Water and Sewerage Corporations (Infrastructure Fees for Water Systems and Sewerage Systems) Rules, 5775-2015

כללי תאגידי מים וביוב (דמי הקמה למערכות מים ולמערכות ביוב), תשע"ה-2015

Published: 2015-03-31Consolidated Hebrew text as of 2026-01-01 · Last amended 2023-10-30
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

Chapter III: Imposition of Infrastructure Fees and Their Payment

Imposition of Obligation to Pay Infrastructure Fees§

9.
(a)A company shall impose on a property owner an obligation to pay infrastructure fees upon the occurrence of what is stated in one of paragraphs (1), (3) and (4), and it may impose on a property owner an obligation to pay infrastructure fees upon the occurrence of what is stated in paragraph (2):
(1)a request for a permit for construction in the property has been approved;
(2)the company has established the water system or the sewerage system enabling the property to be connected for the first time to the water supply or to the flow of sewage, or has commenced operations for the establishment as aforesaid;
(3)the company has connected the property for the first time to the water supply or to the flow of sewage;
(4)it has come to the company's knowledge that there is deviant construction in the property.
(b)A condition for the imposition of an obligation to pay infrastructure fees upon the occurrence of what is stated in subsections (a)(1) and (a)(4) is that a water system or a sewerage system has been established that serves or will serve what has been or will be constructed in the property, or that the company has commenced operations for the establishment of a water system or a sewerage system as aforesaid, enabling the property to be connected to the water supply or to the flow of sewage.
(b1)A condition for the imposition of an obligation to pay infrastructure fees under subsection (a)(4) in respect of construction whose establishment was completed seven years or more before the charge is that what is stated in at least one of paragraphs (4)(b) or (c) in the definition of "deviant construction" is satisfied in respect of that construction.
(c)For the purpose of the obligation to pay infrastructure fees upon the occurrence of what is stated in subsection (a)(3) —
(1)a lawful connection of a property to the water supply or to the flow of sewage, replacing a connection that was made unlawfully, shall be regarded as a first connection;
(2)a connection of a property to the water supply, replacing a previous connection of the same property to the water supply by means of another supplier, shall be regarded as a first connection, unless the owner of the property has assigned to the company its rights against the other supplier in respect of the infrastructure used for the water supply to the property and the payments made therefor, if it has such rights, or has confirmed that it has no such rights, by way of signing a form in the form set out in the Second Schedule or in another manner approved by the company, provided that the company has notified the owner of the property that since the connection it has carried out or is about to carry out replaces a connection by another supplier, the owner shall not be charged infrastructure fees if the conditions of this paragraph are fulfilled and the manner in which the owner must act in order to do so.
(d)In a charge under subsection (a) —
(1)where a sewerage system has been established or the company has commenced its establishment, and a water system has not been established and the company has not commenced its establishment, the owner of the property shall be charged partial infrastructure fees for sewerage, and shall not be charged partial infrastructure fees for water as long as the company has not commenced operations for the establishment of a water system;
(2)where a water system has been established or the company has commenced its establishment, and a sewerage system has not been established and the company has not commenced its establishment, the owner of the property shall be charged partial infrastructure fees for water, and shall not be charged partial infrastructure fees for sewerage as long as the company has not commenced operations for the establishment of a sewerage system.
(e)Notwithstanding the provisions of subsection (a), a company that has entered into an agreement approved by the Commissioner with a developer of a development complex, pursuant to which the establishment of the water system and the sewerage system within the development complex, or one of them, in whole or in part, shall be carried out by means of the developer or its agent, shall deduct from the total infrastructure fees with which the owners of the properties in the development complex are to be charged under paragraphs (1), (3) or (4) of subsection (a), as the case may be, the value of the establishment works to be carried out by means of the developer or its agent, as agreed upon by the company and the developer, provided that it shall not exceed the infrastructure fees calculated in accordance with the First Schedule.
(f)A certificate of the general manager of the company that the company has commenced operations for establishment, in accordance with the form set out in the Third Schedule, shall constitute evidence of its contents.

Calculation of the Amount of Infrastructure Fees§

10.
(a)Infrastructure fees shall be calculated according to the area of construction in the property, and the amounts shall be the sum obtained by multiplying the area of construction in the property by the infrastructure fee tariffs prescribed for the company in column 5 or column 6, as the case may be, in Part 2 of the First Schedule.
(b)The area by which the amount of infrastructure fees shall be calculated in respect of construction for which a request for a permit has been approved is the area of the new construction approved as aforesaid, and if the request for a permit is not found — the area of the new construction as it would have been calculated for the purpose of submitting a request for a permit at the time of delivery of the payment demand.
(c)The area by which the amount of infrastructure fees shall be calculated in respect of deviant construction shall be the area of the deviant construction as it would have been calculated for the purpose of submitting a request for a permit at the time of delivery of the payment demand.
(d)Notwithstanding the provisions of subsection (a) and section 11(a), where the circumstances referred to in section 103(a)(3) of the Law are satisfied, the amount of infrastructure fees shall be calculated in respect of all the construction area as referred to in subsections (b) and (c), however in respect of areas not taken into account under section 11(a), the infrastructure fee tariffs prescribed for the company in column 5 or column 6, as the case may be, in Part 2 of the First Schedule shall be calculated with a reduction of 90% thereof or a reduction at a higher rate to be decided by the board of directors of the company.

Prior Payment§

11.
(a)Notwithstanding the provisions of section 10(a) to (c) —
(1)where a prior payment has been made in respect of construction in a property, the area of that construction shall not be included in the calculation of the area by which the amount of infrastructure fees is to be calculated;
(2)in a property in which there was a building or part of a building that was demolished or in which there is a building or part of a building intended for demolition in connection with the new construction (hereinafter in this Section — the demolished building) and a prior payment was made in respect of the demolished building, the amount of infrastructure fees shall be calculated only according to the area of the approved construction or the area of the deviant construction, as the case may be, that exceeds the area of the demolished building.
(b)The area of the construction or the demolished building, as the case may be, in respect of which a prior payment was made as referred to in subsection (a), shall be calculated as it would have been calculated for the purpose of submitting a request for a permit at the time of delivery of the payment demand, even if at the time of the prior payment a different method of calculating areas was in use.
(c)Where a prior payment was made in respect of a water system and no prior payment was made in respect of a sewerage system, or a prior payment was made in respect of a sewerage system and no prior payment was made in respect of a water system, the charge for infrastructure fees shall be split into partial infrastructure fees for water and partial infrastructure fees for sewerage, and the provisions of subsections (a) and (b) shall apply for the purpose of calculating the area only in respect of the partial infrastructure fees for water or for sewerage, as the case may be.
(d)All of the following shall be regarded as construction in respect of which a prior payment has been made:
(1)construction whose establishment commenced before the commencement date, including a demolished building whose establishment was made with a permit, in a property that was connected before the commencement date by the local authority or the company or in another lawful manner to the water supply by means of a water system or to the flow of sewage by means of a sewerage system, provided that if the construction was deviant construction, it has been proved that at least seven years have elapsed since the commencement of the company's operations or the inclusion of the area in which the property is situated within its territory, as the case may be, and that what is stated in paragraphs 4(b) or (c) in the definition of "deviant construction" is not satisfied in respect of that construction;
(1a)a solar parking canopy whose establishment commenced before the 5th of Tevet 5791 (31 December 2030) and which actually serves for the parking of vehicles;
(1b)a solar canopy of a sports field whose establishment commenced before the 20th of Tevet 5789 (31 December 2028) and which actually serves as a sports field;
(2)any other construction in respect of which it has been proved that a prior payment was made.
(e)All of the following shall be regarded as construction in respect of which a prior payment has been made, unless the construction is deviant construction or unless the contrary has been proved:
(1)construction in a property that was connected by the company on the commencement date or thereafter to the water supply by means of a water system or to the flow of sewage by means of a sewerage system;
(2)construction whose establishment commenced on the commencement date or thereafter, in a property that was connected by the local authority or the company or in another lawful manner to the water supply by means of a water system or to the flow of sewage by means of a sewerage system.

Additional Dwelling Units§

12.
(a)Where infrastructure fees have been paid in respect of a property built at low density in which additional dwelling units may be constructed, and a request for a permit to construct additional dwelling units has been approved within 7 years from the date of such payment, 26 per cent of such payment shall be regarded, for the purpose of calculating infrastructure fees in respect of the additional dwelling units, as a prior payment in respect of additional construction area equal to 35 per cent of the construction area calculated for the purpose of such payment; where a request for a permit to construct additional dwelling units has not been approved within 7 years as aforesaid, the full amount of such payment shall be regarded as a prior payment only in respect of the construction area included in the calculation of the original payment.
(b)In a payment demand in respect of a property built at low density in which additional dwelling units may be constructed, the construction area of the additional dwelling units that may be constructed within seven years from the date of payment without an additional charge for infrastructure fees and the minimum number of additional dwelling units that must be constructed as aforesaid so that no additional charge for infrastructure fees shall apply in respect of that area, as referred to in subsection (a), shall be specified.

Calculation of Infrastructure Fees Imposed before the Rules 5786-2025 Permit§

13.
(a)Where the condition referred to in section 9(a)(2) has been satisfied and a request for a permit for construction in the property has not yet been approved, or where a request for a permit for construction whose area is less than 33 per cent of the construction area permitted under the plan has been approved, the company may impose on the owner of the property an obligation to pay an advance on account of infrastructure fees as referred to in subsection (b).
(b)The amount of the advance that the company may impose upon the occurrence of what is stated in subsection (a) is the sum obtained by multiplying 33% of the construction area permitted under the plan less the area as aforesaid in respect of which a prior payment was made, by the infrastructure fee tariffs prescribed for the company in column 5 or column 6 in Part 2 of the First Schedule, as the case may be, and where imposed on a developer — not more than the total amount of infrastructure fees that the company may impose on the owners of properties in the complex under section 9(e).
(c)Upon the imposition of an obligation to pay infrastructure fees under section 9(a)(1), (3) or (4) in respect of a property in respect of which an advance as referred to in this Section has been paid, the area in respect of which the advance was paid shall be regarded as construction area in respect of which a prior payment has been made.
(d)Where infrastructure fees have been paid under subsection (b) but the carrying out of the works for the establishment of the water system or the sewerage system has not commenced within three years from the date of payment, the company shall return to the owner of the property the amount paid together with the Accountant General's interest.

Chapter IV: Payment Demand and Its Settlement

Demand for Payment of Infrastructure Fees and Its Settlement§

14.
(a)A company shall deliver to a property owner liable for infrastructure fees a payment demand drawn up in accordance with the Fourth Schedule (hereinafter — payment demand).
(b)The payment demand shall be delivered shortly after the time at which one of the conditions in section 9(a)(1), (2) or (4) has been satisfied, and shortly before the time at which the condition referred to in section 9(a)(3) is expected to be satisfied.
(c)A payment demand delivered by reason of the satisfaction of the condition in section 9(a)(1) shall be settled within 45 days from the date of its delivery, and its settlement shall be a condition for the company's confirmation to the local committee that all payments payable to the company in respect of the property have been settled; where the demand has not been settled within the said period, it shall lapse unless a permit has been granted; where the demand has lapsed, the company shall deliver to the owner of the property a new payment demand in accordance with the amount of infrastructure fees at the time of its delivery.
(d)A payment demand delivered by reason of the satisfaction of the condition in section 9(a)(2) shall be settled within three months from the date of its delivery.
(e)A payment demand delivered by reason of the satisfaction of the condition in section 9(a)(3) shall be settled within 45 days from the date of its delivery, and its settlement shall be a condition for the connection of the property to the water supply or to the flow of sewage; where the demand has not been settled within the said period, it shall lapse unless the connection has been carried out; where the demand has lapsed, the company shall deliver to the owner of the property a new payment demand in accordance with the amount of infrastructure fees at the time of its delivery.
(f)A payment demand delivered by reason of the satisfaction of the condition in section 9(a)(4) shall be settled within three months from the date of its delivery, however the company shall cancel it if the owner of the property has demolished the deviant construction within the said period.
(g)A defect in a payment demand, or the failure to deliver a payment demand, shall not in themselves derogate from the obligation of the owner of the property to pay infrastructure fees to the company under these Rules.

Clarification regarding the Payment Demand§

15.
(a)A property owner who claims that an error has been made in a payment demand in one of the matters listed in subsection (c) may, within 30 days from the date on which the payment demand was delivered to the owner, apply to the company with a request to conduct a clarification in respect of the payment demand; a request for clarification shall be drawn up in accordance with the form set out in the Fifth Schedule.
(b)The submission of a request for clarification shall not postpone the due date for settlement of the payment demand as referred to in section 14, however the company may, at the request of the owner of the property, postpone the due date for settlement pending clarification of the request.
(c)The matters in respect of which a request for clarification may be submitted are as follows:
(1)the area subject to infrastructure fees;
(2)the identity of the person liable to pay infrastructure fees;
(3)the existence of a prior payment that under sections 11, 12(b) or 13 requires the cancellation of the charge or the reduction of the amount of the payment demand;
(4)a clerical error, an error in the description of a person or property, in a date, in a number or in a calculation, or another technical error in the payment demand.
(d)The company shall deliver to the applicant a written notice of the results of the clarification it has conducted within 60 days from the date of receipt of the request for clarification.

Refund of Overpayment§

16.

Where infrastructure fees have been paid and it becomes apparent that they included an overpayment as defined in section 35 of the Standards of Conduct Rules, the company shall refund the overpayment in accordance with section 35 of the Standards of Conduct Rules, and for this purpose a request for clarification and a request for restitution as referred to in sections 17(a) and 17(b) shall also be regarded as a consumer's notice as defined in section 35 of the Standards of Conduct Rules.

Refund of Payment due to Non-Performance of Construction§

17.
(a)Where a property owner has requested the company to refund to him the full infrastructure fees imposed on him pursuant to section 9(a)(1), and the period for issuing the permit pursuant to the permit application has ended and its extension was not requested or was requested and refused, or the permit issued pursuant thereto has expired and its renewal was not requested or was requested and refused, the company shall refund to him the amount paid together with linkage differentials at the rate of change of the Consumer Price Index last published before the date of the refund compared with the Index last published before the date of payment; if the refund is not made within 60 days from the day on which the property owner's request as aforesaid was received, the amount to be refunded shall be deemed an overpayment, and the provisions of section 16 shall apply, and for the purposes of section 35 of the Standards Rules the date on which the amount became an overpayment shall be deemed the date of the refund.
(b)Where a property owner has requested the company to refund to him part of the infrastructure fees imposed on him pursuant to section 9(a)(1), on the grounds that the construction on the property was on an area smaller than the area by which the amount he paid was calculated, the company shall refund to him an amount equal to the difference between the amount he paid and the amount he would have been required to pay had the permit application been for the area actually built, together with linkage differentials at the rate of change of the Consumer Price Index last published before the date of the refund compared with the Index last published before the date of payment, and if he paid in instalments — before the date of each instalment paid after settlement of the infrastructure fees amount he was required to pay as aforesaid; if the refund is not made within 60 days from the day on which the property owner's request as aforesaid was received, the said difference amount shall be deemed an overpayment, and the provisions of section 16 shall apply, and for the purposes of section 35 of the Standards Rules the date on which the amount became an overpayment shall be deemed the date of the refund.

Service of Payment Demand and Notices§

18.

Service of a payment demand and of the company's notices pursuant to this Chapter shall be effected by one of the means listed in section 147(a) of the Law.

Preservation of Rights and Powers§

19.

Nothing in the provisions of this Chapter shall prevent an approach to the Authority on the matter of a payment demand by way of filing a complaint pursuant to section 108 of the Law, or derogate from the right of the property owner to approach any competent tribunal on the matter of the payment demand.