Planning and Building Regulations (Establishment of an Inspection Institute and Its Methods of Work), 5778-2018

תקנות התכנון והבנייה (הקמת מכון בקרה ודרכי עבודתו), תשע"ח-2018

Published: 2018-06-04Consolidated Hebrew text as of 2026-02-15 · Last amended 2024-06-26
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

Section D: Documentation at the Inspection Institute

Retention of Documents§
64.
(a)The following shall be retained at the inspection institute throughout the entire period of the institute's activity:
(1)applications for design inspection and construction inspection handled by the inspection institute, including notices of non-acceptance of an application for design inspection and construction inspection and correspondence with the applicant, the application preparer, the person responsible for coordination with the inspection institute and the person responsible for supervision of execution;
(2)the opinions of all inspectors and authorised inspectors, the opinions of the approving bodies, if required, including interim reports as referred to in regulations 42 and 44;
(3)a summarising opinion for design inspection and construction inspection as referred to in regulations 45 and 63;
(4)the main plan attached to the permit, with all its annexes;
(5)the as-built plans file of the building or work;
(6)the inspection logs, including the tests, documents and approvals detailed therein.
(b)Where an inspection institute ceases to operate, it shall transfer the information referred to in sub-regulation (a) to the relevant licensing authority.

Chapter VI: Transfer between Inspection Institutes

Section A: Termination of Engagement with an Inspection Institute and Engagement with Another Inspection Institute

Transfer between Inspection Institutes§
65.
(a)Where an engagement agreement has been made with an inspection institute as referred to in regulation 40 or 50, the applicant or the permit holder, as the case may be, may terminate the engagement with the inspection institute at any time and enter into an engagement and submit a new application for design inspection or construction inspection with another inspection institute.
(b)The applicant or the permit holder, as the case may be, shall notify the licensing authority of the termination of the engagement with an inspection institute and of the engagement with another inspection institute.

Section B: Application Submitted to Another Inspection Institute after Commencement of Works

Suspension of Works at the Site§
66.

Where an inspection institute ceases to carry out construction inspection after the commencement of works, work at the site shall be suspended until an application for construction inspection is accepted by another inspection institute as referred to in regulation 68.

Transfer of the Inspection Log§
67.

Where an inspection institute ceases to carry out construction inspection after the commencement of works and a new application for construction inspection has been submitted to another inspection institute under regulation 48, the permit holder shall notify the licensing authority and the inspection institute that has ceased carrying out inspection accordingly; upon the inspection institute that has ceased carrying out inspection receiving such notification, it shall transfer the inspection log as referred to in regulation 59 to the other inspection institute within five days.

Handling of an Application at a New Inspection Institute§
68.
(a)The inspection institute to which the new application as referred to in regulation 67 has been submitted shall examine whether it is possible to accept the application as referred to in regulation 51, and if it has accepted the application, it shall carry out construction inspection in respect of works to be performed from the date of acceptance of the application as referred to, as well as in respect of works performed before the acceptance of the application as referred to, provided that they remain exposed and defects can be identified therein at the time of acceptance of the application as referred to.
(b)Without derogating from the provisions of sub-regulation (a), the inspection institute to which the application for construction inspection has been submitted after the commencement of works shall include within the framework of the summarising opinion as referred to in regulation 63, also an opinion regarding the findings included in the inspection log transferred to it as referred to in regulation 67.

Chapter VII: Payment to the Inspection Institute

Payment to an Inspection Institute§

69.

The inspection institute shall collect a fee for design inspection or construction inspection, as the case may be, according to the tariffs prescribed in the Fifth Schedule.

Repeat Inspection§

70.
(a)Where it is written in the summarising opinion for design inspection as referred to in regulation 45 that the design inspection was found not to be in order, the applicant may submit to the same inspection institute a repeat application in respect of the same permit application, upon payment of the amount prescribed for repeat design inspection in the Fifth Schedule, provided that the repeat application is submitted within six months of the date of receipt of the first summarising opinion in respect of that permit application.
(b)Notwithstanding the provisions of sub-regulation (a), where an inspection institute has not submitted an interim report as referred to in regulation 42(c) or 44(b), and it is written in the summarising opinion for design inspection as referred to in regulation 45 that the design inspection was found not to be in order, the applicant may submit an application for repeat design inspection in respect of the same permit application to the same inspection institute within 21 days of the date on which the summarising opinion was served upon him, without payment of an additional fee.
(c)Where an inspection institute has notified that the application for design inspection cannot be accepted as referred to in regulation 41(b), and the applicant has not notified of the termination of the engagement with the institute as referred to in that regulation, the applicant may submit to the same inspection institute an application for design inspection without additional payment of a fee.
(d)Where an inspection institute has notified that the application for construction inspection cannot be accepted as referred to in regulation 52(a) and an amended application for construction inspection is submitted within two months of the notification as referred to, the fee referred to in regulation 73(a)(2) shall be paid again only from the second amended application onwards.
(e)Subject to the provisions of this regulation regarding the payment of a fee, a repeat inspection application shall be treated as the submission of a new application.

Payment for an Additional Visit or a Repeat Visit§

71.
(a)Where an inspection institute is required to carry out an additional visit under regulation 55(2), (3) or (4), the fee prescribed therefor in the Fifth Schedule shall be paid for each such additional visit.
(b)Where an inspection institute is required to carry out a repeat visit under regulation 55(1), the fee prescribed therefor in the Fifth Schedule shall be paid for a repeat visit only from the third repeat visit during the entire construction inspection period.

Payment for Inspection of Amended Working Plans§

72.
(a)Where an inspection institute has carried out inspection of amended working plans as referred to in regulation 61(a) that affect two or more inspection domains as referred to in regulation 61(b), a fee at the rate of 30% of the fee prescribed in the Fifth Schedule for design inspection shall be paid at the time prescribed therefor in regulation 73(a)(4).
(b)Where an inspection institute has carried out inspection of amended working plans as referred to in regulation 61(a) and the submission of calculations, drawings or schematics was required as referred to in regulation 61(b), the fee prescribed in the Fifth Schedule for design inspection shall be paid at the time prescribed therefor in regulation 73(a)(4).

Time of Payment§

73.
(a)A fee to an inspection institute shall be paid at the times set out below:
(1)upon entering into an engagement agreement with an inspection institute for the provision of design inspection services under regulation 40, a fee for design inspection shall be paid;
(2)upon entering into an engagement agreement for the provision of construction inspection services under regulation 50, a fee at the rate of 30% of the fee prescribed in the Fifth Schedule for construction inspection shall be paid;
(3)upon inviting the inspection institute to carry out inspection at the structural frame completion stage as referred to in regulation 54(c)(5), a fee at the rate of 30% of the fee prescribed in the Fifth Schedule for construction inspection shall be paid;
(4)upon submission of an application for the issuance of a summarising opinion for construction inspection under regulation 62, the balance of the fee for construction inspection shall be paid, including a fee for a repeat visit or additional visit under regulation 71, the difference in fee due to discrepancies in areas between the total construction area calculated in applications under regulation 91(b)(2) or (3) and the final total construction area, and a fee for design inspection of amended working plans as referred to in regulation 72.
(b)The fee or any part thereof that is to be paid shall be paid according to its updated rate on the day of payment as referred to in regulation 74.
(c)The total fee amount to be paid at each of the times referred to in sub-regulation (a), derived from the calculation of the amounts prescribed in the Fifth Schedule, shall be rounded to the nearest amount that is a multiple of NIS 5.

Linkage§

74.
(a)The amounts set out in the Fifth Schedule shall be updated on 1 February of each year (hereinafter – the change date) according to the rate of change of the new index compared with the base index.
(b)(Repealed)
(c)In this regulation –

"new index" – the index most recently published before the change date;

"base index" – the index published in January 2025;

"index" – the consumer price index published by the Central Bureau of Statistics.

(d)The director of the Planning Administration shall publish in Reshumot (Official Gazette) a notice of the updated fee amounts under this regulation.

Counting of Days§

75.

The counting of days for the performance of an action under these Regulations shall begin from the date of payment of the fee to the inspection institute, unless otherwise provided in these Regulations or in section 83(n)(2)(c) of Amendment 101 to the Law.

Refund of Payment§

76.

An inspection institute shall refund to the payer the fee paid to it for design inspection or construction inspection, as the case may be, where one of the following has occurred:

(1)a notice has been received under regulation 15(b) of the cancellation or suspension of the licence of the inspection institute with which the engagement was made before the summarising opinion was given under regulation 45(b) or 63, as the case may be;
(2)the inspection institute with which the engagement was made has ceased to exist and the summarising opinion under regulation 45(b) or 63, as the case may be, has not yet been given;
(3)a notice has been received under regulation 23(2)(b) that the inspection institute is in a conflict of interests and is not permitted to handle the application before the summarising opinion was given under regulation 45(b) or 63, as the case may be;
(4)a notice has been received under regulation 41(b) that the application was not accepted, and the applicant has notified of the termination of the engagement with the inspection institute;
(5)an inspection institute has not notified of its decision regarding the application for construction inspection at the time prescribed therefor in regulation 51, and the applicant's notice of termination of the engagement with the inspection institute has been received within 5 days, as referred to in regulation 52(c);
(6)30 days or 60 days have elapsed from the date on which the application for design inspection was accepted at the inspection institute and a summarising opinion for design inspection has not been given by the inspection institute as referred to in regulations 42 or 44, as the case may be, and the applicant's notice of termination of the engagement with the inspection institute has been received within five days, as referred to in regulation 46.

Partial Refund of Payment§

77.
(a)An inspection institute shall refund to the payer 20% of the fee paid to it for design inspection if the concluding opinion was not given by the date prescribed therefor in regulation 42 or 44, and the applicant's notice of termination of the engagement was not received within five days as referred to in regulation 46.
(b)An inspection institute shall refund to the payer 20% of the fee paid to it for construction inspection if it did not give notice of its decision on the application for construction inspection by the date prescribed therefor in regulation 51, and the applicant's notice of termination of the engagement was not received within five days as referred to in regulation 52(c).
(c)An inspection institute shall refund to the payer 20% of the fee paid to it for construction inspection if the concluding opinion was not given by the date prescribed therefor in regulation 63.
(d)In a case where there is a negative gap between the total building area that was built and the total building area planned to be built on the basis of which the total fee amount set out in the Fifth Schedule for design inspection was calculated, the inspection institute shall refund to the payer from the total fee amount paid to it the proportion of the excess fee amount.

Date of Refund of Payment§

78.
(a)Where an inspection institute is required to refund a fee under these Regulations, the institute shall refund the fee to the payer within three days from the day on which it became known to it that the conditions set out in regulation 76 or 77 were fulfilled.
(b)The return of amounts from the inspection institute to the payer may be effected by way of set-off of debts owed by the payer to the inspection institute; if the payer has no such debt, or if the amount of the debt is lower than the amount to be transferred, the amount or the unset-off balance thereof, as the case may be, shall be transferred.

Set-Off of Fee to an Inspection Institute in respect of an Approval Given by an Approving Body§

78a.

In a case where an authorised inspector does not hold the power of an approving body under the enactment in respect of which he is authorised to give approval, and an application has been submitted to the approving body for its approval in respect of the matters within its authority in connection with a permit application and work under a permit, the total fee amount set out in the Fifth Schedule for design and construction inspection in respect of that permit application shall be reduced by the proportion of the fee amount payable to the approving body as aforesaid in respect of that permit application, provided that proof of payment of a fee to the approving body as aforesaid has been presented to the inspection institute.

Chapter VIII: Reporting and Supervision

Section A: Reporting

Inspection Institute Reports§
79.

An inspection institute shall furnish to the person in charge reports and documents, at the times prescribed in these Regulations, on the matters detailed therein and in the format directed by the person in charge.

Annual Report§
80.

The director of an inspection institute shall submit to the person in charge, within one month of the end of each year, an annual report on the institute's activity in the format directed by the person in charge, which shall include at least the following matters:

(1)the number of applications for design inspection and construction inspection submitted to the inspection institute, the number of applications that were received and the number of applications that were required to be submitted again one or more times before being received;
(2)the number of applications for design inspection in respect of which an interim report in design inspection as referred to in regulations 42 and 44 was not submitted;
(3)the number of applications for repeat design inspection;
(4)details of deviations from the dates prescribed in the Regulations, the duration of the deviation and the reasons therefor;
(5)details of payment refunds that the institute was required to make and payment refunds that it actually made;
(6)details of additional payments for repeat or additional visits demanded by the institute;
(7)the number of opinions in which the results of the design inspection or construction inspection were found to be in order and the number of opinions in which the results of the design inspection or construction inspection were found not to be in order;
(8)the number of design inspection and construction inspection files that the applicant or the permit holder, as the case may be, requested to discontinue handling;
(9)details of applications submitted to the inspection institute after the commencement of works that had been inspected at another inspection institute under regulation 67;
(10)details of the inspectors employed by the institute during the year;
(11)details of the consultants with whom the inspection institute engaged under regulation 20, including details of the design inspection and construction inspection files in respect of which such consultation was provided;
(12)a report on cases of conflict of interest as referred to in regulation 23 during the year;
(13)a report on special events as referred to in regulation 81 that occurred during the reporting period;
(14)(Repealed)
Immediate Report of a Special Event§
81.
(a)An inspection institute shall provide the person in charge with an immediate, full and detailed report of any event that has affected or is likely to materially affect its functioning, including the filing of a claim against the inspection institute, and also of any change that has occurred in the information it provided at the time of submission of the application for a licence as referred to in regulation 4, or if a condition among the conditions for the grant of a licence or among the conditions included in the licence has been changed or has ceased to be fulfilled.
(b)For as long as the special event continues, the inspection institute shall provide ongoing reports at the frequency directed by the person in charge, and the person in charge may at any time require any information relating to the event to be provided to him.
Report to the Minister§
82.

A report to the person in charge as referred to in these Regulations shall be deemed a report to the Minister under section 158ad of the Law.

Requirement to Correct the Report§
83.

The person in charge may require a licence holder to make corrections, completions and additions to the reports detailed in this Section; if the person in charge has required corrections, completions or additions as aforesaid, the inspection institute shall complete what is missing within the period directed by the person in charge.

Report to the Knesset§
84.

The Minister shall report to the Interior and Environmental Protection Committee of the Knesset, 36 months after the commencement of these Regulations, on all of the following:

(1)the readiness of inspection institutes for the transfer of the powers vested in an approving body to authorised inspectors under sections 89b(a)(1) and 89c(b)(1), including the conducting of training and certification in respect of such powers;
(2)the cost of an inspection hour required for the performance of design inspection and construction inspection, and the number of inspection hours required for the performance of such inspection; such a report shall be given after the Minister has examined the activity of inspection institutes and the need to update the cost of an inspection hour and the number of inspection hours required according to the result of that examination.