Israeli Legislation.com

Underground Railway (Metro) Law, 5782-2021

חוק רכבת תחתית (מטרו), תשפ"ב-2021

Published: 2021-11-18Consolidated Hebrew text as of 2026-08-03 · Last amended 2026-07-28✓ Amendment status checked against the Knesset legislation record on 2026-11-10
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

First Schedule (the definition "Metro Plan" in section 1 and section 16(a))

(1)National infrastructure plan for Metro Line M3 (NIP 103);
(2)National infrastructure plan for Metro Line M1 – Southern Segment (NIP 101/a);
(3)National infrastructure plan for Metro Line M1 – Central Segment (NIP 101/b);
(4)National infrastructure plan for Metro Line M2 (NIP 102);
(5)NMP 70/a.
(6)National infrastructure plan for Metro Line M1 – Northern Segment (NIP 101/c);
(7)National infrastructure plan for Metro Line M1 – Ta'as HaSharon Segment (NIP 101/d);
(8)National infrastructure plan for Metro Line M3 – Metro Operational Connections (NIP 103/b).

Second Schedule (section 38)

Second Schedule (section 38) — table
Local AuthorityProperty Tax Method Coefficient
1. Or Yehuda, Azor, Be'er Ya'akov, Givat Shmuel, Givatayim, South Sharon, Hod HaSharon, Kfar Sava, Lod, Nes Ziona, Kiryat Ono, Ramla, Ramat HaSharon, Ra'anana, Sedot Dan0.78
2. Bat Yam, Petah Tikva, Rishon LeZion, Rehovot0.88
3. Bnei Brak, Herzliya, Holon, Ramat Gan, Tel Aviv–Jaffa1

Third Schedule (section 85)

Definitions§

1.

In this Schedule –

"structure" – excluding any part of a structure that was built unlawfully;

"acoustic insulation" – any insulation measure whose purpose is the reduction of noise;

"acoustic insulation in a structure" – acoustic insulation installed on or integrated into the components of a structure, the purpose of which is to reduce the level of noise heard within the structure;

"efficiency rate of acoustic insulation in a structure" – the rate of reduction of the noise level by means of acoustic insulation in a structure, measured in accordance with the procedure of an implementing company, as approved by the Regulatory Council after consultation with the Ministry of Environmental Protection.

Loud or Unreasonable Noise§

2.
(a)Notwithstanding the provisions under the Abatement of Nuisances Law, noise originating from an act of an implementing company to advance the Metro Project shall be deemed loud or unreasonable noise for the purposes of section 2 of the Abatement of Nuisances Law, if both of the following conditions are met in respect thereof:
(1)it disturbs a person in the vicinity or passers-by;
(2)the noise level exceeds the higher of the following:
(a)during daytime hours – the maximum noise level under the Abatement of Nuisances Law plus 25 dB;
(b)during all hours of the day – the maximum noise level under the Abatement of Nuisances Law plus 20 dB, and for the purpose of acoustic shielding in a structure – plus the efficiency rate of the acoustic shielding in the structure;
(c)an equivalent noise level under the Abatement of Nuisances Law – taking into account the contribution of background noise plus 5 dB; for this purpose, the contribution of background noise shall be determined by means of measurements as set out in the provisions under the Abatement of Nuisances Law on the basis of a quarter-hour average.
(b)Measurement of the noise level for the purposes of subsection (a) shall be carried out at a distance of one metre outside the structure.
(c)Notwithstanding the provisions of subsection (a), none of the following shall be deemed to be noise originating from an act of an implementing company to advance the Metro Project that constitutes loud or unreasonable noise:
(1)the exceedance of the noise level referred to in subsection (a) in a structure in respect of which the measurement is being conducted does not exceed 10 dB, and does not exceed 250 hours in a calendar year and 40 hours in a month; the implementing company shall publish a public notice of the exceedance of the noise level in the area in which an exceedance is expected, in advance and as early as possible in the circumstances of the matter;
(2)the exceedance of the noise level during the day as referred to in subsection (a) does not exceed 30 dB for more than five consecutive hours in one day and all of the following conditions are met:
(a)approval of the Regulatory Council has been granted for the exceedance of the noise level, for reasons that shall be recorded; the Regulatory Council shall grant such approval up to ten times per year, but it may approve two additional exceedances if it has found that special circumstances exist that justify doing so;
(b)the implementing company has published a public notice of the exceedance of the noise level in the area in which an exceedance is expected, in advance and as early as possible in the circumstances of the matter.
(d)
(1)The implementing company shall measure and record the noise level pursuant to this Schedule in accordance with the directives of the Ministry of Environmental Protection and in accordance with the provisions of any law;
(2)The implementing company shall report to the Ministry of Environmental Protection, once a month, on the results of the measurement pursuant to this Schedule; the Ministry of Environmental Protection may require, in special circumstances, that such a report be submitted to it once a week, provided that it has given advance notice thereof to the implementing company; the Ministry of Environmental Protection shall publish the reports under this paragraph on its website.

Establishment of Alternative Acoustic Shielding§

3.

Notwithstanding the provisions under the Abatement of Nuisances Law and under the Planning and Building Law, where an implementing company is required in the course of performing an act to advance the Metro Project to demolish existing acoustic shielding, it shall be required to establish, upon completion of the works, alternative acoustic shielding equivalent to the acoustic shielding it demolished.

Operation of Machinery§

4.

Notwithstanding the provisions of the Abatement of Nuisances Law, for the purpose of performing an act to advance the Metro Project, an implementing company may operate machinery within its meaning under that Law or perform any work that does not involve causing loud or unreasonable noise as referred to in section 2 of this Schedule, for the purposes of excavation, construction, demolition or the like, in a residential area, at any hour of the day.

Unloading, Loading and Moving of Containers and Goods§

5.

Notwithstanding the provisions of the Abatement of Nuisances Law, for the purpose of advancing the Metro Project, an implementing company may perform unloading and loading operations or the moving of containers, in a residential area, at any hour of the day, in a manner that causes or is likely to cause noise, provided that the noise does not constitute loud or unreasonable noise as referred to in this Schedule; for this purpose, "containers" – includes waste containers, barrels, portable gas containers, goods and the like.

Page 9 of 9

Read the entire law on one page — continuous text, no page breaks, plus formal citations.