Water Measurement Regulations (Measurement of Water in Open Conduits), 5718-1958
תקנות מדידת מים (מדידת מים במובילים פתוחים), תשי"ח-1958
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More
This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.
Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.
The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.
This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.
By virtue of my authority under Section 13 of the Water Measurement Law, 5715-1955, I make these Regulations:
Definitions§
In these Regulations –
"open conduit" – a water conduit that has been installed or is intended for the flow of water with the surface of the water in contact with the air;
"measurement installation" – an installation serving for the measurement of water flowing in an open conduit, whether it totals the quantities of water conveyed through it or not;
"owner of a measurement installation" – a person who extracts or supplies water by means of an open conduit, or a person who holds control or supervision over a measurement installation and is obliged to measure the water pursuant to Section 4 or 6 of the Law, or pursuant to a by-law made under Section 99 of the Municipalities Ordinance, 1934, or Section 9 of the Local Councils Ordinance, 1941;
"specification" – (Repealed)
Installation of a Measurement Installation§
Installation Plan§
Commissioner's Approval§
Existing Measurement Installations§
Modification of an Existing Measurement Installation§
The Commissioner may require a modification in the form of installation of a measurement installation that was installed before the date of publication.
Price of a Measurement Installation§
Appeal§
Maintenance of the Measurement Installation§
The owner of a measurement installation is obliged to keep a measurement installation installed by him in proper working order, to repair it and to replace it when necessary, and also to submit it for inspection at least once a year, provided that the first inspection of the measurement installation shall be carried out no later than one year from the date of publication; the Commissioner may exempt the owner of a measurement installation from the obligation to submit the measurement installation for inspection in accordance with this regulation.
Inspection of a Measurement Installation§
Conduct of the Inspection§
Payment for an Inspection§
An authorised inspector shall not demand for the inspection of a measurement installation and for the services connected therewith a payment exceeding the payment fixed by the Minister of Agriculture by notice to be published in Reshumot (Official Gazette).
Refusal to Inspect§
An authorised inspector shall not refuse to inspect a measurement installation, unless he has a reason acceptable to the Commissioner.
Inspection Certificate§
An authorised inspector shall issue a certificate of the results of the inspection of the measurement installation carried out by him in accordance with the form prescribed in the Schedule.
Duties of an Authorised Inspector§
An authorised inspector shall permit the Commissioner or a person authorised by him to inspect his installations and to supervise the manner in which the inspection of a measurement installation is conducted, and shall also show, at the request of the Commissioner, his lists, certificates and other documents connected with the conduct of the inspection.
Registration of Water Quantities§
Registration of Inspection Results§
Copy of Records§
The Commissioner may require that a copy of all the records and lists that are to be compiled under these Regulations be furnished to him.
Address for Service of Documents§
Plans, notices and particulars that are to be submitted under these Regulations shall be addressed to the Water Measurement Division of the Water Commissioner's Office, Jerusalem, P.O.B. 1475.
Name§
These Regulations shall be called "Water Measurement Regulations (Measurement of Water in Open Conduits), 5718-1958".
Schedule: No. ____________ (regulation 14)
______________ (name of the authorised inspector) ____________ (address)
On ___________ (date of inspection) I inspected the measurement installation ___________ (type and size of the installation) which was installed on __________ (date of installation) in accordance with plan number _________ at the location _______ (reference point) submitted for inspection by ___________ (name of the owner of the measurement installation)
The results of the inspection are:
Schedule: Inspection Certificate for a Measurement Installation in Open Conduits
Flow rate ________ cu.m/hr = deviation ________ %
Flow rate ________ cu.m/hr = deviation ________ %
Flow rate ________ cu.m/hr = deviation ________ %
Flow rate ________ cu.m/hr = deviation ________ %
Flow rate ________ cu.m/hr = deviation ________ %
Flow rate ________ cu.m/hr = deviation ________ %
Notes ___________
| [Form — see source] |
|---|
Schedule: Particulars of the course of the inspection are attached to this certificate.
Made under
Other regulations under the Water Measurement Law
תקנות מדידת מים (מדידת מים במובילים פתוחים), תשי"ח-1958
Water Measurement Regulations 1958
Water Measurement Regulations Open Conduits
Takkanot Midiat Mayim 1958
open conduits water measurement
water gauging regulations
water measurement open channels
water metering regulations Israel
hydrological measurement law
water flow measurement regulations