Electricity Sector Regulations (Rules, Conditions and Cases for the Interruption of Electricity Supply), 5763-2003

תקנות משק החשמל (כללים, תנאים ומקרים להפסקת אספקת חשמל), תשס"ג-2003

Published: 2003-02-20Consolidated Hebrew text as of 2026-10-11 · Last amended 2020-05-21
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

By virtue of my authority under Sections 17(d) and 63 of the Electricity Sector Law, 5756-1996 (hereinafter – the Law), and with the approval of the Labour, Welfare and Health Committee of the Knesset, pursuant to Section 48(a) of Basic Law: The Government, and Section 2(b) of the Penal Law, 5737-1977, I hereby promulgate the following Regulations:

Chapter I: Interpretation

Definitions§

1.

In these Regulations –

"standards" – the standards set by the Authority pursuant to Sections 30(2) and 33 of the Law;

"building" – as defined in the Planning and Building Law, 5725-1965;

"connection size" – the size of the main circuit breaker installed at the entrance to an electrical installation;

"interruption of electricity supply" – a planned interruption, restriction, reduction or disconnection of electricity supply to a building or premises;

"adaptation of connection" – including the removal of a connection line, its reinstallation at the same location or at a different location;

"connection" – the connection of a building or premises to the electricity network, including the enlargement thereof or the adaptation of a connection, all whether on an overhead or underground network and at any voltage;

"consumer's installation" – an electrical installation commencing at the meter terminals in the direction of the consumer's premises;

"Director of Electricity Affairs" – the Director under the Electricity Law, 5714-1954;

"supplier" – the holder of a licence as a supplier of an essential service;

"connection line" – a line serving to convey electricity from the electricity network to the terminals of the consumer's installation.

Interruption of Electricity Supply for Safety Reasons§

2.

A supplier may carry out an interruption of electricity supply upon the occurrence of any one of the following:

(1)the consumer's installation or part thereof, or an alteration to be made in the consumer's premises, causes or is liable to cause damage to property or persons;
(2)the consumer has breached a provision of any enactment or any safety provision approved by the Minister or the Director of Electricity Affairs, relating to the maintenance or handling of electrical equipment;
(3)the consumer has exceeded the connection size approved for the premises, or has consumed electricity in a manner that interferes or is liable to interfere with the regular supply of electricity to other consumers;
(4)the interruption of electricity is required for the purpose of carrying out operations necessary for the fulfilment of the conditions of the supplier's licence, as detailed in Section 46(a) of the Law;
(5)in the opinion of the supplier, the demand for electricity exceeds or may exceed the supply capacity of its installations, in a manner liable to damage them;
(6)pursuant to a provision of any law or a competent authority, the supplier is required to carry out an interruption of electricity.

Interruption of Electricity Supply due to Consumer Violations§

3.

In addition to what is stated in regulation 2, a supplier may carry out an interruption of electricity supply upon the occurrence of any one of the following:

(1)the consumer has not paid a bill on time, or a bill of exchange, cheque or other undertaking given by the consumer for the payment of such a bill has not been honoured, all in accordance with the standards and in particular the provisions concerning bills and payments as set out in the standards;
(2)use of electricity unlawfully.

Prior Notice§

4.
(a)An interruption of electricity supply as referred to in regulations 2 and 3 shall be carried out only after the supplier has given notice of the interruption of electricity to all consumers whose electricity supply is expected to be interrupted, at the time, by the means and in the manner set out in the standards, except in cases where there exists, or is liable to exist, a danger to persons or property.
(b)Where prior notice has been given to a consumer as referred to in sub-regulation (a), the supplier shall not carry out an interruption of electricity supply if, during the notice period, the ground for giving the notice has ceased to exist or if the consumer has complied with the supplier's instruction sent to the consumer.

Cessation of the Ground for Interruption of Electricity Supply§

5.
(a)Upon the cessation of the ground for the interruption of electricity supply pursuant to regulations 2(1) to (5) and 3, the supplier shall act in accordance with the standard concerning planned electricity interruptions.
(b)An interruption of electricity pursuant to regulation 2(6) shall not continue beyond the period permitted under that law or the instruction of the competent authority.

Disconnection of Supply outside Premises§

6.
(a)Where the authorised employees of the supplier are unable to enter the premises in order to carry out an interruption of electricity supply and all matters connected therewith, following lawful notice having been given, the supplier shall be entitled to carry out the interruption of electricity supply at a point located outside the premises, or at the supplier's electricity network.
(b)Where the supplier is required to disconnect electricity supply to a consumer outside the premises as referred to in sub-regulation (a), and as a result damage is caused to another, the consumer or any other person, including the supplier, shall bear the damage in accordance with the determination of the Authority and subject to any law.

Reconnection of Electricity Supply after Its Disconnection§

7.
(a)If a ground for disconnection as listed in Regulations 2 or 3 has continued to subsist for more than two years from the date of disconnection, the supplier may dismantle the network.
(b)Where a consumer has requested the reconnection of electricity supply that was interrupted, and two years or more have elapsed since the disconnection, the consumer shall submit an application for connection to premises that are not connected to the electricity network, in accordance with the provisions of the standards and any law.

Commencement§

8.

These Regulations shall come into force 30 days from the date of their publication.

18 Shevat 5763 (21 January 2003)

Efraim Eitam

Minister of National Infrastructures

RegulationsCriminal Law

תקנות משק החשמל (כללים, תנאים ומקרים להפסקת אספקת חשמל), תשס"ג-2003

Electricity Sector Regulations 2003

Electricity Supply Interruption Regulations

Takkanot Meshek Hashmal 5763

Electricity Supply Regulations

Electricity Disconnection Regulations

Meshek Hashmal Regulations

Electricity Service Interruption Law

Power Supply Cutoff Regulations

Israeli Electricity Regulations 2003