Abatement of Nuisances (Prevention of Air Pollution and Noise from a Quarry) Regulations, 5758-1998

תקנות למניעת מפגעים (מניעת זיהום אוויר ורעש ממחצבה), תשנ"ח-1998

Published: 1998-08-20Consolidated Hebrew text as of 2026-07-19 · Last amended 2020-05-21
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

By virtue of my authority under Sections 5, 7 and 18 of the Abatement of Nuisances Law, 5721-1961 (hereinafter – the Law), and with the approval of the Interior and Environmental Quality Committee of the Knesset pursuant to Section 48(a) of Basic Law: The Government, and Section 2(b) of the Penal Law, 5737-1977, I hereby make the following Regulations:

Definitions§

1.

In these Regulations –

"dust" – a substance composed of minute particles, carried or capable of being carried in air or gas, including in the form of smoke, soot or spray;

"suspended dust" – dust whose particle diameter is less than 30 microns;

"settleable dust" – dust that is not suspended dust;

"dry air" – air free of water vapour;

"forced ventilation" – an installation for the mechanical extraction of air from a structure by means of a fan;

"residential area" – an area designated in a plan under the Planning and Building Law, 5725-1965 (hereinafter – the Planning and Building Law), as a residential area or as an area intended for residential use, as well as an area that in fact serves as a residential area;

"sensitive area" – an area serving or intended to serve as an area for residential use, public buildings, tourism or recreation, including 1,000 metres from the building line as defined in the Planning and Building Regulations (Application for a Permit, its Conditions and Fees), 5730-1970, at the edge of such an area;

"background examination" – monitoring in an area representative of the air conditions therein without the influence of the quarry in that area;

"sampling" – the taking of a sample of gas emitted from a stack, its examination and the separate recording of its composition;

"the Director" – a person authorised by the Minister for Environmental Quality for the purposes of these Regulations, in whole or in part;

"mineral material" – a substance originating from quarrying, including stones, gravel and quarry sand types, and any material produced in a quarry and marketed therefrom;

"fine mineral material" – mineral material other than stones and gravel;

"quarry" – as defined in the Work Safety Ordinance [New Version], 5730-1970;

"quarry installation" or "installation" – an installation in a quarry used in the production process, including an asphalt production installation, a concrete production installation, a crushing installation for breaking and crushing stones to produce gravel and mineral material of various sizes, a mineral material loading installation onto vehicles and wagons, a screening installation for sorting mineral material and an installation for its conveyance and unloading, and including a mobile crushing installation for mineral material not located in a quarry;

"new installation" – an installation that did not exist on the date of publication of these Regulations;

"existing installation" – an installation that existed on the date of publication of these Regulations;

"quarry operator" – the owner, possessor or person who supervises the operation of a quarry or quarry installation;

"truck operator" – the owner, possessor or driver of a truck;

"spraying and fogging equipment" – equipment for spraying water and creating fog for the purpose of settling dust in a quarry, comprising a high-pressure water supply system and water spray nozzles;

"suction and collection equipment" – equipment for the suction and collection of dust emitted from non-point dust emission sources;

"filtration equipment" – a filter, settler, cyclone or other device serving or intended to serve for the capture and filtration of dust emitted from a stack or a forced ventilation opening in a quarry installation;

"standard conditions" – a temperature of 20 degrees Celsius and a pressure of 101.3 kilopascals;

"performance standards" – the performance standards for stationary sources of the United States Environment Protection Agency (USEPA), kept for public inspection at the Air Quality Division of the Ministry for Environmental Quality and at the district offices of the Ministry, during the Ministry's normal working hours.

Unreasonable Air Pollution from a Quarry§

2.

Unreasonable pollution of the air from a quarry is any of the following:

(1)emission of dust from stacks and forced ventilation openings in a quarry in a sensitive area, or from a new installation, in a quantity exceeding 50 milligrams per cubic metre of dry air under standard conditions;
(2)emission of dust from stacks and forced ventilation openings in a quarry from an existing installation in a non-sensitive area in a quantity exceeding 100 milligrams per cubic metre of dry air under standard conditions;
(3)settleable dust originating from a quarry, in a quantity exceeding, at the quarry boundary, 20 tonnes per square kilometre per month;
(4)suspended dust originating from a quarry, in a quantity exceeding, at the quarry boundary, 0.3 milligrams per cubic metre in a measurement lasting three consecutive hours, or 0.2 milligrams per cubic metre in a measurement lasting 24 consecutive hours.

Taking of Measures§

3.
(a)A quarry operator shall operate and maintain the quarry in a manner that prevents unreasonable air pollution and shall take the measures specified in these Regulations for the prevention of unreasonable air pollution.
(b)Where a malfunction has occurred in dust prevention or settling equipment, or where another malfunction in a quarry installation causes air pollution, the quarry operator shall take all measures available to rectify the malfunction as quickly as possible, and until the required repair is completed – shall reduce dust emissions into the air to the greatest extent possible.
(c)A period of malfunction in a quarry installation shall not be regarded as a breach of this regulation, provided that the total aggregate of malfunctions in the installation does not exceed two per cent of its operating time over 12 consecutive months, and the duration of a single malfunction event does not exceed 15 consecutive hours, provided that the malfunction is severe and material.

Taking of Measures in a Sensitive Area§

4.

Notwithstanding the provisions of regulation 3, a quarry operator shall immediately cease operation of an installation in a sensitive area in which a dust prevention or dust settling system that was installed therein is not functioning properly and which causes severe or unreasonable air pollution, and shall resume its operation only after ensuring that measures have been taken to prevent the causing of unreasonable air pollution.

Internal Roads§

5.

A quarry operator shall take measures to prevent and reduce unreasonable air pollution caused by vehicle movement on internal roads in the quarry, including the following measures:

(1)paving road sections that are capable of being paved and cleaning paved roads in the quarry to prevent the accumulation and dispersal of dust;
(2)wetting the internal unpaved roads of the quarry, in a manner and at a frequency that will prevent the dispersal of dust;
(3)wetting the roads between the quarry installations and between them and the quarrying areas with a ground-stabilising substance at least once a year, at the end of the rainy season;
(4)prohibiting driving within the quarry at a speed liable to cause dust to rise and disperse, and erecting signage within the quarry in respect thereof.

Quarry Installations§

6.
(a)A quarry operator shall take the following measures:
(1)install and operate spraying and fogging equipment connected to a computerised control system, beside or on every quarry installation or pile of mineral material that is a non-point source of dust emission;
(2)ensure that the tipping of mineral material for the purposes of loading, conveyance or storage is carried out adjacent to the pile of material being tipped, in a manner that prevents the dispersal of dust; conveyors whose height is not adjustable shall be fitted with sleeves.
(b)A quarry operator in a sensitive area shall take, in addition to the measures detailed in sub-regulation (a), the following measures as well:
(1)take all measures to prevent the dispersal of dust from quarry sand piles, whether by settling or covering the piles so that they are protected from wind, or by creating a sealing layer on the pile by wetting it;
(2)ensure that the conveyance installations for fine mineral material are covered and protected from wind on all sides, or that spraying and fogging equipment is installed and operated in them;
(3)a closed and sealed screen equipped with suction and collection equipment or with spraying and fogging equipment shall be installed and operated in the screening installations for fine mineral material;
(4)the crushing installations for fine mineral material shall be located in a structure enclosed on all sides, equipped with suction and collection equipment or with spraying and fogging equipment;
(5)drilling machines operated in the quarry shall be equipped with suction and collection equipment or with spraying and fogging equipment;
(6)loading of sand shall be carried out in a place and in a manner that prevents the dispersal of dust in accordance with the provisions of paragraph (1);
(7)dust collected in the suction and collection equipment and in the filtration equipment shall be removed and transported to a construction waste disposal site authorised under any law, or shall be put to further use within the quarry.

Plan for the Shutdown of the Quarry§

7.

A quarry operator in a sensitive area shall prepare and submit to the Director a plan for the shutdown of the quarry during the existence of severe meteorological conditions causing the transport of quarry dust to residential areas adjacent to the quarry, and shall act in accordance with the plan when the need arises.

Unreasonable Noise and Ground Vibrations§

8.
(a)A quarry operator shall take steps to prevent unreasonable noise resulting from quarry operations, including operational and technological steps required so that the quarry and its installations do not cause unreasonable noise within the meaning of the Abatement of Nuisances (Unreasonable Noise) Regulations, 5750-1990.
(b)A quarry operator shall take steps to prevent ground vibrations resulting from blasting therein that cause nuisances, including the operational and technological steps necessary so that one or more of the values detailed in each of the following paragraphs are maintained:
(1)the maximum velocity of ground particle movement in a measurement conducted adjacent to the residential building or public building nearest to the blast site shall not exceed the following values:
(a)32 mm per second – where the measurement distance from the blast site is up to 90 metres;
(b)25 mm per second – where the measurement distance from the blast site is between 90 and 1,500 metres;
(c)19 mm per second – where the measurement distance from the blast site exceeds 1,500 metres;
(2)blasting in a quarry shall be carried out such that the product of the square of the distance in metres of the blast site from the measurement point multiplied by the constant K is equal to or greater than the quantity of explosive in kilograms per delay. K shall be calculated such that in 95% of cases the values of ground particle movements meet one or more of the values set out in paragraph (1), or:
(a)where the measurement distance from the blast site is up to 90 metres K = 0.002;
(b)where the measurement distance from the blast site is between 90 and 1,500 metres K = 0.0016;
(c)where the measurement distance from the blast site is greater than 1,500 metres K = 0.0012;
(3)the maximum velocity of ground particle movement in a measurement conducted adjacent to the residential building or public building nearest to the blast site shall not exceed the following values:
(a)19 millimetres per second – at a vibration frequency of 4HZ–11HZ;
(b)between 19 millimetres per second and 51 millimetres per second – at a vibration frequency of 11HZ–30HZ;
(c)51 millimetres per second – at a vibration frequency above 30HZ.

Conveyance of Quarry Material§

9.
(a)A truck operator shall not convey outside the boundaries of a quarry a truck loaded with mineral material unless the truck is covered in a manner that prevents the dispersal of dust.
(b)A quarry operator shall install and operate in the quarry an installation for wetting the material carried in trucks transporting mineral material.
(c)A truck operator leaving the quarry area when the truck is empty shall, before leaving the quarry, wash out the cargo box.

Maintenance and Operation§

10.
(a)The equipment and installations specified in these Regulations, including measuring instruments, shall be maintained in proper working condition at all times so as to ensure their proper functioning.
(b)Subject to the provisions of regulations 3 and 4, quarry installations shall be operated only when the operation of the spraying and fogging equipment, filtration equipment and suction and collection equipment installed therein is functioning properly.

Sampling§

11.
(a)A quarry operator shall carry out, once a year or in accordance with the Director's instructions, samplings to determine the concentration of dust emitted from stacks and forced ventilation openings; the samplings shall be carried out by a professional body, under typical operating conditions, and shall be performed using Method 5 in Appendix A of the performance standards or an equivalent method permitted by the Director.
(b)A quarry operator shall ensure that the preparations and arrangements necessary for the proper performance of the samplings are made.

Wind Gauge§

12.

In a sensitive area, and in a non-sensitive area – pursuant to a special instruction of the Director, the quarry operator shall install a wind gauge with continuous recording connected to a computerised control system for measuring wind speed and direction.

Monitoring§

13.
(a)A quarry operator in a sensitive area shall prepare and submit for the Director's approval a plan for monitoring settleable dust and suspended dust in areas adjacent to the quarry where dust from the quarry disperses, comprising:
(1)a plan for positioning buckets for monitoring settleable dust;
(2)a plan for positioning instruments for monitoring suspended dust that will be activated automatically when the wind direction is from the quarry towards them;
(3)a plan for positioning instruments for monitoring suspended dust that will be activated once a week for 3 consecutive hours, and instruments as aforesaid that will be activated once a week for 24 consecutive hours, or at another frequency with the Director's agreement.
(b)The determination of the location of the monitoring instruments referred to in sub-regulation (a)(2) and (3) shall be made taking into account the wind regime in the areas where dust from the quarry disperses and in adjacent areas suitable for background examinations, in a manner that ensures that the operation of the monitoring instruments will yield results reflecting the dispersal of dust originating from the quarry.
(c)A quarry operator shall install the instruments for monitoring settleable dust and suspended dust in accordance with the plan referred to in sub-regulation (a); the installation shall be carried out in accordance with the best professional knowledge and the instruments shall be calibrated and of a capacity that enables monitoring of suspended dust particles.

Records§

14.
(a)A quarry operator shall maintain full and orderly records of –
(1)the dates on which malfunctions occurred in air pollution prevention equipment in installations in the quarry;
(2)the results of dust concentration sampling from stacks and forced ventilation openings pursuant to regulation 11(a);
(3)the results of ground vibration measurements pursuant to regulation 8(b).
(b)In addition to the provisions of sub-regulation (a), a quarry operator in a sensitive area shall also maintain full and orderly records of –
(1)the dates of shutdown of an installation in a quarry in a sensitive area, in every case of a malfunction in dust prevention or dust settlement equipment;
(2)the results of settleable dust monitoring;
(3)the results of suspended dust monitoring;
(4)wind speed and direction data;
(5)the dates on which the quarry was shut down due to winds that carried dust from the quarry towards residential areas.
(c)The records shall be kept at the offices of the quarry operator for three years and shall be available for inspection by the Director during normal working hours; a copy thereof shall be provided to the Director upon the Director's request.

Contact Person§

15.

A quarry operator shall appoint a person on his behalf to serve as the contact person between him and the Director for the purpose of complying with the provisions of these Regulations.

Exemption§

16.

The Director may, upon request, exempt a quarry operator from fogging, spraying and wetting if the quarry is not connected to the water supply network, and may direct that alternative measures be taken to prevent the dispersal of dust from installations and roads in the quarry.

Savings Provisions§

17.

The provisions of these Regulations are in addition to any law relating to the planning and construction of a quarry, the abatement of nuisances and the preservation of environmental quality, including individual instructions pursuant to Section 8 of the Law, and shall not derogate therefrom.

Penalties§

18.

A person who contravenes a provision of these Regulations is liable to a fine as provided in Section 11 of the Law.

Commencement§

19.
(a)These Regulations shall come into force, with respect to a new installation, 30 days from the date of their publication.
(b)These Regulations shall come into force, with respect to an existing installation, six months from the date of their publication.
(c)Notwithstanding the provisions of sub-regulation (b), regulations 6(b), 7 and 13 shall come into force with respect to an existing installation three years from the date of publication of these Regulations.

Read the entire law on one page — continuous text, no page breaks, plus formal citations.

RegulationsHealthEnvironmentCriminal Law

תקנות למניעת מפגעים (מניעת זיהום אוויר ורעש ממחצבה), תשנ"ח-1998

Quarry Nuisance Abatement Regulations

Quarry Air Pollution Regulations

Quarry Noise Regulations

Air Pollution Quarry Regulations

Quarry Environmental Nuisance Law

Quarry Emissions Regulations

Mining Quarry Pollution Regulations

Quarry Dust and Noise Law