Work Safety (Inspection of Pressure Installations) Regulations, 5727-1967

תקנות הבטיחות בעבודה (בדיקת מיתקני לחץ), תשכ"ז-1967

Published: 1967-08-03Consolidated Hebrew text as of 2023-09-18 · Last amended 2023-12-28
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

By virtue of my authority under Sections 31, 32, 33 and 61 of the Work Safety Ordinance, 1946 (hereinafter – the Ordinance), and Sections 14(a) and 2(d) of the Law and Administration Ordinance, 5708-1948, I hereby make these Regulations:

Definitions§

1.

In these Regulations –

"pressure installation" – a steam boiler, steam receiver or air receiver;

"boiler examiner" – a certified boiler examiner within the meaning of Section 31(14) of the Ordinance.

Preparation of steam boilers for inspection§

2.

In preparation for the inspection of a steam boiler pursuant to Section 31 of the Ordinance, the steam boiler shall be prepared internally and externally to afford free access to the boiler examiner, shall be made ready in all its parts and fittings for inspection, and shall be thoroughly cleaned; and without derogating from the generality of this provision, the following acts of preparation, making ready and cleaning shall be carried out:

(1)all doors and covers of openings in the steam boiler shall be opened, including manhole covers, handhole covers, mudhole covers and inspection openings;
(2)all bridges and rods shall be removed;
(3)all junction valves and supply valves shall be dismantled and thoroughly cleaned;
(4)all flue passages and all other parts of the steam boiler shall be scaled and thoroughly cleaned;
(5)every act shall be carried out in accordance with the instruction of the boiler examiner which in his opinion is necessary to enable him to carry out a thorough inspection of the steam boiler in all its parts and fittings; and among other things, the casing of the steam boiler, whether of brickwork or of other material, and the tubes and stay-rods of the steam boiler, shall be removed from the premises at the request of the boiler examiner.

Means and arrangements for carrying out the inspection§

3.

In preparation for the inspection of a steam boiler by a boiler examiner and during the carrying out of the inspection by him –

(1)all means, arrangements and assistance shall be placed at the disposal of the boiler examiner and the steam boiler shall be operated – all as the boiler examiner shall require for the purpose of carrying out a thorough inspection under the various tests involved therein;
(2)all tools, instruments and machines necessary for carrying out the inspection shall be provided.

Report on inspection of a steam boiler, heating furnace or heating table§

4.

A boiler examiner shall draw up the report on an inspection carried out by him pursuant to Section 31 of the Ordinance in the form set out below and shall indicate the particulars specified therein:

(1)a report on the inspection of a steam boiler, superheater and economiser when cold – in the form according to the First Schedule;
(2)a report on the inspection of a steam boiler, superheater and economiser when under normal steam pressure – in the form according to the Second Schedule;
(3)a report on the inspection of a heating furnace or heating table fitted with steam tubes – in the form according to the Third Schedule.

Report on inspection of a steam receiver or air receiver§

5.

A boiler examiner shall draw up the report on an inspection carried out by him pursuant to Sections 32 or 33 of the Ordinance in the form according to the Fourth Schedule and shall indicate all the particulars specified therein.

Delivery of the inspection report and a copy thereof§

6.

Within 21 days of the completion of an inspection of a pressure installation, the boiler examiner shall deliver the report on the inspection carried out by him pursuant to Sections 31, 32 or 33 of the Ordinance to the occupier of the factory or occupier of the premises in which the pressure installation is situated – and a copy thereof to the regional labour inspector.

Revocation§

7.

The Work Safety (Steam Boilers, Steam Receivers and Air Receivers) Regulations, 1947 – are hereby revoked.

Name§

8.

These Regulations shall be called "Work Safety (Inspection of Pressure Installations) Regulations, 5727-1967".

First Schedule (regulation 4)

Second Schedule (regulation 4)

Third Schedule (regulation 4)

Fourth Schedule (regulation 5)

RegulationsAdministrative Law

תקנות הבטיחות בעבודה (בדיקת מיתקני לחץ), תשכ"ז-1967

Pressure Installations Regulations

Work Safety Pressure Installations

Pressure Equipment Inspection

Taknotot Betichut Baavodah Pressure

Pressure Installations Safety

Work Safety Inspection Regulations

Pressure Vessels Regulations

Industrial Pressure Safety

Pressure Equipment Inspection Standards

5727-1967 Regulations