Planning and Building Order (Exemption from Plan and Permit for the Placement of a Mobile Substation), 5779-2019

צו התכנון והבנייה (פטור מתכנית והיתר להצבת תחנת משנה ניידת), תשע"ט-2019

Published: 2019-05-01Consolidated Hebrew text as of 2022-06-30 · Last amended 2024-06-24
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

By virtue of my authority under Section 266e(b) of the Planning and Building Law, 5725-1965 (hereinafter – the Law), and after consultation with the National Council for Planning and Building, I hereby order as follows:

Definitions§

1.

In this Order –

"site" – a temporary location for a mobile substation within the boundaries of the area as marked and detailed in the map in the Schedule signed on the 9th of Nisan 5779 (14 April 2019);

"holder of a right in real property" – an entity whose consent is required for a permit application, pursuant to regulation 36(f) of the Planning and Building (Building Licensing) Regulations, 5776-2016;

"mobile substation" – a transportable structure, including a transformer, which connects to the overhead electricity network by means of wires and includes one trailer or two trailers.

The Exemption and Its Conditions§

2.

I hereby permit the Israel Electric Corporation to place a mobile substation at a site and to use it, exempt from a plan and from a permit, provided that all of the following conditions are met:

(1)the consent of the holder of a right in real property in which the site is located has been obtained;
(2)the area of a mobile substation shall not exceed 150 square metres, and its height shall not exceed 10 metres; the height of the fence surrounding it shall not exceed 3 metres;
(3)the placement of a mobile substation and its use shall be until the 5th of Cheshvan 5783 (30 October 2022), at the latest;
(4)the placement of the mobile substation shall be beneath existing 161 or 400 kilovolt lines and the location, height and form of the existing electricity pylons shall not change.

Restoration of the Previous State§

3.

Upon the establishment of the permanent substation and after its energisation pursuant to the approval of the Director of the Electricity Administration, or upon the expiry of this Order, whichever is the earlier, the Israel Electric Corporation shall dismantle the mobile substation, and the area shall be rehabilitated and restored to its previous state, including treatment of invasive species; upon completion of the works and rehabilitation of the area, an as-made plan shall be prepared and a copy thereof shall be transferred to the offices of the District Committee for the Central District, to the offices of the Local Committee Lev HaSharon and to the Planning Administration in the Ministry of Finance.

Schedule (Section 1)

(1)A site west of Sha'ar Ephraim, within the boundaries of the Lev HaSharon Regional Council:

9th of Nisan 5779 (14 April 2019)

Moshe Kahlon

Minister of Finance

OrderReal Estate & Land

צו התכנון והבנייה (פטור מתכנית והיתר להצבת תחנת משנה ניידת), תשע"ט-2019

Planning and Building Order Mobile Substation

Mobile Substation Exemption Order 2019

Tzav Takhnun Uveniya Mobile Substation

Planning and Building Mobile Substation Permit

Mobile Substation 5779-2019

Exemption from Plan Mobile Substation

Mobile Substation Placement Order

Planning Building Order 2019 Mobile

Takhnun Uveniya Mobile Substation Exemption