)The inspection institute shall insure its professional liability under professional liability insurance.
(b)The policy shall cover any damage arising from breach of a professional duty by the inspection institute or its employees and by all those acting on its behalf, that occurred as a result of an act, negligence, including omission, error or oversight, misrepresentation, or negligent statement made in good faith, arising in connection with the operation of an inspection institute, including the carrying out of design inspection and construction inspection under the Law.
(c)The limit of liability shall not be less than NIS 10,000,000 per event and NIS 20,000,000 per year.
(d)The coverage under the policy shall be extended to include the extensions detailed below:
(1)fraud and employee dishonesty;
(2)loss of documents, including loss of use or delay due to an insured event;
(3)cross liability, however the coverage shall not apply to claims by the inspection institute against the State;
(4)extension of the discovery period to at least 6 months.
(e)The insurance shall be extended to indemnify the State of Israel – the Planning Administration and additional government ministries if they are considered liable for the acts or omissions of the inspection institute and those acting on its behalf.

Conditions in the Policy§

4.

All insurance policies under items 1 to 3 shall include the following conditions:

(1)additional insureds shall be added to the name of the insured, namely the State of Israel – the Planning Administration, and additional government ministries, subject to the extension of indemnification as referred to in this Schedule;
(2)in any case of reduction or cancellation of the insurance by either of the parties, such reduction or cancellation shall have no effect unless advance notice of at least 60 days has been given to the person in charge;
(3)the insurer waives any right of subrogation, claim, contribution or recourse against the State of Israel – the Planning Administration, additional government ministries and their employees, provided that the waiver shall not apply in favour of a person who caused the damage with malicious intent;
(4)the inspection institute is solely responsible towards the insurer for the payment of premiums for all policies and for the fulfilment of all obligations imposed on the insured under the terms of the policies;
(5)the deductibles specified in each policy shall apply exclusively to the inspection institute;
(6)any clause in the insurance policies that in any way excludes or reduces the insurer's liability where other insurance exists shall not be invoked against the State of Israel, and in respect of the State the insurance shall be deemed primary insurance entitling it to the full rights under the insurance.