Water and Sewerage Corporations (Infrastructure Fees for Water Systems and Sewerage Systems) Rules, 5775-2015
כללי תאגידי מים וביוב (דמי הקמה למערכות מים ולמערכות ביוב), תשע"ה-2015
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More
This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.
Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.
The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.
This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.
Rules 5786-2025
First Schedule (Sections 5, 6, 10, 13, 24 and 25)
Part 1: Base Tariff
The base tariff of the infrastructure fees is NIS 95.74 per square metre, excluding value added tax.
Part 2: Infrastructure Fee Tariffs in Companies by Their Components
(in new shekels per square metre, excluding value added tax)
In this Part, "mountain corporation" means a company within whose area there are differences in elevation exceeding 100 metres, as referred to in section 5(b).
| The Company | Column 1 | Column 2 | Column 3 | Column 4 | Column 5 | Column 6 | |
|---|---|---|---|---|---|---|---|
| Addition for mountain corporation | Addition for completion of reinstatement value ratio to 0.5 | Addition or reduction due to special costs | Addition for property built at low density | Total tariff for property not built at low density | Total tariff for property built at low density | ||
| (1) | Al Ein Ltd. | 18.96 | - | - | 17.20 | 114.70 | 131.90 |
| (2) | HaBe'er HaShlishit – Water and Sewerage Corporation Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (3) | HaGichon Jerusalem Water and Sewerage Corporation Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (4) | Harei Nazareth Water and Sewerage Works Ltd. | 18.96 | - | - | 17.20 | 114.70 | 131.90 |
| (5) | HaTanur Water and Sewerage Ltd. | 18.96 | - | - | 17.20 | 114.70 | 131.90 |
| (6) | Yuvalim Ashdod Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (7) | Yuvalim BaShomron Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (8) | Yamim Kiryat Yam Water Corporation Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (9) | Kfar Galil Tachton Ltd. | 18.96 | - | - | 17.20 | 114.70 | 131.90 |
| (10) | Mei Avivim 2010 Ltd. | - | 0.83 | 9.57 | 33.51 | 106.14 | 139.65 |
| (11) | Mei Ono Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (12) | Mei Ashkelon Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (13) | Mei Shemesh Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (14) | Mei Barak Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (15) | Mei Bat Yam Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (16) | Mei Givataim Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (17) | Mei Galil Ltd. | 18.96 | - | - | 17.20 | 114.70 | 131.90 |
| (18) | Ma'ayanot HaDarom Ltd. | 31.40 | 2.23 | - | 44.50 | 129.36 | 173.86 |
| (19) | Mei Hod HaSharon Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (20) | Mei Herzliya Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (21) | Neve Midbar Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (22) | Mei Hadera Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (23) | Mei Yavne Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (24) | Mei Carmel Ltd. | 31.40 | 1.07 | - | 44.50 | 128.20 | 172.70 |
| (25) | Mei Lod Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (26) | Mei Modi'in Ltd. | 31.40 | - | - | 44.50 | 128.20 | 172.70 |
| (27) | Mei Na – Water and Sewerage Company of Nof HaGalil Municipality Ltd. | 31.40 | - | - | 44.50 | 128.20 | 172.70 |
| (28) | Mei Netanya (2003) Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (29) | Mei Iron Ltd. | 18.96 | - | - | 17.20 | 114.70 | 131.90 |
| (30) | Mei Akko Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (31) | Mei Tziyona Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (32) | Ma'ayanot HaChof | - | - | - | 33.51 | 95.74 | 129.25 |
| (33) | Mei Kiryat Gat Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (34) | Mei Rahat Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (35) | Mei Ramat Gan Ltd. | - | 1.43 | - | 33.51 | 97.17 | 130.68 |
| (36) | Mei Ra'anana Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (37) | Mei Raket Tiberias Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (38) | Mei Sheva Water and Sewerage Corporation for Be'er Sheva Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (39) | Mei Shikma Water and Sewerage Corporation Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (40) | Mei Tikva Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (41) | Meytav Regional Water and Sewerage Company Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (42) | Maniv Rishon Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (43) | Ma'ayanot Ata Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (44) | Ma'ayanot HaMeshulash Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (45) | Ma'ayanot HaAmakim Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (46) | Ma'ayanot HaSharon Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (47) | Ma'ayanot Ziv Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (48) | Sovev Shfar'am Ltd. | 18.96 | - | - | 17.20 | 114.70 | 131.90 |
| (49) | Ein Afek Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (50) | Ein HaKeramim Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (51) | Ein Netafim Eilat Water and Sewerage Works Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (52) | Peleg HaGalil Regional Water and Sewerage Company Ltd. | 18.96 | - | - | 17.20 | 114.70 | 131.90 |
| (53) | Palgei Muskatin Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (54) | Palgei HaSharon Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (55) | Sharonim Water and Sewerage Works Ltd. | - | - | - | 33.51 | 95.74 | 129.25 |
| (56) | TAMAR Ramla Water Corporation Ltd. | - | - | 9.57 | 33.51 | 105.31 | 138.82 |
| (57) | Mei HaHar Ltd. | 31.40 | - | - | 44.50 | 127.14 | 171.64 |
| (58) | Mei Tzafon HaSharon Ltd. | - | — | - | 33.51 | 95.74 | 129.25 |
| (59) | Mei Nahariya Ltd. | - | 5.91 | - | 33.51 | 101.64 | 135.15 |
Second Schedule
(Section 9(c)(2))
Assignment and Waiver of Rights Form regarding Water Supply Infrastructure of Another Supplier
Property owner's name Property number
Telephone for enquiries
Facsimile address
Electronic mail
To
[Name of Company]
I, the undersigned, Identity Number
[Mark in the appropriate place. In the absence of a marking, the option applicable in practice to the circumstances shall apply.]
hereby assign (transfer) to you every right vested in me against the water supplier (hereinafter — the other supplier) with respect to the infrastructure used for the supply of water to the property described above by means of the other supplier and with respect to the payments paid therefor, if I have such rights, and subject to the assignment (transfer) as aforesaid, I waive every claim and demand against the other supplier and against the company with respect to those rights.
I hereby confirm that no right whatsoever is vested in me against the water supplier (hereinafter — the other supplier) with respect to the infrastructure used for the supply of water to the property described above by means of the other supplier and with respect to the payments paid therefor, and I waive every claim and demand against the other supplier and against the company with respect to such rights.
Date Applicant's signature ______________________
Third Schedule (Section 9(f))
Date
To Whom It May Concern,
I hereby confirm that the company [delete as appropriate] for the establishment of a water or sewerage system enabling the connection of the property/properties at for the first time [delete as appropriate], and that the company has decided to publish a tender for carrying out the establishment or to engage in another lawful manner with an entity that will carry out the establishment, within 12 months.
______________________
[Name, position and signature]
Fourth Schedule (Section 14(a))
Date
Infrastructure Fee Payment Demand Form
Pursuant to section [delete as appropriate] of the Water and Sewerage Corporations (Infrastructure Fees for Water Systems and Sewerage Systems) Rules, 5775-2015 (hereinafter — the Rules), you are required to pay infrastructure fees as detailed below, within days of the date of service of this demand:
| Type | Property owner's name | Address | Identity No./Company No./VAT No. | Miscellaneous |
|---|
Application number: XXXXX
[This part shall be completed in a payment demand pursuant to section 9(a)(1) of the Rules]
| Building file: | Date of submission of application: | ||
|---|---|---|---|
| Construction address: | — | Neighbourhood: | — |
| Block and parcel: | — | Plot area: | — |
| — | Construction area: | — | |
| Primary use of property: | — | Description of application: | — |
Area for charge calculation:
Square metres
Total building area in the property
Building area in the property for which a prior payment was made or which is to be regarded as such
Remaining building area chargeable with infrastructure fees
Area for calculation of advance payment in a payment demand pursuant to sections 9(a)(2) and 13 of the Rules:
Square metres
33% of the principal area permitted for construction under the current plan
Building area in the property for which a prior payment was made or which is to be regarded as such
Remaining building area chargeable with infrastructure fees
Infrastructure fees for water systems and sewerage systems:
Value Added Tax
Total payable in New Israeli Shekels
To pay this payment demand, please contact the collection department.
[Applicable to a payment demand pursuant to section 9(a)(1) of the Rules]
Settlement of the payment demand shall be a condition for the company's approval to the local committee that all payments owing to the company in respect of the property have been settled;
If this payment demand is not settled within 45 days of the date of its service, it shall lapse unless a building permit has been issued for the property; in such a case the company shall serve on you a new payment demand in accordance with the amount of the infrastructure fees at the time of its service.
[Applicable to a payment demand pursuant to section 9(a)(3) of the Rules]
Settlement of the payment demand shall be a condition for connecting the property to the water supply or to the sewerage flow; if this payment demand is not settled within 45 days of the date of its service, it shall lapse unless the property has been connected to the water supply or to the sewerage flow; in such a case the company shall serve on you, at your request, a new payment demand in accordance with the amount of the infrastructure fees at the time of its service.
You are entitled, within 30 days of the date on which this payment demand was served on you, to approach the company with a request to conduct a review of the payment demand (hereinafter – a review request), which shall be made in accordance with the form set out in the Fifth Schedule to the Rules (attached hereto).
Public reception hours on days at hours
Please note –
The matters in respect of which a review request may be submitted are the following only:
The submission of a review request shall not defer the date of settlement of the payment demand; however, you are entitled to request the company to defer the date of settlement.
With respect to a property charged with infrastructure fees as a property built at low density even though under the current plan additional dwelling units may be built therein, which, had they also been included in the approved permit application, the charge for infrastructure fees would have been at the tariff for a property not built at low density:
Subject to settlement of this payment demand, it shall be possible to build in the property an additional square metres without an additional charge for infrastructure fees, provided that a permit application for the construction of at least additional dwelling units is approved within 7 years of the date of payment pursuant to this demand.
| Section | Description | Quantity | Units | Tariff | Amount in New Israeli Shekels |
|---|---|---|---|---|---|
| — | — | — | Square metres | — | — |
| — | — | — | Square metres | — | — |
Fifth Schedule (Section 15(a))
Form for a Review Request of an Infrastructure Fee Payment Demand
Name of property owner: Property no.:
: Telephone for enquiries:
Address: Fax no.:
Electronic mail:
To
[Name of company]
I, the undersigned, identity no. , request a review of payment demand no. (please state the number of the payment demand in respect of which the review is requested), on account of an error that occurred in the payment demand, in accordance with the Water and Sewerage Corporations (Infrastructure Fees for Water Systems and Sewerage Systems) Rules, 5775-2015 (hereinafter – the Rules).
Below are updated details concerning the payment demand:
Identity no. of the person liable: Name of property owner:
Chargeable plot area: Date of original application:
Principal use of property: Address of property:
The matters in respect of which I am submitting this review request are:
The area chargeable with infrastructure fees;
The identity of the person liable to pay infrastructure fees;
The existence of a prior payment which pursuant to sections 11, 12(b) or 13 of the Rules requires the cancellation of the charge or the reduction of the amount of the payment demand;
A clerical error, an error in the description of a person or property, in a date, in a number or in a calculation, or another technical error in the payment demand.
Below is a detailed explanation of the request and its grounds:
Attached hereto are documents in support of this request.
Date Signature of applicant __________________
Rules 5777-2016
Sixth Schedule (Section 25a)
Al Ein Ltd.;
Harei Nazareth Water and Sewerage Works Ltd.;
HaTanur Water and Sewerage Ltd.;
Kfarei Galil Tahton Ltd.;
Mei Galil Ltd.;
Mei Iron Ltd.;
Sovev Shfaram Ltd.;
Peleg HaGalil Regional Water and Sewerage Company Ltd.
6 Nisan 5775 (26 March 2015) Alexander Kushner
Read the entire law on one page — continuous text, no page breaks, plus formal citations.