Israeli Legislation.com

Gas (Safety and Licensing) Law, 5749-1989

חוק הגז (בטיחות ורישוי), תשמ"ט-1989

Published: 1989-09-29Consolidated Hebrew text as of 2026-08-23 · Last amended 2023-12-19✓ Amendment status checked against the Knesset legislation record on 2026-11-10
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

Chapter I: Interpretation

Definitions§

1.

In this Law –

"gas" – (Repealed)

"gas", "natural gas", "the Commissioner" and "the Director" – as defined in section 2 of the Natural Gas Sector Law;

"liquefied petroleum gas" – (Repealed)

"Natural Gas Sector Law" – the Natural Gas Sector Law, 5762-2002;

"Standards Law" – the Standards Law, 5713-1953;

"gas installation" – an installation or device used for the storage, measurement, consumption, accumulation or combustion of gas and for the emission of combustion gases, including structures, vessels, pipes and fittings used in the installation;

"natural gas installation for consumption" – as defined in section 8b;

"liquefied petroleum gas installation for self-consumption" – (Repealed)

"gas flow services provider" – a gas supplier of natural gas, or a person who has received a licence under Chapter II of the Natural Gas Sector Law;

"gas work" – planning, installation, inspection, operation, alteration, repair or dismantling of a gas installation, filling or transmission of gas, including supervision over the performance of such work;

"gas supplier" – a person whose business is the production, filling, storage or transmission of gas, except where such activity is carried out at a natural gas vehicle fuelling station solely for the purpose of fuelling vehicles at that station, and except a person whose business is the marketing of gas;

"the Minister" – the Minister of Energy.

Chapter II: Safety of Handling of Gas and Gas Installations

Safety Order§

2.

The Minister may regulate by Order the safety of the production, filling, storage, transmission or marketing of gas or of a gas installation, and also the consumption of gas, provided that it is not consumption for domestic use; the Minister may also regulate by Order the safety of the performance of gas work; an Order as aforesaid may be general, or may apply to types of gas, gas installations or gas works, or to a particular gas, a particular gas installation or a particular gas work.

3.§

(Repealed — תשפ״א)

Installation of a Gas Installation§

4.
(a)A person shall not install a gas installation or make a material alteration therein except under a written permit from the Director and in accordance with the conditions of the permit, except for a gas installation that is one of the following:
(1)(Repealed)
(2)a natural gas installation for consumption;
(3)a gas installation used for the consumption of natural gas for domestic use.
(b)The Director shall grant a permit under subsection (a) if satisfied that the installation or alteration plan is such as to ensure that the installation will be used in a manner that poses no risk to persons or property and that the safety conditions under any enactment have been fulfilled.
(c)Where a gas installation referred to in subsection (a) has been installed without a permit or otherwise than in accordance with the conditions of the permit, the Director may give an instruction to the holder of the gas installation to empty the installation of gas without delay and to prohibit its use for gas purposes; where the Director has given such an instruction, the emptying of gas from the installation shall be carried out by a person who holds a licence to engage in gas work of that type.
(d)The Minister may prescribe that an installation referred to in subsection (a)(3), in whole or in part, of types to be prescribed, shall be required to obtain a permit under this section, a conformity approval under section 8d, or such other safety approval as the Minister shall prescribe.

Cessation of Operation of a Gas Installation§

5.

The Commissioner may, if of the opinion that safety reasons relating to persons or property so require, order the cessation of use of a gas installation and give an instruction to empty the installation of gas without delay; the Commissioner may also make the continued use of the installation conditional upon the fulfilment of conditions to be prescribed.

6.§

(Repealed — תשפ״א)

Proper Maintenance of a Gas Installation§

7.

The owner or holder of a gas installation that has received a permit under section 4 shall maintain and operate the installation in a proper and safe manner.

Safety Plan§

8.
(a)The Commissioner may instruct the owner or holder of a gas installation referred to in section 4 to prepare a safety plan for the installation in accordance with guidelines and within the period to be prescribed; such an instruction may relate to a type of gas installation or to a particular gas installation.
(b)(Repealed)
8a.§

(Repealed — תשפ״א)

Chapter II-A: Natural Gas Installations for Consumption

Definitions and Interpretation – Chapter II-A§

8b.
(a)In this Chapter –

"conformity approval" – as defined in section 8d, and for the purposes of sections 8c, 8h, 8k and 8o – including a temporary conformity approval;

"temporary conformity approval" – as defined in section 8f, or an approval granted under section 8d(g), as the case may be;

"inspection body" – a body that has been accredited and approved under section 8i;

"National Laboratory Accreditation Authority Law" – the National Laboratory Accreditation Authority Law, 5757-1997;

"commencement date" – the 19th day of Kislev 5776 (1 December 2015);

"compressed natural gas discharge installation" – an installation for the reduction of pressure of compressed natural gas received from pressure vessels that form part of a commercial vehicle as defined in the Traffic Ordinance [New Version], at a pressure not exceeding 250 bar, including piping on the premises of the natural gas consumer that supplies natural gas solely to that consumer and connects the installation to the consumer's piping;

"Standards Institute" – the Standards Institution of Israel as defined in section 2 of the Standards Law;

"the Standards Commissioner" – the Standards Commissioner appointed under section 5 of the Standards Law;

"the Laboratory Accreditation Authority" – the Authority as defined in the National Laboratory Accreditation Authority Law;

"standard" – provisions concerning natural gas in an Israeli standard as defined in the Standards Law, listed in the First Schedule A, applicable to a natural gas installation for consumption.

(b)Subject to the provisions of subsection (c), a natural gas installation for consumption is any of the following:
(1)a gas installation used for the consumption of natural gas, including for the production of other substances from natural gas or for the production of thermal, electrical or mechanical energy;
(2)an installation used for the operation of a natural gas vehicle fuelling station;
(3)a compressed natural gas discharge installation;
(4)piping connecting installations referred to in paragraphs (1) and (2) to the gas installations of a gas flow services provider;
(5)fixed or movable structures, devices and fittings along the installations referred to in paragraphs (1) to (3), connected thereto.
(c)A natural gas installation for consumption is an installation in which all of the following conditions are met, and in respect of a compressed natural gas discharge installation – only the condition set out in paragraph (3):
(1)it is located on premises under the control of the holder of the installation;
(2)it is not operated by a gas flow services provider;
(3)it is not used for domestic use, storage, distribution or accumulation; for this purpose, "storage" – except where carried out at a natural gas vehicle fuelling station for the operational needs of that station.

Installation and Use of a Natural Gas Installation for Consumption§

8c.

A person shall not install a natural gas installation for consumption and shall not use natural gas therein, unless a conformity approval has been granted in respect thereof under this Chapter.

Conformity Approval for a Natural Gas Installation for Consumption§

8d.
(a)A person who wishes to operate a natural gas installation for consumption or to convert an installation for use as a natural gas installation for consumption shall apply to an inspection body for the purpose of obtaining a conformity approval of the installation in respect of its use with natural gas, or for the purpose of renewing the approval.
(b)The inspection body shall inspect the installation referred to in subsection (a) in accordance with the standard and with the provisions under section 8k; inspections for the renewal of a conformity approval shall be carried out having regard to the fact that a conformity approval was previously granted in respect of that installation.
(c)Where the inspection body has found that the installation referred to in subsection (a) complies with the provisions of the standard and with the provisions under section 8k, it shall grant a conformity approval in respect thereof.
(d)A conformity approval shall be granted for five years; the Minister may, by Order, alter the said period, including by prescribing different periods in respect of different types of natural gas installations for consumption; where a temporary conformity approval has been granted, its period of validity shall not be counted towards the period of the conformity approval under this subsection.
(e)An inspection body shall publish on its website a list of documents and actions required for the purpose of inspecting a natural gas installation for consumption, as prescribed in the provisions of the standard and in the provisions under section 8k.
(f)Where an inspection body has received an application referred to in subsection (a), it shall carry out at least one preliminary inspection of the installation and shall respond to the application by the date referred to in the Third Schedule, as the case may be, provided that the application included all documents and all actions required under subsection (e) were performed; the inspection body's response shall include the details of the requirements under the standard and under the provisions of section 8k for the completion of the inspection, to the extent that any such requirements exist.
(g)Without derogating from the provisions of section 8f, where an application for the renewal of a conformity approval has been submitted and the inspection body considers that it requires additional time to complete the inspection, it may grant an approval in respect of the installation for the period required to complete the inspection, provided that it has found that the use of natural gas in the installation does not constitute a danger to public safety and that the holder of the conformity approval submitted the application for renewal at least two months before the expiry of its validity; the inspection body may extend the validity of the approval under this subsection for additional periods, provided that the total period does not exceed eight months.
(h)Where the inspection body has found that the provisions of the standard or the provisions under section 8k are not fulfilled in respect of the installation, it shall notify the applicant, by reasoned written notice, that it is rejecting the application for the grant of a conformity approval.
(i)An inspection body shall notify the gas flow services provider whose installations are connected or are to be connected to an installation inspected by the inspection body of the grant of a conformity approval, its renewal and the end of the approval period, including the grant of an approval under subsection (g) and the extension of its validity.

Suspension of a Conformity Approval, its Cancellation or Refusal to Renew It§

8e.
(a)Where an inspection body has found that the provisions of the standard or the provisions under section 8k are not fulfilled in respect of a natural gas installation for consumption in relation to which a conformity approval exists, it may suspend the approval until conditions it shall prescribe have been fulfilled, cancel it or refuse to renew it, provided that it affords the holder of the conformity approval an opportunity to present arguments in the matter no later than 30 days from the date on which the decision was delivered to that holder.
(b)The inspection body shall deliver, immediately, to the holder of the conformity approval, to the gas flow services provider whose installations are connected to the installation and to the Laboratory Accreditation Authority, a reasoned written notice of its decision under subsection (a).

Temporary Conformity Approval§

8f.
(a)Notwithstanding the provisions of section 8d(c) and (h), an inspection body may grant a temporary conformity approval to a person who has submitted an application for the renewal of a conformity approval, even if that person does not comply with the provisions of the standard or with the provisions under section 8k, provided that the inspection body has found that the use of natural gas in the installation does not constitute a danger to public safety.
(b)A temporary conformity approval shall be granted for a period to be determined by the inspection body, having regard to the deficiencies it has found; the inspection body may extend the said period for additional periods, provided that the total period under this subsection does not exceed four months.
(c)Where a temporary conformity approval has been granted or its validity extended, the inspection body shall immediately deliver notice thereof to the gas flow services provider whose installations are connected to the installation in respect of which the temporary conformity approval was granted.
(d)For the purposes of this section, an application for the renewal of a conformity approval may be submitted during the period of validity of the approval or within one year from the date of its expiry.

Proper and Safe Maintenance of a Natural Gas Installation for Consumption§

8g.

The owner and the holder of a natural gas installation for consumption shall maintain and operate the installation in a proper and safe manner.

Prohibition on Supply of Natural Gas to an Installation Without a Conformity Approval§

8h.
(a)A person shall not flow natural gas for the first time into a natural gas installation for consumption in respect of which there is no valid conformity approval, except in the framework of a preliminary inspection that includes the flowing of gas in accordance with the provisions of the standard or with the provisions under section 8k.
(b)A gas flow services provider who has received written notice from an inspection body under the provisions of this Chapter to the effect that the conformity approval in respect of an installation into which it is flowing natural gas is not valid, or who has received such notice of the end of the approval period, shall, within three days of receipt of the notice, cease the flowing of natural gas into the relevant installation, and shall not resume the flowing thereof unless it has received notice from an inspection body of the grant or renewal of a conformity approval in respect of that installation.

Accreditation of Inspection Bodies§

8i.
(a)Inspections carried out by an inspection body under this Chapter shall be deemed to have been prescribed under section 5(1) of the National Laboratory Accreditation Authority Law as inspections in respect of which the Laboratory Accreditation Authority shall grant accreditation as referred to in subsection (b).
(b)The Laboratory Accreditation Authority shall accredit bodies to inspect natural gas installations for consumption, to grant conformity approvals and temporary conformity approvals, to renew conformity approvals and to approve engineering specifications under the Planning and Building Law, 5725-1965, in relation to natural gas installations for consumption, in accordance with the provisions of the standard and with the provisions under section 8k, and also in accordance with the procedures, rules, criteria and international standards applicable to the activities of the Laboratory Accreditation Authority, as defined in section 10 of the National Laboratory Accreditation Authority Law.
(c)The provisions under the National Laboratory Accreditation Authority Law shall apply to the accreditation of bodies referred to in subsection (b), with the necessary modifications.
(c1)The Laboratory Accreditation Authority shall deliver its decision in respect of the accreditation of a body referred to in subsection (b) within five months of the date on which all documents required for the purpose of obtaining accreditation in accordance with the provisions under this section were submitted to it.
(d)A body accredited by the Laboratory Accreditation Authority under subsection (b) shall not serve as an inspection body under this Chapter unless it has been approved for that purpose by the Standards Commissioner under section 12 of the Standards Law; a body so accredited shall be deemed to satisfy the conditions under section 12 of the Standards Law in respect of professional ability and competence, for the purpose of the Standards Commissioner's approval; the Standards Commissioner may commence proceedings for the grant of such approval even before the accreditation of the body.
(e)The Standards Commissioner shall deliver his decision in respect of the grant of approval referred to in subsection (d) within 30 days of the later of the following dates:
(1)the date on which all documents required for the purpose of obtaining accreditation were submitted to the Laboratory Accreditation Authority;
(2)the date on which all documents required under section 12 of the Standards Law for the purpose of granting the approval were submitted to him, in accordance with the list published on the website of the Ministry of Economy.
(f)The Laboratory Accreditation Authority shall exercise oversight over the activities of inspection bodies it has accredited, with respect to their compliance with the conditions of their accreditation, including by carrying out sample inspections with regard to the manner in which they perform their functions.
(g)Notwithstanding the provisions of this section, the Standards Institute shall be deemed, for the purposes of this Chapter, to be an inspection body, provided that, in respect of provisions prescribed under section 8k concerning inspections and their performance, it shall be accredited by the Laboratory Accreditation Authority as an inspection body; and the powers under subsections (a), (b), (c) and (f) shall vest in the Laboratory Accreditation Authority in relation to the Standards Institute, with respect to those provisions only.
8j.§

(Repealed — תשפ״ד)

Prescription of Provisions on Matters Not Prescribed in the Standard§

8k.
(a)Where the standard does not contain provisions on the matters listed below, the Minister shall prescribe provisions on those matters, in consultation with the Minister of Economy:
(1)the types of inspections to be carried out for the purpose of granting approvals under this Chapter;
(2)documents that the holder of a conformity approval is required to retain, including documentation of inspections to be carried out by that holder under any law; in Regulations under this paragraph the Minister may also prescribe periods for the retention of such documents.
(b)The Minister, in consultation with the Minister of Economy, may prescribe additional provisions to those prescribed under the National Laboratory Accreditation Authority Law, in respect of the conditions for the accreditation of inspection bodies, the period of validity of the accreditation and conditions for its cancellation.
(c)Where the position of the Minister of Economy has not been communicated in respect of the prescription of provisions under this section within 21 days of the date on which the Minister addressed him in the matter, the obligation to consult with him under this section shall be deemed, upon the expiry of that period, to have been fulfilled.

Amendment of the First Schedule A and the Third Schedule§

8l.
(a)The Minister, in consultation with the Minister of Economy, may, by Order, amend the First Schedule A; where the position of the Minister of Economy has not been communicated within 21 days of the date on which the Minister addressed him in the matter, the obligation to consult with him shall be deemed, upon the expiry of that period, to have been fulfilled.
(b)The Minister may, by Order, amend the Third Schedule.

Non-Application of Provisions to Natural Gas Installations for Consumption§

8m.

The provisions of sections 5 and 22 to 24 shall not apply in respect of natural gas installations for consumption.

Limitation on Application – Chapter II-A§

8n.

The provisions of this Chapter shall not apply to a natural gas installation for consumption into which natural gas was flowed before the commencement date by a holder of a licence under section 102 of the Natural Gas Sector Law.

Transitional provisions – Chapter II-A§

8o.
(a)Notwithstanding the provisions of sections 8c, 8d and 8h –
(1)A natural gas installation for consumption, other than an installation for the discharge of compressed natural gas, to which natural gas was flowed on the eve of the commencement date, or in respect of which approval to flow natural gas was given before the commencement date but natural gas had not yet been flowed to it (in this section – existing installation), is not required to hold a conformity approval in order to use it and to flow natural gas to it, until its first inspection pursuant to the provisions of paragraph (2); in this section, "approval to flow natural gas" – written approval given by the Commissioner or a person acting on the Commissioner's behalf, or by the Standards Institute, provided that all approvals for all parts of the installation to which natural gas is to be flowed have been given;
(2)An inspection body shall inspect an existing installation for the purpose of granting a conformity approval, in accordance with the provisions of the standard dealing with the assessment of the safety of existing installations and taking into account the approvals to flow natural gas previously given in respect of that installation; the first inspection of an existing installation as aforesaid shall be carried out during the following periods, as the case may be:
(a)in the matter of an existing installation that received an approval to flow natural gas from the Natural Gas Authority only, and the approval was in force on the eve of the commencement date – until the 12th of Tishrei 5781 (30 September 2020);
(b)in the matter of an existing installation that received approvals to flow natural gas from the Natural Gas Authority and from the Standards Institute, and the approvals were in force on the eve of the commencement date – until the end of five years from the date of the determination of the standard in the matter of the installation, provided that if the approval given by the Standards Institute was subject to conditions, the Standards Institute approved the fulfilment of the conditions before the conditional approval it gave expired.
(b)(Repealed)
(c)Notwithstanding the provisions of section 8i, in the matter of installations as referred to in subsection (d), the following provisions shall apply during the periods referred to in that subsection:
(1)The Standards Institute shall serve as an inspection body; however, at the request of the approval applicant, an entity that commenced the inspection of a natural gas installation for consumption before the 13th of Cheshvan 5776 (26 October 2015) for the purpose of granting approval to flow gas to the installation shall complete the inspection procedure in respect of that part of the installation whose inspection it commenced; nothing in the provisions of this paragraph shall derogate from the obligation to obtain approval from the Standards Institute in respect of the other parts of the installation;
(2)The Minister, in consultation with the Director General of the National Laboratory Accreditation Authority, shall authorise a body operating in a developed state with significant markets and accredited under the law applicable in that state, to serve as an inspection body for the purposes of this Chapter, provided that the Minister is of the opinion that that body is competent to carry out inspections of natural gas installations for consumption in accordance with the requirements listed in the Fourth Schedule; an authorisation under this paragraph in respect of a natural gas installation for consumption that is not an installation for the discharge of compressed natural gas shall be granted until the 3rd of Tevet 5777 (1 January 2017), and in respect of an installation for the discharge of compressed natural gas – until the 3rd of Adar 5777 (1 March 2017); the decision to grant such authorisation and an updated list of the bodies that have been authorised shall be published on the website of the Ministry of National Infrastructures, Energy and Water;
(3)The entities listed in paragraph (1) and an inspection body granted an authorisation pursuant to the provisions of paragraph (2) shall carry out inspections of a natural gas installation for consumption in accordance with the requirements listed in the Fourth Schedule, mutatis mutandis, and shall grant a conformity approval to the installation if the requirements as aforesaid are fulfilled in respect of it, and approval has been given in respect of it by the National Fire and Rescue Authority; the entities listed in paragraph (1) and an inspection body as referred to in the first part of this paragraph may grant a temporary conformity approval under this paragraph even if the circumstances referred to in section 8f(a) do not exist;
(4)An approval as referred to in paragraphs (1) and (3), other than a temporary conformity approval, shall be granted for a period of five years or for a period determined by the Minister pursuant to section 8d.
(5)An authorisation granted by the Minister to an inspection body pursuant to paragraph (2) (in this subsection – the Minister's authorisation) shall remain in force until the 5th of Shvat 5777 (1 February 2017), unless an earlier date is specified therein; however, a body to which the Minister's authorisation was granted and that submitted an application for accreditation pursuant to section 8i(b), and by the 5th of Iyar 5777 (1 February 2017) received approval from the National Laboratory Accreditation Authority that it had submitted all the documents required for accreditation pursuant to that section, the Minister's authorisation in respect of it shall remain in force until the 10th of Elul 5777 (1 September 2017), unless an earlier date is specified in that authorisation;
(6)Notwithstanding the provisions of paragraph (5), an authorisation granted by the Minister to an inspection body pursuant to paragraph (2) in the matter of an installation for the discharge of compressed natural gas shall remain in force until the end of three months from the date of the determination of the standard in the matter of such an installation, in accordance with an Order pursuant to subsection (d)(2); however, a body to which the Minister's authorisation was granted and that submitted an application for accreditation pursuant to section 8i(b), and within the said three months received approval from the National Laboratory Accreditation Authority that it had submitted all the documents required for accreditation pursuant to that section, the Minister's authorisation in respect of it shall remain in force until the end of eight months from the date of the determination of the standard in the matter of such an installation in accordance with an Order pursuant to subsection (d)(2), unless an earlier date is specified in that authorisation.
(d)The provisions of subsection (c) shall apply during the following periods:
(1)(Repealed)
(2)In the matter of an installation for the discharge of compressed natural gas – during the period from the 21st of Adar I 5776 (1 March 2016) until the end of eight months from the date of the determination of the standard in the matter of such an installation; the Minister shall give notice, by Order, of the determination of the standard and of the conclusion of the period pursuant to this paragraph; notwithstanding the provisions of section 30, such an Order does not require the approval of the Economics Committee of the Knesset;
(3)In the matter of a natural gas installation for consumption that is not an installation as referred to in paragraph (2) – during the period from the commencement date until the 10th of Elul 5777 (1 September 2017).
(d1)Notwithstanding the provisions of subsection (c), where an entity from among the entities listed in paragraph (1) of that subsection, or an inspection body granted an authorisation pursuant to the provisions of paragraph (2) of that subsection, commenced the inspection of a natural gas installation for consumption during the period referred to in subsection (d)(2) or (3), as the case may be, and the said authorisation was in force at the time the inspection commenced, the following provisions shall apply:
(1)The entity that commenced the inspection shall be entitled, at the request of the approval applicant, to complete the inspection procedure in respect of that installation, in accordance with the provisions of subsection (c)(3) and (4), even after the end of the period prescribed in subsection (d) in respect of that installation, provided that that entity received from the approval applicant all the documents necessary for granting the approval, conducted at least one preliminary inspection at the installation and replied to the approach of the approval applicant with a detailed statement of the requirements under the Fourth Schedule, before the end of the period during which it was entitled to grant a conformity approval in accordance with the provisions of subsection (c);
(2)A conformity approval for the installation pursuant to the provisions of this subsection may be granted no later than the end of six months from the end of the period prescribed in subsection (d) in respect of that installation; in this paragraph, "conformity approval" – other than a temporary conformity approval.
(e)The Minister, in consultation with the Minister of Economy, may, by Order, amend the Fourth Schedule; if the position of the Minister of Economy was not communicated within 21 days from the day on which the Minister approached the Minister of Economy in the matter, upon the expiry of that period the consultation obligation with the Minister of Economy shall be deemed to have been fulfilled; the Minister shall not make such an Order unless the Minister has given distribution licence holders and transmission licence holders under the Natural Gas Sector Law, entities engaged in the marketing of natural gas, the Manufacturers' Association, the National Laboratory Accreditation Authority and the Standards Institute an opportunity to state their position.
(f)
(1)From the end of the period listed in subsection (d)(2), and for so long as no standard has been determined in the matter of an installation for the discharge of compressed natural gas, an inspection body shall inspect such an installation for the purpose of granting a conformity approval in respect of it, in accordance with the requirements listed in item 1(b) of the Fourth Schedule;
(2)Without derogating from the provisions of subsection (e), if five years have elapsed from the commencement date and no standard as referred to in paragraph (1) has been determined, and item 1(b) of the Fourth Schedule has not been amended, the Commissioner shall examine the need to update the requirements as aforesaid in order to adapt them to advances in technology and science and to developments in the economy, and shall transmit the Commissioner's recommendations on the matter to the Minister, who shall examine the need to amend the Fourth Schedule in accordance with those recommendations; however, the absence of a decision by the Minister pursuant to this paragraph shall not derogate from the validity of those requirements.

Page 1 of 3

Read the entire law on one page — continuous text, no page breaks, plus formal citations.

LawAdministrative Law

חוק הגז (בטיחות ורישוי), תשמ"ט-1989

Gas Safety Law

Gas Licensing Law

Safety and Licensing Law gas

Chok HaGaz

Gas Law 1989

Gas Safety Licensing

Gas regulation Israel

Gas industry law

LPG safety law

Natural gas licensing