Israeli Legislation.com

Sale (Apartments) Law, 5733-1973

חוק המכר (דירות), תשל"ג-1973

Published: 1973-07-20Consolidated Hebrew text as of 2023-09-18 · Last amended 2023-02-09✓ Amendment status checked against the Knesset legislation record on 2026-11-03
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

Schedule (Section 4)

(1)a defect in joinery and carpentry products, including aluminium and plastic – two years;
(2)a defect in interior flooring and cladding, including subsidence and wear – two years;
(3)failure in the functioning and durability of machinery and boilers – three years;
(4)a defect in yard development, including subsidence, inter alia of paving stones on the ground floor, in car parks, pavements and pathways within the building area, and also defects in surfaces made of various finishing materials – three years; for this purpose, "yard development" – including pathways, surfaces, walls, fences, built-in components and systems, including water, sewage, drainage, electricity, lighting and communications systems;
(5)failure in the functioning and durability of thermal insulation system components – three years;
(6)failure in piping systems, including water, heating system and gutters, effluent and sewage – four years; for this purpose, "failure" – including leaks;
(7)failure in the waterproofing of the structure, including in underground voids, walls, ceilings and roofs, including lightweight roofs with shading – four years;
(8)cracks wider than 1.5 mm in non-load-bearing components – five years;
(9)detachment, peeling or crumbling of exterior cladding – seven years;
(10)any other non-conformity that is not a fundamental non-conformity – one year.

In this Schedule –

"failure" – complete or partial failure in the functioning of the product or system;

"defect" – a defect in the functioning and durability of the product or system, including failure to maintain stability, integrity, quality and appearance, both of each individual component and of the whole.