Israeli Legislation.com

Commodities and Services Price Supervision (Infrastructure Tariffs in the Fuel Sector) Order, 5774-2014

צו פיקוח על מחירי מצרכים ושירותים (תעריפי תשתית במשק הדלק), תשע"ד-2014

Published: 2014-04-30Consolidated Hebrew text as of 2026-09-10 · Last amended 2020-05-21
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

First Schedule (Sections 1, 3, 6a, 7(a), (b) and (c), 8 and 12)

In this Schedule –

"MT" – metric tonne;

"KL" – kilolitre;

"KM" – kilometre.

(1)Under item 8a(b) there shall be listed segments in respect of which the Supervisor granted a permit as referred to in Section 6a(b) for an increase in the price of the addition to the basic construction tariff, specifying the number of the segment in respect of which such a permit was granted, the updated amount of the addition following the grant of the permit and the date of the first payment.
(2)The pumping tariff on line 12 from the Haifa refinery to Alroi does not include the additional cost of pumping petroleum products, which Bazan is entitled to charge; the pumping tariff at the exit from Ashdod Refinery Ltd. does not include the cost of pumping petroleum products from the Ashdod refinery, which Ashdod Refinery Ltd. is entitled to charge.
(3)A fixed component per kilolitre; paid once for each kilolitre; paid to TAHAL, except in cases where the entire pumping process (pumping and use of the pipeline) is carried out by Bazan, in which cases the fixed payment shall be paid to Bazan.
(4)A variable component; paid according to the length of the pumping in kilometres.
Table
Column A Infrastructure ServiceColumn B NotesColumn C Billing UnitColumn D Tariff in NISColumn E Quantity Update
1.Operational storage—KL/month9.96—
2.Long-term lease—KL tank capacity/month5.84—
3.Use of shore tanks—KL5.13—
4.Storage of fuel oil—MT/month21.25—
5.Storage of crude oil or atmospheric residue at the oil terminal in Kiryat Haim—MT/month10.56—
6.Dispensing of petroleum products to dedicated linesDispensing of petroleum products to end consumers connected by pipeline to the terminal, not including operational storage before dispensingKL5.70—
7.Transmission of fuel products and fuel oil in dedicated lines, where the pipeline is not owned by the consumer and the initial investment was made by TAHALFor end consumers connected by pipeline to the terminal, including capital recovery, line maintenance and cathodic protectionKM/year56,325.32Without quantity update
8.Maintenance of dedicated linesFor end consumers connected by pipeline to the terminal, including line maintenance and cathodic protection———
—(a)Where the pipeline is owned by the consumer—KM/year7,599.19Without quantity update
—(b)Where the pipeline is owned by TAHAL and the lines are not included in item 7Including line maintenance and cathodic protectionKM/year3,004.99Without quantity update, except for update of KM upon completion of construction of a new segment of a diesel backup line
8a.Construction of a diesel backup lineFor each segment whose construction has been completed———
—(a)Basic construction tariffAccording to the proportionate share of the segmentYear44,874,151.90—
—(b)Addition to the basic construction tariff(1)In the updated amount of the addition including the rate of increase permitted by the Supervisor pursuant to Chapter VI of the LawYear–—
9.Pumping of petroleum productsPumping, except on lines whose length does not exceed 2 kilometres, from the point of origin to the final destination designated by the consumer, including all pumping and use of the pipeline required to carry out the pumping (not including dispensing and transmission in dedicated lines)———
(a)Pumping on the Haifa–Ashdod line and the Alroi–Ashdod line(2)Fixed component(3)KL3.43—
Variable component(4)KL/KM0.081
(b)Pumping on all other lines(2)Fixed component(3)KL3.43—
Variable component(4)KL/KM0.112—
—(c)Pumping by Bazan Oil Refineries Ltd. (hereinafter – Bazan) from the Haifa refinery to line 1280 per cent of the tariff of sub-item (a)———
——Fixed component(3)KL2.74—
——Variable component(4)KL/KM0.064—
10.Pumping of fuel products on the Eshel Shizafon lineThe calculated amount shall be rounded upwards for any amount above half an agora, and any amount up to half an agora shall be rounded downwards. The amount is calculated according to the representative rate of the US dollar on the day the payment is made. This item shall not be updated as referred to in Section 7 of the Order, notwithstanding what is stated in that SectionMTThe tariff paid by TAHAL to the line owner for pumping on the lineWithout quantity update
11.Pumping of petroleum products, excluding pumping from a refineryPumping of petroleum products, including use of a pipeline whose length does not exceed two kilometres, as well as a service provided to an infrastructure company pumping petroleum products by another infrastructure companyKL4.35—
12.Pumping of fuel oilNot including operational storage before pumpingMT6.06—
13.Deleted————
14.Pumping of crude oil or atmospheric residue between the oil terminal in Kiryat Haim and the Haifa refinery—MT3.68—
15.Unloading or loading of petroleum products at the Haifa fuel portNot including storageMT12.29—
16.Unloading or loading of fuel oilNot including storageMT11.04—
17.Unloading of crude oil or atmospheric residue at the oil terminal in Kiryat HaimNot including storageMT7.96—
18.Pumping and filling of vessels with petroleum products or fuel oilIncluding operational storage before filling of the vesselMT5.73—
19.Leakage in the framework of pumpingPercentage of the product price, from the products listed below, paid once for each pumping, regardless of the number of storage tanks actually used in the course of the pumping:% of product price——
——(1) Petrol—0.17%—
——(2) Diesel—0.1%—
——(3) Jet fuel (aviation diesel)—0.1%—

Second Schedule (Sections 1, 6a and 7)

Second Schedule (Sections 1, 6a and 7) — table
SegmentThe proportional share of each segment of the total tariff of the lines listed in the Schedule
1.Ashkelon Uzza11.27%
2.Kadma Dalia Tzafit4.58%
3.Yesodot Kadma11.16%
4.Kadma Plugot7.13%
5.Tzomet Energia2.72%
6.Kadma Be'er Tuvia6.16%
7.Eshel6.52%
8.Uzza Eshel12.15%
9.Eshel Aroer15.73%
10.Aroer Mishor Rotem22.58%

Page 2 of 2

Read the entire law on one page — continuous text, no page breaks, plus formal citations.