Israeli Legislation.com

Natural Gas Sector Law, 5762-2002

חוק משק הגז הטבעי, תשס"ב-2002

Published: 2002-01-03Consolidated Hebrew text as of 2026-06-29 · Last amended 2026-03-31✓ Amendment status checked against the Knesset legislation record on 2026-11-10
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

First Schedule (section 26c(c))

1.§

A plan at a scale of 1:500, to be drawn up on a survey map prepared and signed by a licensed surveyor under the Survey Ordinance, updated to the year preceding the date of submission of the application, on which all of the following have been marked on the map in a manner that enables each of them to be read separately or together with the others:

(1)the strip of land designated for the laying of an underground gas pipeline that is part of the distribution network, the alignment of the strip and its width, and a specification of the restrictions that shall apply to it;
(2)the location of transition point installations;
(3)land uses and restrictions relating to land uses, pursuant to all the approved plans under the Planning and Building Law that apply within the area of the application;
(4)all infrastructure installations and all gas installations situated within the area of the application, including installations as aforesaid that have not yet been constructed but have been approved in a plan under the Planning and Building Law, and the restrictions applicable to them;
(5)an area for temporary works ancillary to the works for the construction of the gas installation pursuant to the application, if the applicant requests that the permit in the expedited procedure include provisions in respect of such an area, including an area for earth stripping, a storage area and a temporary access road to it;
(6)an ignition-source-free zone around installations that include venting, if required; for this purpose, "ignition sources" and "venting" – as defined in the Regulations under section 25(o).
2.§

A construction and infrastructure coordination appendix, signed by the planner of the gas installation, which shall address, inter alia, the following matters:

(1)the position of the planned gas installation on the survey map as referred to in section 1 of this Schedule, including marking of the location of existing and planned infrastructure installations;
(2)a specification of the proposed design of the gas installation, including the planned pressures, the depth of burial and above-ground and underground crossings of other infrastructure installations, all with reference, inter alia, to a description of the terrain, to adjacent infrastructure installations and adjacent gas installations, underground and above-ground, to structures, and also to building lines pursuant to Israeli Standard SI 5664, Part 3;
(3)required point-specific design details, including details of the crossing and signage;
(4)an area for temporary works, if required, as referred to in section 1(5) of this Schedule.
3.§

A specification approved under section 24, for the gas installation in respect of which the application was submitted.

4.§

The information or response transmitted by the owners of infrastructure installations pursuant to the provisions of section 26c(b), if transmitted, or a copy of the referral to an infrastructure installation owner, if the distribution licence holder did not receive information or a response as aforesaid from the owner.

Second Schedule (sections 26c(b) and 26d(b))

1.§

In a referral to an infrastructure installation owner pursuant to the provisions of section 26c(b), the distribution licence holder shall state that the infrastructure installation owner may provide the licence holder with the information regarding the infrastructure installation within the area of the application and with the owner's response to the application, within 15 days from the date on which the referral was delivered to the owner; a distribution licence holder shall attach to such referral a plan pursuant to the provisions of section 1(1) of the First Schedule and a description of the requested installation, including the characteristics of the pipeline and the requested pipeline pressure.

2.§
(a)In a notice to an infrastructure installation owner or an owner of real property pursuant to the provisions of section 26d(b), the applicant shall state that the infrastructure installation owner or owner of real property may submit comments on the application to the committee engineer or the district planner to whom the application was submitted, as the case may be, with a copy to the applicant, within 15 days from the date on which the notice was delivered to the owner, and that an infrastructure installation owner or owner of real property who has not submitted comments as aforesaid shall be regarded as having consented to the application pursuant to the provisions of section 26d(c); the applicant shall attach to such notice the application, including the application documents listed in sections 1 and 2 of the First Schedule.
(b)
(1)A notice to an owner of real property under section 26d(b) shall be delivered or sent to the owner of the real property at the owner's known address, by personal delivery or by registered post with acknowledgement of receipt, or to an electronic mail address provided to the applicant by the owner of the real property for the purpose of sending a notice under this subsection;
(2)if the applicant does not know the address of the owner of the real property as aforesaid, and was unable to obtain it by reasonable effort –
(a)the applicant shall declare, in a signed and authenticated affidavit, that the address of the owner of the real property is not known to the applicant and that the applicant made a reasonable effort to obtain it (hereinafter – the affidavit);
(b)the applicant shall publish a notice on a prominent sign in the vicinity of the parcel of the owner of the real property and also on the applicant's website; such notice shall detail the main points of the application, the area of the application, the methods of inspecting the application including the possibility of receiving the application digitally, and the possibility of the owner of real property within the area of the application submitting comments on the application to the committee engineer or the district planner to whom the application was submitted, as the case may be, with a copy to the applicant, within 21 days from the date of publication.
(c)Where the applicant has sent, delivered or published, as the case may be, a notice to an infrastructure installation owner or to an owner of real property pursuant to the provisions of section 26d(b) and the provisions of this section, the applicant shall transmit to the approving authority a reference attesting to this and to the date on which the applicant did so; where the applicant published a notice to an owner of real property whose address is unknown pursuant to the provisions of subsection (b)(2), the applicant shall also transmit the affidavit to the approving authority.

Page 8 of 8

Read the entire law on one page — continuous text, no page breaks, plus formal citations.