Oil Pipeline Concession Law, 5719-1959

חוק זכיון צינורות הנפט, תשי"ט–1959

Published: 1959-09-21Last amended 1959-10-27✓ Amendment status checked against the Knesset legislation record on 2026-09-09
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

Schedule B

The 11th day of Tammuz 5719 17 July 1959

'''Tri Continental Pipe Lines Ltd. and Eilat Pipeline Company Limited''' with the consent of the State of Israel

'''Sub-Concession Deed'''

This sub-concession deed made on the 11th day of Tammuz 5719 (17 July 1959), between Tri Continental Pipe Lines Ltd. (TRI CONTINENTAL PIPE LINES LTD.), a company organised and existing under the laws of Canada, whose principal office is at 231 Eighth Avenue West, Calgary, Alberta, Canada (hereinafter – the concessionaire), of the one part, and Eilat Pipeline Company Limited (EILAT PIPELINE COMPANY LIMITED), a company organised and existing under the laws of the State of Israel, whose registered office is at 20 Yehuda Halevi Street, Tel-Aviv (hereinafter – the pipeline company), of the other part, with the consent of the State of Israel, represented by the Government of Israel and acting through the Minister of Finance (hereinafter – the Government),

'''Witnesseth:'''

Whereas the concessionaire requested from the Government, and the Government granted to the concessionaire, pursuant to a concession deed bearing the same date as above, a concession for the transportation of petroleum and for the construction or acquisition, maintenance and operation of a pipeline or pipelines crossing the territory of Israel, as set out in greater detail in that concession deed;

And whereas pursuant to an agreement bearing the same date as above the concessionaire agreed, with the consent of the Government, to grant to the pipeline company a sub-concession in the form and on the terms of this deed,

'''Now therefore it is hereby declared as follows:'''

Meaning of terms§

1.

The expressions used in this sub-concession deed have the meaning assigned to them in the concession deed executed and signed on this day by the Government and by the concessionaire, unless a different meaning is implied by the context.

Subject Matter of the Sub-Concession§

2.
(a)The concessionaire, with the consent of the Government, hereby grants to the Pipeline Company, and the Pipeline Company hereby accepts from the concessionaire, the exclusive and non-transferable rights and licence —
(1)to transport through the pipeline, across the territory of Israel, to any point or points in Israel and to any point or points on the Mediterranean coast south of the boundary at Rosh HaNikra, crude oil imported through the Red Sea or originating at any place within the area situated between the Red Sea coast and an imaginary line drawn parallel to that coast at a distance of 50 (fifty) kilometres therefrom; and furthermore, no person other than the Pipeline Company shall have the right to transport across the territory of Israel from the Red Sea to any point or points in Israel and to any point or points on the Mediterranean coast south of the boundary at Rosh HaNikra, whether by pipeline or partly by pipeline and partly by other means, crude oil imported through the Red Sea or originating at any place within the area described above; and also
(2)to construct or acquire, maintain and operate, for the purpose of transporting crude oil, the Eilat–Haifa pipeline and one or more pipelines crossing the territory of Israel from any point or points on the coast of the Gulf of Eilat (hereinafter — the Eilat coast) to a point or points in Israel and to a point or points on the Mediterranean coast south of the boundary at Rosh HaNikra, as shall be agreed between the parties, and all pumping, storage and terminal installations and all other ancillary installations and to do all things necessary in connection therewith.
(b)The aforesaid exclusive and non-transferable rights and licence shall hereinafter be referred to as the "subject matter of the sub-concession".

Duration of the Sub-Concession§

3.

The duration of this sub-concession shall be a period commencing on the commencement date and ending upon the expiry of 49 (forty-nine) years, less one month, from the date of the first delivery, unless brought to an end at an earlier date as provided below.

Grant of Rights, Powers, Privileges and Immunities§

4.

The Pipeline Company shall have, in respect of and in connection with the subject matter of the sub-concession, all the rights, powers, privileges and immunities granted to the concessionaire under the concession deed, the Marine Installations and Services Agreement and the Tank Farm Services Agreement, and shall be entitled to exercise them, to the same full extent and with the same force and effect as if such rights, powers, privileges and immunities had been granted directly to the Pipeline Company in place of the concessionaire thereunder; without limiting in any way the foregoing, the Pipeline Company shall have — among other things — in respect of and in connection with the subject matter of the sub-concession, all the rights, privileges, powers and immunities of the concessionaire to acquire, use and dispose of land and interests in land, including long-term leases, sub-leases and rights-of-way, to receive an adequate supply of water, to import and export materials and equipment, to employ approved experts and other workers, to construct and use communications, port and maritime installations, to use tank farm installations and services, to use in emergencies the existing 8-inch pipelines referred to in section 10 of the concession, to enjoy privileges in respect of local currency and foreign currency, to enjoy exemptions from taxes, import duties and excise duties and to use and enjoy all such other rights, privileges, powers and immunities as are granted to the concessionaire and to sub-concessionaires of the concessionaire under the concession, under the Marine Installations and Services Agreement and under the Tank Farm Services Agreement.

Assumption of Obligations and Liabilities§

5.

The Pipeline Company hereby assumes and agrees to fulfil all the liabilities and obligations imposed upon the concessionaire, in respect of and in connection with the subject matter of the sub-concession, under the concession, under the Marine Installations and Services Agreement and under the Tank Farm Services Agreement, to the same full extent and with the same force and effect as if the Pipeline Company had directly assumed such liabilities and obligations in place of the concessionaire under the concession and under the said agreements, and to deduct and pay to the Government all taxes payable by an operator under the concession.

Fee§

6.

In consideration of the rights hereby granted to the Pipeline Company, the Pipeline Company shall pay to the concessionaire, for a period of 15 (fifteen) years from the date of the first delivery, in quarterly instalments, an annual fee of $160,000.- (one hundred and sixty thousand dollars) plus any other fee agreed upon between the two parties and approved by the Minister. Upon the expiry of the said period of 15 (fifteen) years the Pipeline Company shall pay to the concessionaire such fee, if any, as shall be agreed upon between the Pipeline Company and the concessionaire, but not more than $84,000.- (eighty-four thousand dollars) per year without the Minister's prior approval. In the absence of agreement, the Pipeline Company shall pay to the concessionaire such fee as shall be determined, upon the application of either party at any time or from time to time, by arbitration proceedings under section 15 of this sub-concession, but not more than $84,000.- (eighty-four thousand dollars) without the Minister's prior approval; in determining by arbitration what constitutes a fair and reasonable fee, due weight shall be given to the past profits of the Pipeline Company, to the estimate of its future profits, to its competitive position and to other factors relevant to the substance of the matter.

Enforcement§

7.

The Pipeline Company shall immediately notify the concessionaire of any breach or threatened breach by the Government of any of its obligations to the Pipeline Company, and the concessionaire shall have the right at any time or from time to time to enforce, on behalf of the Pipeline Company, the Government's obligations to the Pipeline Company, in any action, claim or proceeding brought by the concessionaire for that purpose; the concessionaire shall be entitled to recover the full amount of any payment due to the Pipeline Company. Any amount paid to the concessionaire as a result of any such action, claim or proceeding shall be held by it in trust for the Pipeline Company and the concessionaire shall deal with such amount solely in accordance with the instructions of the Pipeline Company, provided that the concessionaire shall be entitled to retain any such amount in satisfaction of amounts owed to it by the Pipeline Company or as security for the satisfaction of amounts that will become owed to it in the future by the Pipeline Company or that would in the ordinary course be payable to it by the Pipeline Company, whether as dividends, interest, fee or in any other form.

Nothing herein shall be deemed to derogate in any way from the right of the Pipeline Company to enforce the Government's obligations towards it under this sub-concession, save that any amount paid by the Government to the concessionaire as a result of any action, claim or proceeding brought by the concessionaire on behalf of the Pipeline Company shall discharge the Government, to the extent of such payment, from its obligations towards the Pipeline Company. In relation to all other matters pertaining to the subject matter of the sub-concession, the Pipeline Company shall be entitled to bring any proceeding, to institute and conduct any action and to sue and be sued in its own name.

Expansion of Capacity; Additional Pipelines§

8.
(a)The Pipeline Company shall be entitled to install and operate any additional installations required to increase the throughput capacity of the Eilat–Haifa pipeline, in accordance with the provisions of section 11 of the concession.
(b)Whenever the concessionaire itself undertakes to construct, or permits — in accordance with the concession — any other person to construct, additional pipelines for the transport of oil other than crude oil (or for the transport of crude oil where the Pipeline Company refuses to provide, or does not provide, pursuant to subsection (a), additional installations for the transport of crude oil) on or over any strip of land on or in respect of which the Pipeline Company holds a right-of-way, the Pipeline Company agrees to effect such transfers of its right-of-way, or to permit such use of the said right-of-way, as may be required or desirable and to cooperate fully and in all respects in order to facilitate the completion of such construction and to permit the concessionaire or such other person to maintain and operate such additional pipelines.
(c)Any demand received by the concessionaire from the Government in relation to the expansion of the Eilat–Haifa pipeline pursuant to section 11 of the concession shall be forwarded immediately by the concessionaire to the Pipeline Company.

Indemnification§

9.

The Pipeline Company hereby agrees to indemnify the concessionaire and to keep it harmless from any liability, loss or damage which the concessionaire may incur or suffer as a result of anything done or omitted to be done by the Pipeline Company under this sub-concession or under any of the concession documents, or in connection with the operation of the Eilat–Haifa pipeline.

Events of Termination of the Sub-Concession; Remedies§

10.

Notwithstanding any provision in this sub-concession to the contrary, the following shall constitute events each of which shall serve the concessionaire as grounds for terminating the rights granted under this sub-concession:

(a)failure by the Pipeline Company to pay, within 30 (thirty) days after the date on which payment fell due, the fee specified in section 6 above, or interest or amortisation on any bonds of the Pipeline Company held by the concessionaire, or any debt owed by the Pipeline Company to the concessionaire;
(b)any material breach or non-performance by the Pipeline Company of its obligations towards the concessionaire under this sub-concession (other than failure by the Pipeline Company to pay the fee specified in section 6 above) and such breach or non-performance is not remedied within a reasonable time after written notice by the concessionaire specifying the said breach or non-performance; or if the Pipeline Company, after a reasonable request by the concessionaire, fails to do any act or adopt any course of conduct required under this sub-concession, under the concession or under the concession documents or under the applicable law, or fails to cease or refrain from doing any act or adopting any course of conduct prohibited under this sub-concession, under the concession or under the concession documents or under the applicable law, as the case may be;
(c)the voluntary winding-up of the Pipeline Company without the prior consent of the concessionaire or the compulsory winding-up of the Pipeline Company by virtue of a final order of a court of competent jurisdiction;
(d)the termination of the concession for any reason whatsoever.

Upon the occurrence of any of the events listed above, the concessionaire shall have the right, at its election, to terminate this sub-concession and all the rights and privileges of the Pipeline Company under this sub-concession. Nothing herein shall be deemed to limit the right of the concessionaire to recover damages for any breach of this sub-concession or for any breach of any other obligation of the Pipeline Company towards the concessionaire not specifically enumerated herein, or its right to seek any other remedies provided for in this sub-concession or in any other agreement between the parties or any other remedy provided by law.

Obligations upon Termination of the Sub-Concession§

11.

If this sub-concession is terminated on any other ground (otherwise than as a result of the event described in section 10(d) of this sub-concession), the concessionaire shall be entitled, at its election, to take over, or to permit any other person with the prior approval of the Government to take over, the operation of the crude oil pipelines operated by the Pipeline Company, and the Pipeline Company shall take all steps necessary to facilitate such taking over, including — without limitation — the transfer to the concessionaire, or to the person selected by it and approved by the Government, of all rights-of-way, interests in land and water rights, the assignment of all existing contracts and the delivery of appropriate title certificates vesting in the concessionaire or in such other person all the rights, property rights and interests of the Pipeline Company in the said pipelines and all their ancillary installations, and all vehicles, machinery, equipment, materials and spare parts used in their operation. Upon such transfer and delivery, the concessionaire shall pay, or cause to be paid, to the Pipeline Company the original cost to the Pipeline Company of the assets and property so transferred and delivered, less depreciation as recorded in the books of the Pipeline Company and less any amounts then owed by the Pipeline Company to the concessionaire, whether as damages for non-performance or otherwise, and less all expenses incurred by the concessionaire in connection with the termination of this sub-concession.

Status of the Pipeline Company§

12.

Nothing in this sub-concession shall be construed as making the Pipeline Company the agent of the concessionaire for any purpose whatsoever. No right or authority is granted to the Pipeline Company to assume or create any obligation or liability, whether express or implied, in the name of the concessionaire or to bind the concessionaire in any way whatsoever.

Access to Records; Receipt of Reports§

13.

The Pipeline Company shall at all times make available to the concessionaire, for inspection at the offices of the Pipeline Company during reasonable hours, all its ledgers and accounts, records, lists and documents of every description, and shall furnish to the concessionaire, through its appropriate officers, all information that may be required by it on all matters relating or pertaining to the construction or acquisition, maintenance and operation of the crude oil pipelines or to the business of the Pipeline Company. Without limiting in any way the foregoing, it is specifically understood and agreed that the concessionaire shall be entitled to receive, immediately upon their completion, all reports and budgets submitted by the Pipeline Company to the Government pursuant to the Throughput and Tariffs Agreement.

Arbitration§

14.
(a)If at any time during or after the period of the sub-concession any doubt, dispute or difference shall arise between the parties regarding the interpretation or performance of this sub-concession or of anything connected therewith, or regarding the rights and duties of the parties to this sub-concession, then if agreement has not been reached to settle the doubt, dispute or difference by other means, the matter shall be referred to a sole arbitrator — whether a resident of Israel or a non-resident — upon whom the parties shall agree. If the parties fail to agree upon an arbitrator within 30 (thirty) days after a demand therefor by either party, either party may request the President of the International Chamber of Commerce in Paris to appoint an arbitrator. The decision of the arbitrator shall be final and binding upon the parties. The place of arbitration shall be determined by agreement of the parties and in the absence of agreement the place of arbitration shall be Jerusalem.
(b)If the parties agree that the said doubt, dispute or difference is of a technical or accounting nature, or where the concession documents provide that such a doubt, dispute or difference shall be referred to an expert, and agreement between the parties to settle the matter by other means has not been reached, the doubt, dispute or difference shall be referred to an expert — whether a resident of Israel or a non-resident — upon whom the parties shall agree. If the parties fail to agree upon an expert within 30 (thirty) days after a demand therefor by either party, either party may request the President of the International Chamber of Commerce in Paris to appoint an expert. The expert, whether appointed by the parties or by the said President, shall not be regarded as an arbitrator and the provisions of the Arbitration Ordinance shall not apply to him. He shall not be subject to any rules of procedure, evidence or law, and his decision shall be final.

Any reference to arbitration or to an expert and any agreement or appearance under this section or under section 43 of the concession may be effected by the concessionaire in its own name and on behalf of the Pipeline Company, and the concessionaire shall be deemed to be authorised to effect such reference to arbitration or to an expert, such agreement or such appearance on behalf of the Pipeline Company in any proceeding under this section or under section 43 of the concession, unless, within 10 (ten) days after a demand under subsection (a) for the appointment of an arbitrator or after a demand under subsection (b) for the appointment of an expert, the Pipeline Company gives notice to the Government and to the concessionaire in which it expressly insists upon its wish to be represented therein separately and independently.

Place and Manner of Payment§

15.

The fee payable by the Pipeline Company to the concessionaire under section 6 above and any damages payable by the Pipeline Company to the concessionaire as a result of any breach, non-performance or non-fulfilment of the obligations of the Pipeline Company shall be payable in United States dollars at such place in the State of Israel or in any other country that has diplomatic relations with Israel as the concessionaire may specify at any time or from time to time.

Transfer; Additional Sub-Concessions and Licences§

16.

The rights hereby granted to the Pipeline Company shall not be transferable by it without the prior written consent of the Government and the concessionaire. The concessionaire reserves to itself the right to construct or acquire, maintain and operate pipelines in Israel for the transport of oil other than crude oil. The concessionaire reserves to itself the right to grant, in accordance with the provisions of the concession, additional sub-concessions and additional licences to construct or acquire, maintain and operate pipelines in Israel for the transport of oil other than crude oil, and to grant to any such sub-concessionaire or licensee any right or privilege from among the rights and privileges granted to the concessionaire under the concession, to the extent that this shall not impair or infringe the rights and privileges granted to the Pipeline Company under this sub-concession. The concessionaire shall have the absolute right to transfer its rights and obligations under this sub-concession in accordance with section 45 of the concession.

Successors and Assigns§

17.

This sub-concession shall pass with all its obligations and benefits to the successors and assigns of the parties thereto.

Notices§

18.

Whenever notices, requests, demands or information are required to be given under this sub-concession (all of which are herein referred to as "notices"), the notices shall be in writing and shall be deemed to have been duly given if sent by registered prepaid post to the parties at the following addresses:

Eilat Pipeline Company Ltd. — c/o S. Horowitz & Co., 20 Yehuda Halevi Street, Tel Aviv.

Tri Continental Pipe Lines Ltd. — c/o S. Horowitz & Co., 20 Yehuda Halevi Street, Tel Aviv.

Or at such other address as either party shall notify to the other by a similar notice. Any notice so sent shall be deemed to have been given upon the expiry of 10 (ten) days from the date of registration of the letter containing the notice when properly addressed. Any notice sent to the concessionaire under the concession that relates to the subject matter of the sub-concession shall be forwarded immediately by the concessionaire to the Pipeline Company, unless a similar notice has been sent to the Pipeline Company.

Waiver§

19.

A waiver by one party to the other of a breach of any provision of this sub-concession shall not be construed as a waiver of any subsequent breach of the same provision or of any other provision of a similar or different nature.

Renewal§

20.

If upon or before the expiry of the concession period the concessionaire receives an extension of the concession from the Government, the Pipeline Company shall be entitled to request from the concessionaire an extension of this sub-concession on such terms and conditions as shall be reasonable in the circumstances prevailing at that time, and the concessionaire agrees to give favourable consideration to such a request.

Headings or Marginal Notes§

21.

The headings or marginal notes in this sub-concession are for the convenience of the parties only and shall be disregarded entirely when construing its provisions.

Waiver of Notarial Notice§

22.

The parties to this sub-concession hereby waive the need for notarial notice or any other formal notice or protest in respect of any breach, non-performance or non-fulfilment of any of its provisions.

Oral Modifications Prohibited§

23.

This sub-concession may not be modified or terminated orally.

Governmental Action§

24.

Anything which under this sub-concession the Government is permitted to do or perform, or is required to do or perform, and any consent which is required to be given by the Government, shall be duly done and performed and the consent shall be duly given by the Minister or by any person appointed by his signature for that purpose.

Construction§

25.

This sub-concession deed shall not be construed as a transfer of the concession, in whole or in part, nor shall it be construed as modifying or enlarging any of the rights, powers, privileges and immunities granted to the concessionaire under the concession or under the concession documents.

Commencement Date§

26.

This sub-concession deed shall enter into force on the date on which the concession deed enters into force as determined in Section 58 of the concession.

'''In witness whereof the parties have hereunto set their hands to this sub-concession deed on the day and year first written above.'''