Electricity Sector (Extension of the Period of Validity of the Israel Electric Corporation's Licences and Implementation of the Structural Change in the Electricity Sector) Order, 5768-2007

צו משק החשמל (הארכת תקופת תוקפם של רישיונות חברת החשמל ויישום השינוי המבני במשק החשמל), תשס"ח-2007

Published: 2007-10-31Consolidated Hebrew text as of 2026-10-12 · Last amended 2020-05-21
Premium
Unofficial English translation — for reference only. It may contain errors or omissions and cannot be relied on as a legal text. Only the Hebrew text published in Reshumot is legally binding.More

This English text was translated from the official Hebrew using a range of translation tools, and it undergoes ongoing checks and updates. It is not a certified translation.

Despite these checks, it may contain errors, omissions, or imprecise renderings of legal terminology and cross-references, and it may not yet reflect the latest amendments. It cannot be relied upon as a legal text.

The Hebrew text as published in Reshumot (ספר החוקים) and on the Knesset website is the sole authoritative and legally binding version. In any discrepancy, the Hebrew text prevails.

This translation is provided for informational purposes only and does not constitute legal advice. For use in legal proceedings, request a certified Expert Legal Opinion.

By virtue of our authority under Section 60(d7)(2)(b) of the Electricity Sector Law, 5756-1996 (hereinafter – the Law), and after consultation with the Public Utilities Authority – Electricity and with the Government Companies Authority, we hereby order as follows:

Extension of Validity of Licences§

1.

The validity of the licences as defined in Section 60(d4) of the Law and the validity of the licences granted to the Israel Electric Corporation under Section 60(d5) of the Law for all the activities carried out by the Israel Electric Corporation are hereby extended as follows:

(1)with respect to generation licences and a transmission licence – for the period from the 21st of Heshvan 5768 (2 November 2007) to the 28th of Sivan 5768 (1 July 2008);
(2)with respect to distribution licences and supply licences – for the period from the 21st of Heshvan 5768 (2 November 2007) to the 9th of Tammuz 5769 (1 July 2009).

Establishment of Generation Corporations§

2.
(a)By the 28th of Sivan 5768 (1 July 2008), several corporations shall be established as subsidiaries of the Israel Electric Corporation Ltd. (hereinafter – the Israel Electric Corporation), in accordance with the provisions of the Law and the Government Companies Law, 5735-1975 (hereinafter – the Government Companies Law), which shall engage in generation activity (hereinafter – the generation corporations) and which shall operate the power stations operated by the Israel Electric Corporation.
(b)By the 3rd of Heshvan 5769 (1 November 2008), the arrangements required with respect to the capital structure, including the assets and liabilities, for the purpose of the activity of the generation corporations, as well as any additional arrangement required for the purpose of carrying out their activity, shall be completed.
(c)By the 5th of Tevet 5769 (1 January 2009), the economic and operational arrangements between a generation corporation and the other corporations referred to in this Order shall be completed.

Establishment of the Transmission Corporation§

3.
(a)By the 15th of Tevet 5770 (1 January 2010), a corporation (hereinafter – the transmission corporation) shall be established, in accordance with the provisions of the Government Companies Law, as a subsidiary of the Israel Electric Corporation, which shall engage in the construction and operation of the electricity network of the holder of a transmission licence.
(b)By the 17th of Iyyar 5770 (1 May 2010), the arrangements required with respect to the capital structure, including the assets and liabilities, for the purpose of the activity of the transmission corporation, as well as any additional arrangement required for the purpose of carrying out its activity, shall be completed.
(c)By the 19th of Tammuz 5770 (1 July 2010), the economic and operational arrangements between the transmission corporation and the other corporations referred to in this Order shall be completed.

Establishment of the System Management Corporation§

4.
(a)By the 28th of Sivan 5768 (1 July 2008), a corporation (hereinafter – the system management corporation) shall be established, in accordance with the provisions of the Government Companies Law, which shall engage in carrying out the actions required of the holder of a system management licence.
(b)By the 3rd of Heshvan 5769 (1 November 2008), the arrangements required with respect to the capital structure, including the assets and liabilities, for the purpose of the activity of the system management corporation, as well as any additional arrangement required for the purpose of carrying out its activity, shall be completed.
(c)By the 5th of Tevet 5769 (1 January 2009), the economic and operational arrangements between the system management corporation and the other corporations referred to in this Order shall be determined.

Establishment of Distribution Corporations§

5.
(a)By the 9th of Tammuz 5769 (1 July 2009), several corporations shall be established as subsidiaries of the Israel Electric Corporation in accordance with the provisions of the Law and the Government Companies Law, which shall engage in distribution activity (hereinafter – the distribution corporations) and which shall operate the distribution zones operated by the Israel Electric Corporation.
(b)By the 5th of Adar 5769 (1 March 2009), the arrangements required with respect to the capital structure, including the assets and liabilities, for the purpose of the activity of the distribution corporations, as well as any additional arrangement required for the purpose of carrying out their activity, shall be completed.
(c)By the 7th of Iyyar 5769 (1 May 2009), the economic and operational arrangements between the distribution corporations and the other corporations referred to in this Order shall be completed.

Supply Activity§

6.

By the 9th of Tammuz 5769 (1 July 2009), the arrangements required with respect to supply activity shall be completed so as to enable the grant of a supply licence on the determining date.

Savings Provisions§

7.

Nothing in the provisions of this Order shall derogate from the obligation to obtain a licence for activities in the electricity sector, in accordance with the provisions of the Law and any law.

19th of Heshvan 5768 (31 October 2007)

Roni Bar-On Binyamin (Fuad) Ben-Eliezer

Minister of Finance Minister of National Infrastructures

OrderAdministrative Law

צו משק החשמל (הארכת תקופת תוקפם של רישיונות חברת החשמל ויישום השינוי המבני במשק החשמל), תשס"ח-2007

Electricity Sector Order 2007

Electricity Order 5768

Israel Electric Corporation licenses order

Structural change electricity sector

IEC licence extension order

Electricity Market Restructuring Order

Tzav Meshek Hashmal

Electric utility licensing order

Electricity sector reform 2007

Israeli electricity restructuring